NA-2023-DES-NA1-NAESH-01, Designation to Ahmad Al-Daouk, Associate Administrator for Environment, Safety, and Health
Rescinds:
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
3
Attachment 1
Referencei Function Responsibilities NNSA CSO Designation of Authority
10 CFR Part 820 Secretarial Officer Exemption Relief Grant a temporary or permanent exemption to 10 CFR Part 830.
10 CFR Part 830 DOE Management Official
Safety Basis Approval
(Facility Safety/Design)
Approve safety basis documents for nuclear facilities (e.g., reactors, explosive facility,
transportation activities, transportation of materials of National Security).
DOE O 420.IC Secretarial Officer Approve safety basis documents in accordance with DOE-STD-1104-2016.
DOE O 413.3B Program Secretarial Officer
Safety Basis Approval Authority
Approve documentation supporting integration of safety analysisii for new Hazard Category 1,
2, and 3 nuclear facilities via Safety Review Letter or Safety Evaluation Report.
DOE O 425.1D
Program Secretarial Officer
Startup Authorization Authority
Startup and Restart
Approval Authority
Initial startup of a newly constructed Hazard Category 2 nuclear facility (not activity or
operation) with a new DSA and associated TSRs.
Initial startup of a newly constructed Hazard Category 2 or 3 nuclear activity or operation with
a new DSA and associated TSRsiii
Initial startup after conversion of an existing facility to a Hazard Category 2 nuclear facility
with a new DSA and associated TSRs.
Restart of a nuclear facility, activity, or operation that has upgraded its Hazard Categorization
to Hazard Category 2.iv
DOE O 413.3B
Conduct an Operational Readiness Review or Readiness Assessment for Hazard Category 1,
2, and 3 nuclear facilities in accordance with DOE O 425.1D.
For non-nuclear projects, conduct a formal assessment of the project's Readiness to Operate,
as appropriate.
DOE O 425.1Dv
Program Secretarial Officer
Startup Authorization Authority
Startup and Restart
Approval Authority
Initial startup of a newly constructed Hazard Category 3 nuclear facility (not activity or
operation) with a new DSA and associated TSRs.
Initial startup after conversion of an existing facility to a new Hazard Category 3 nuclear
facility with a new DSA and associated TSRs.
Restart of a nuclear facility, activity, or operation that has upgraded its Hazard Categorization
to Hazard Category 3.
Restart for an extended shutdown of a Hazard Category 1 or 2 nuclear facility, activity, or
operation.vi
Restart for a shutdown because of substantial process, system, or facility modifications to a
Hazard Category 1 or 2 nuclear facility, activity, or operation.
i Based on most current version or successor document when the Designation Order was generated and/or effective date of Designation Order
ii Includes Safety Design Strategy, Conceptual Safety Design Report, Preliminary Safety and Design Results, and Preliminary Documented Safety Analysis
iii Per DOE O 425.1D, approval to start must be granted by an official of a level commensurate with the DSA Approval Authority
iv Note that DOE O 425.1D does not cover restart of a nuclear facility, activity, or operation that has downgraded its Hazard Categorization
v These Startup Authorization Authority responsibilities are identified for completeness only, per DOE O 425.1 these responsibilities are already identified as CSO (or designee) responsibilities.
vi Note that DOE O 425.1 does not indicate “(or designee)” for extended shutdown of Hazard Category 1 nuclear facility, activity, or operation; however, it does for shutdown because of substantial
process, system, or facility modifications; therefore, for consistency included as part of the CSO responsibilities