Section 1
Department of Energy HP. NG ME Si
National Nuclear Security Administration MM NE Da I=
Washington, DC 20585
May 14, 2019
MEMORANDUM FOR THE ADMINISTRATOR
FROM: CHARLES P. VERDON
DEPUTY ADMINISTRATOR (ReKee Pil arabe.
FOR DEFENSE PROGRAMS
SUBJECT: ACTION: Sign the Attached PME Authority to Redelegate
UCEP Subprojects 010 and 020 to the Associate Deputy
Administrator for NA-11.
ISSUE: Delegation of the Project Management Executive (PME) authority for the Ula
Complex Enhancement Project (UCEP), Subprojects 010 and 020, at the Nevada
National Security Site (NNSS).
BACKGROUND: UCEP is a congressional line-item construction project that is
preparing an underground laboratory at the NNSS Ula Complex. This construction
project enables new experimental and diagnostic capabilities and an increased operational
cadence of subcritical weapons experiments using plutonium.
UCEP Subproject 010 is the Enhanced Capabilities for Subcritical Experiments (ECSE)
Access and Life Safety Infrastructure subproject. This subproject constructs the
underground drifts to improve egress, support, and refuge station systems. The
subproject has achieved critical decision (CD) 2/3, and the baselined cost is $50.1
million.
UCEP Subproject 020 is the ECSE Laboratory and Support Infrastructure. This
subproject constructs the Ula Complex’s new ECSE underground laboratory to include
ventilation, mechanical, electrical, fire protection and life safety, control and diagnostics,
and containment plug structures, systems, and components. The subproject now has
achieved CD-1, and the cost range is $60.6 million to $124.7 million.
PME authority for UCEP Subprojects 010 and 020 is currently delegated to the Deputy
Administrator for Defense Programs. Considering the tunneling is a routine activity at
NNSS, and the majority of the nuclear safety systems being installed already exist in
other areas of Ula Complex, the PME authority for these projects is deemed more
appropriate for the Associate Deputy Administrator (ADA) for Research, Development,
Test, and Evaluation (NA-11).
Following the proposed delegation, PME authority will rest within the same program
office as before the change, the Office of Defense Programs (NA-10). However,
@
the Senior Executive Service position that maintains the most project interaction and
equity.
SENSITIVITIES: None.
POLICY IMPACT: None.
URGENCY: None.
RECOMMENDATION: Sign the attached PME authority delegation for UCEP
Subprojects 010 and 020 to the Associate Deputy Administrator for NA-11.
APPROVE: WN DISAPPROVE: NEEDS DISCUSSION: DATE: <\as\ |
Attachment
cc:
R. Raines, NA-APM
M. Peek, PM-1
C. Manning, NA-APM-20
B. Bangerter, NA-APM
K. Alexander, NA-11
S. Lawrence, NFO
D. Bowman, NFO
K. Keilholtz, NA-113
N. Frazier, NA-113
S. Wilk, NA-113
DEPARTMENT OF ENERGY
NATIONAL NUCLEAR SECURITY ADMINISTRATION
DELEGATION OF PROJECT MANAGEMENT EXECUTIVE RESPONSIBILITIES
FOR THE U1A COMPLEX ENHANCEMENT PROJECT SUBPROJECTS 010 AND 020
DELEGATION. Under the authority vested in me under Section 3212 of the National
Nuclear Security Administration (NNSA) Act (50 U.S.C. 2402) and in accordance with
Department of Energy Order 413.3B, Program and Project Management for the
Acquisition of Capital Assets, the Project Management Executive (PME) Authority for
the Ula Complex Enhancement Project (UCEP) Subprojects 010 and 020 is delegated to
the Associate Deputy Administrator for Research, Development, Test, and Evaluation
(NA-11) within the Office of Defense Programs. This authority encompasses the project
management aspects relating to the UCEP Subprojects 010 and 020 including Advisory
Board equivalents, Critical Decisions, and Quarterly Project Reviews, except for those
specifically reserved for the Administrator or the Deputy Secretary of Energy.
Section 2
RESCISSION. All Project Management Executive Authority delegations previously
issued for this project are hereby rescinded.
LIMITATION.
3.1 ‘In exercising the authority delegated herein, the delegate is governed by the
applicable rules and regulations of the Department of Energy and the policies and
procedures of the Secretary.
3.2 Nothing in this delegation precludes the Secretary from disapproving any
Administration-specific policy or exercising any of the authority delegated by this
delegation whenever in the Secretary's judgment the exercise of that authority is
necessary or appropriate to administer the functions vested in the Secretary.
3.3. The authorities delegated herein shall only be exercised with regard to NNSA
employees, contractors, or activities.
3.4 Any amendments to this delegation shall be in consultation with the NNSA
General Counsel.
3.5 Nothing in this Delegation precludes the Administrator from exercising any of the
authority delegated in this Delegation.
AUTHORITY TO REDELEGATE. The PME authority as stated in this Delegation may
not be redelegated.
EFFECTIVE DATE.
5.1 Acopy of this delegation shall be provided to NNSA’s Business Services Office.
5.2 This delegation is effective immediately.
. ad
5.3. Dated this oo day of May 2019.
Chik Le
Lisa E. Gordon-Hagerty
Under Secretary for Nuclear Security
Administrator, NNSA