BOP-001.31, National Nuclear Security Administration Corporate Approved Funding Program (AFP) and Work Authorization (WA) Procedure
To establish procedures within NNSA to implement the Approved Funding Program (AFP) and Work Authorization (WA) processes within the framework of the NNSA's Planning, Programming, Budgeting, and Evaluation Sytem (PPBES).
Canceled by NAP-33 and SD 412.1.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
| SI TL ell A)
HN Sak
National Nuclear Security Administration
NNSA Policy Letter: BOP-001.31
Date: July 11, 2002
Revised: July 2003
TITLE: National Nuclear Security Administration Corporate Approved
Il.
Funding Program (AFP) and Work Authorization (WA) Procedure
OBJECTIVE: To establish procedures within NNSA to implement the Approved
Funding Program (AFP) and Work Authorization (WA) processes within the
framework of the NNSA’s Planning, Programming, Budgeting, and Evaluation
System (PPBES). These procedures:
A. Identify the required AFP and WA processes, including the necessary
forms and reports;
B. Define the review and approval authorities for the AFP and WA process;
Cc. Establish commonly shared software that will be used to implement and
administer the AFP and WA processes with the goal of automating the
AFP/WA process in FY 2003 in the NNSA Budget Execution System
(NABEX);
D. Provide examples of financial reports that will be used by the Office of
Planning, Programming, Budgeting and Evaluation (NA-62) to monitor
the expenditure of funds; and
E. Establish internal controls necessary to safeguard Federal funds and ensure
consistency NNSA-wide.
APPLICABILITY: These procedures applies to all NNSA personnel performing
NNSA tasks and activities, with the exception of the Office of Naval Reactors,
which will continue to operate under an existing process. This procedure will be
phased-in with the implementation of NABEX in FY 2003.
REQUIREMENTS: Budget execution is the process by which the resources that
have been appropriated are allocated and controlled to achieve the purposes for
which the budgets were approved. Execution year scope will be implemented
NNSA Policy Letter
consistent with the NNSA Programs’ 5-Year Program Plans and Implementation
Plans. Within the NNSA there will is an increased emphasis on:
A. Better accountability for resource use;
B. Timely and more complete distribution of program requirements and work
authorization from Headquarters; and
C. Clearer accountability between program performance metrics and funding
through a full year evaluation process.
The NNSA will transition to an automated AFP and WA system (NABEX) that is
consistent with Departmental and NNSA requirements during FY 2003. The
NNSA will continue to meet Departmental AFP and WA requirements.
IV. RESPONSIBILITIES: It is the responsibility of the Director, Office of Planning,
Programming, Budgeting and Evaluation, on behalf of the Associate
Administrator for Management and Administration, to establish processes and
procedures consistent with the PPBE methodology.
V. POINT OF CONTACT FOR ADMINISTRATION POLICY LETTER: Office of
Planning, Programming, Budgeting and Evaluation.
GL f po —
Michael C. Kane
Associate Administrator for
Management and Administration
Attachment:
Approved Funding Program and Work Authorization Standard Operating Procedures
NNSA Policy Letter
Distribution:
Deputy Administrators
Associate Administrators
Operations Office Managers
Staff Directors
NNSA Policy Letter
NNSA POLICY LETTER - BOP —001.31
January 2, 2003
Revised June 2003
U.S. Department of Energy (DOE)
National Nuclear Security Administration (NNSA)
BUDGET EXECUTION
APPROVED FUNDING PROGRAM (AFP) AND WORK AUTHORIZATION (WA)
STANDARD OPERATING PROCEDURES
1. PURPOSE. To provide National Nuclear Security Administration (NNSA) procedures to
implement the Approved Funding Program (AFP) and Work Authorization (WA)
processes consistent with Department of Energy (DOE) policy and requirements and
within the framework of the NNSA’s Planning, Programming, Budgeting, and Evaluation
System (PPBES). These procedures:
Section 2
a.
Identify the required AFP and WA processes, including the necessary forms and
reports;
Define review and approval authorities for AFPs and WAs;
Continue to employ the NNSA Administrative Budget Execution System (NABEX)
on a limited basis;
Provide examples of financial reports that will be used by the Office of Planning,
Programming, Budgeting and Evaluation (NA-62) to monitor the expenditure of
funds;
Establish internal controls necessary to safeguard Federal funds and ensure
consistency NNSA-wide.
2. APPLICABILITY. The provisions of these procedures apply to Department of Energy
(DOE) NNSA personnel performing NNSA tasks and activities, with the exception of the
Office of Naval Reactors, which will continue to operate under an existing process. This
procedure was phased-in with the implementation of NABEX in FY 2003.
3. REFERENCES.
a.
b.
c.
OMB Circular No. A-34, Instructions on Budget Execution
OMB Circular No. A-11, Preparation and Submission of Budget Estimates
DOE O 135.1, Budget Execution-Funds Distribution and Control; extended by DOE
N 135.1, Extension of DOE O 135.1, Budget Execution-Funds Distribution and
Control; accompanied by DOE M 135.1-1, Budget Execution Manual
DOE O 412.1, Work Authorization System
DOE G 120.1-5, Guidelines for Performance Measurement
NNSA POLICY LETTER — BOP —001.31
January 2, 2003
Revised June 2003
ATTACHMENTS.
a. Attachment A: NNSA Monthly Approved Funding Program and Work Authorization
Process
b. Attachment B: Valid list of NNSA Budget & Reporting (B&R) Classification Codes
and Appropriation Structure. Updated B&R reports may be accessed via the CFO
web site at http://www.cfo.doe.gov/ficor/barc/index.htm.
c. Attachment C: Contract Identification Codes
d. Attachment D: Request for Approved Funding Program Change & Certification of
Funds Availability (and Sample E-mail Certification of Funds Available from the
Operations Office)
Attachment E: DOE Contacts for Verification of Funds Availability for Withdrawal
of Allotted Funds
Attachment F: Headquarters Confirmation of Funds Available for Withdrawal Memo
Attachment G: Financial Explanation of Changes (EOC) — Transactions by Funding
Program and Major Operating Contractors
Attachment H: NNSA Approved Funding Program Approving Officials and Contacts
Attachment I: Major Operating Contract (MOC) Work Authorization
Attachment J: NNSA Work Authorization Signature Authorities and Program and
Budget Contacts
k. Attachment K: Sample Work Authorization Transmittal Memorandum
1. Attachment L: AFP and WA Roles and Responsibilities
®
Sor pga oh
GENERAL.
This section provides an overview of the NNSA corporate AFP and WA processes and
establishes summary procedures for the administrative processing of monthly AFPs and
WAs by the Office of Planning, Programming, Budgeting and Evaluation (NA-62). The
NNSA Headquarters program offices shall continue to provide direction and approval of
the work to be accomplished. The NNSA monthly AFP and WA processes described in
section 6 of this procedure, and further defined in Attachment A, provide the specific
action steps and schedule associated with a typical monthly AFP and WA cycle. This
procedure is consistent with Departmental AFP and WA requirements and guidance.
Budget execution is the process by which the resources that have been appropriated are
allocated and controlled to achieve the purposes for which the budgets were approved.
Execution year scope will be implemented consistent with the NNSA Programs’ 5-Year
Program Plans and Implementation Plans. Within the NNSA there will be an increased
emphasis on:
Section 3
= Better accountability for resource use;
= Timely and more complete distribution of program requirements and work
authorization from Headquarters;
« Clearer accountability between program performance metrics and funding through
a full year evaluation process.
NNSA POLICY LETTER — BOP —-001.31
January 2, 2003
Revised June 2003
The NNSA (with the exception of several NN organizations) transitioned during FY 2003
to an automated system for administrative processing of AFPs and WAs (NABEX) that is
consistent with Departmental and NNSA requirements during FY 2003. The NNSA will
continue to meet Departmental AFP and WA requirements.
Approved Funding Program (AFP)
The DOE funds distribution process uses the Approved Funding Program (AFP) to
provide programmatic funding guidance consistent with applicable limitations and
enables funding transfers among Headquarters, the NNSA Service Center/NNSA Site
Offices/non-NNSA Operations Offices/contractors.
After Congress passes and the President signs the annual Appropriations, the Office of
Management and Budget (OMB) apportions the funds. The OMB apportionment process
makes funds available to DOE for obligation and expenditure. DOE creates the Base
Table from the apportionment. The Base Table displays the budgetary resources
available for obligation at a level of detail consistent with congressional controls. The
Base Table is the controlling document for the AFP input and is submitted quarterly to
Congress. The AFP contains planned funding guidance by B&R in more detail than is
contained in the Base Table. Changes to the AFP may be proposed monthly; however,
the proposed changes must be within the obligational control levels reflected on the
current Base Table.
The Appropriations Act and the OMB Apportionment are legal limitations on available
funds and represent ceilings on the amount that may be obligated. Other administrative
controls also govern obligational levels, including the committee reports accompanying
the National Defense Authorization Act and Energy and Water Development
Appropriations Act; OMB and other executive branch guidance; and internal DOE
limitations. Exceeding obligational control levels violates the Department’s
Administrative Control of Funds policies and is potentially a violation of the Anti-
Deficiency Act.
The AFP is the financial guidance controlling the distribution of DOE’s obligational
authority in compliance with all legal and administrative controls. The AFP reflects the
planned funding levels in each appropriation account and identifies the suballocations to
the NNSA Service Center, NNSA Site Offices, non-NNSA Operations Offices,
and contractors. The AFP also provides the funds necessary to support the WAs. The
AFP provides:
1. Planned funding guidance by B&R code for the organizations responsible for the
execution of the program; and
2. Control levels to ensure that funds are not distributed in excess of obligational
controls in the Base Table.
NNSA POLICY LETTER — BOP —-001.31
January 2, 2003
Revised June 2003
Allotments to DOE Field Organizations
The allotments, which provide the statutory funding controls, are issued by the CFO and
are effective the first day of the fiscal year. They will be issued on October 1 (subject to
the availability of appropriations and apportionments), and there may be multiple
allotments if the NNSA is operating under a Continuing Resolution. The allotment
provides the actual obligational authority, which can be applied according to the funding
in the AFP. The allotment, not the AFP, determines the amount of Obligational authority
available for programs and projects. The CFO is responsible for coordinating this effort
in the Department.
Section 4
Typically, the initial AFP is issued by the CFO in mid-September, and is effective
October 1, the first day of the fiscal year.
Work Authorizations
Work Authorizations (WA) document all work to be performed by the NNSA Service
Center, NNSA Site Offices, non-NNSA Operations Offices, M&O contractors, or other
contractors. The NNSA Project/Program Managers develop the statement of work in the
WAs to reflect the work scope in the 5-Year Program Plans, Annual Implementation
Plans/Annual Operating Plans and work plans (or updates thereto). The WAs provide
program guidance consistent with distribution of each AFP and are approved by program
managers at NNSA Headquarters, and concurred on/signed by the NNSA Service Center
NNSA Site Offices, non-NNSA Operations Offices, M&O contractors and other
contractors. WAs that crosscut multiple programs require the review and approval of
multiple program managers to ensure that all programmatic interdependencies have been
appropriately reflected.
?
All NNSA WAs shall be performance-based and cascade down from the goals,
objectives, strategies and performance measures reported in the NNSA Strategic Plan,
Program Integrated Plans, 5-Year Program Plans, Annual Implementation Plans/Annual
Operating Plans and work plans, and other guidance specifically tasked and approved by
the responsible Headquarters managers. As shown in the diagram on the following page,
implementation of the NNSA’s planning and performance cascade will provide a path of |
accountability between the long-term vision outlined in the strategic plan and the day-to-
day activities of individual federal and contractor employees.
The statement of work in each WA shall include a detailed description of the work to be
performed or include reference to a field work proposal, project plan, statement of
work/contract, Implementation Plan, Operating Plan or similar document that describes
the scope of work, milestones, deliverables, and/or performance measures and
expectations. The statement of work shall also reflect appropriate guidance when
funding is reduced (what work scope will not be done) and is being redirected to support
higher priorities. Applicable documentation needs to be reflected in the work
authorizations to enable the Contracting Officers to acknowledge and accept the scope of
work. NA-62, based on input from the Project/Program Manager(s), shall prepare WA
NNSA POLICY LETTER — BOP —001.31
January 2, 2003
Revised June 2003
forms that are consistent with the AFP and reflect the work scope defined in the 5-Year
Program Plans and Implementation Plans or annual work plans.
After NNSA Headquarters approves the WAs, the WAs are distributed to the appropriate
non-NNSA Operations Offices, NNSA Service Center, NNSA Site Offices (i.e.,
Livermore, Los Alamos, Nevada, Sandia, Kansas City, Pantex, Savannah River, Y-12),
and M&O contractors for signature and subsequent transmittal to the cognizant
laboratory (i.e., Lawrence Livermore National Laboratory (LLNL), Los Alamos National
Laboratory (LANL), Sandia National Laboratories (SNL)) or plant/site (i.e., Kansas City
National Security Complex (KC), Nevada Test Site (NTS), Pantex, Savannah River Site
(SRS), or Y-12) to execute work scope. The WAs shall be distributed through the
applicable Site Office (simultaneously to the Service Center) for signature prior to
approval by the laboratory or plant/site.
Section 5
The operating procedures for work authorization approval at the Site Offices are the
responsibility of each office. As the reengineered field structure stabilizes, it is the
intention to standardize this wherever possible. Interim procedures are in place between
the Service Center and the Site Offices.
The following diagram illustrates the role of the work authorization in NNSA’s
performance cascade.
NNSA POLICY LETTER — BOP —-001.31
January 2, 2003
Revised June 2003
NNSA PLANNING AND PERFORMANCE CASCADE
- DOCUMENT TIME STRUCTURE ASSESSORS |
NNSA 15 Years President/S-1 and
Strategic Plan NNSA
a)
Program 1—10 Years a NA-1 and D/A
Integrated Administrators
Plans
(5) x So
NN NR MA |
i. _
5-Year _ YY ‘ D/A Admin. and
Program Plans 5 Years a Prog. Mgrs (Feds)
(at CongressionalControl Levels) _
(~ 50) _—__
1 Year 1 Year / \ Prog. Mgrs, Ops
Impiementation/ and M&Os
Opn Plans
(~ 50)
Work Authorization/ 1 Year AN ANIA 2 & M&O
Deliverables Contractor
assessment by Feds
6. MONTHLY AFP AND WA CYCLE.
This section describes the monthly NNSA corporate AFP and WA cycle. The process
centralizes the administrative processing of the AFPs and WAs within NA-62. The primary
responsibility for processing the NNSA’s AFPs and WAs at Headquarters resides with a core
team of NA-62 Budget Execution Analysts who work with the applicable project/program
contacts; NA-62 Budget Analysts, managers, and the Program Integration Office; and DOE
Chief Financial Officer staff to ensure that Departmental and NNSA AFP and WA
requirements have been satisfied. The automation of the NNSA’s AFPs and WAs in
NABEX and the centralization of administrative processes within NA-62 are resulting in
improvements to efficiency and administrative funds control.
NNSA POLICY LETTER — BOP —-001.31
January 2, 2003
Revised June 2003
Attachment A provides a corporate NNSA monthly AFP and WA process flow diagram,
action steps and schedule, and the accompanying attachments B through L provide standard
AFP and WA formats, approval authorities, contacts, and related guidance.
Monthly Approved Funding Program (AFP) Cycle
Funding transfers between NNSA Headquarters and the NNSA Service Center, between
the NNSA Service Center and NNSA Site Offices, between the non-NNSA Operations
Offices and contractors, between the NNSA Site Offices and contractors, or between
contractors, shall require appropriate AFP change and certification documentation. The
Office of Planning, Programming, Budgeting and Evaluation (NA-62) will request
necessary AFP changes through the DOE CFO in accordance with established procedures
for the administrative control of funds. In preparing the AFP, the most current, approved
Valid List of NNSA B&R Classification Codes and Appropriation Structure (Attachment
B) and Contract Identification Codes (Attachment C) shall be used. These attachments
will be updated and posted on the NNSA intranet (when operational).
Headquarters, non-NNSA Operations Offices/NNSA Service Center/NNSA Site Offices,
M&Os/Laboratories/Plants (as applicable) may initiate the AFP change process by
submitting requested AFP changes to the NNSA Headquarters Project/Program Managers
with an information copy to the NA-62 Budget Execution Analyst. It is expected that the
NNSA Project/Program Managers will initiate and/or approve AFP changes that are
within the Congressional Control Level, as required to address changing priorities,
support corrective actions, or reduce carryover. In addition, where applicable, the
Operations/Site Offices will submit formal notification to the NA-62 Budget Execution
Analyst, which provides the necessary audit trail to the congressional appropriation. The
NNSA Service Center or non-NNSA Operations Offices will provide certification of
funds availability to the NA-62 Budget Execution Analyst. Specifically:
Section 6
=" For changes initiated by the Field (i.e. .non-NNSA Operations Office/NNSA Service
Center/NNSA Site Office, M&O/Laboratory/ Plant):
The applicable field organization shall identify potential changes to the AFP, while
including an initial Explanation of Change (EOC), and send the proposed change to
the appropriate Headquarters Project/Program Manager(s) with an information copy
to the NA-62 Budget Execution Analyst NLT the 7" business day of the month.
The field organization may submit proposed AFP changes using the Attachment D,
Request for AFP Change & Certification of Funds Availability Form; E-mail (refer to
Attachment D Sample E-mail); or other mechanism, as agreed to by the Headquarters
Project/Program Manager.
« NNSA Service Center or Non-NNSA Operations Office Certification of Funds
Availability:
The NNSA Service Center or non-NNSA Operations Office _will submit the
Certification of Funds Availability to the NA-62 Budget Execution Analyst by the 9
NNSA POLICY LETTER — BOP —-001.31
January 2, 2003
Revised June 2003
business day of the month by providing either: (1) the Request for AFP Change
Form (Attachment D), with a signed and approved section 8, Field Certification of
Funds Availability (For Deobligation) or (2) E-mail (refer to Attachment D, Sample
E-Mail -- Certification of Funds Available from the Operations Office). The NA-62
Budget Execution Analyst will ensure that changes requiring the withdrawal of funds
from the field have the appropriate certification of funds availability. Only those
officials (or those designated in an acting capacity) listed in the DOE Contacts for
Verification of Funds Availability for Withdrawal of Allotted Funds (Attachment
E) are authorized to provide certification of funds availability.
For Both NNSA Field and/or Headquarters Initiated Changes:
The responsible NNSA Headquarters Project/Program Manager shall complete, sign/
approve, and submit to the NA-62 Budget Execution Analyst the Request for AFP
Change Form (Attachment D) NLT the 8™ business day of the month in order to be
processed in the next month’s AFP. Submission of the Request for AFP Change
Form is key to ensure the timely and accurate processing of the AFP change(s), but
use of E-mail (refer to Attachment D Sample E-mail) will also be accepted. The
NNSA Headquarters Project/Program Manager shall ensure that the following
information ts included on this form: EOC; deliverables and milestones; description
of funding changes; and signature (under section 7, Approved By Line).
=" Explanation of Change (EOC)
Every AFP change must include an EOC that identifies the major reason for the
change, programmatic impact, and organizations and any contractors affected.
The following elements should be included in EOCs, as applicable:
- Major reasons for changes, such as: (a) changes resulting from an approved
revision to a DOE base table amount or line item as a consequence of a
reprogramming; restructuring; supplemental appropriation; deferral or
rescission; (b) any change to a legally or politically sensitive program; (c) any
change that will affect employment levels in a Departmental Element; (d) for
capital equipment, any change affecting a major item of equipment such as:
(1) a major item of equipment (including ADPE) is established; (2) a change
of $500,000 or more is made to an existing line item; or (3) for construction,
any change to the funding for a prior year construction project.
- Programmatic impacts;
- Organizations and contractors being affected;
Section 7
- New activities being initiated due to the changes; and
NNSA POLICY LETTER ~ BOP —-001.31
January 2, 2003
Revised June 2003
- Sources of the funding: (a) if a reduction of another activity is involved, the
EOC should identify the activity being reduced and an explanation of the
rationale for the reduction (e.g., postponement of a project), or (b) release of
OMB or DOE reserves.
The information provided in the EOC is used to address inquiries from the CFO,
DOE management, General Accounting Office (GAO), OMB and Congress.
The NA-62 Budget Execution Analyst shall ensure that only SIGNED and
COMPLETED documentation of the request for AFP changes (i.e., completed Request
for AFP Change and Certification of Funds Availability forms) with accompanying
EOCs will be accepted as valid requests to execute AFP changes. Again, submission of
the Request for AFP Change Form is key to ensure the timely and accurate processing of
the AFP change(s), but use of E-mail (refer to Attachment D Sample E-mail) will also be
accepted (as the exception). It is the responsibility of the NA-62 Budget Execution
Analyst to obtain the appropriate certification of funds availability for changes that
require the withdrawal of funds from the field. The NNSA Headquarters changes require
the preparation of a Confirmation of Funds Available for Withdrawal memorandum
(Attachment F) that has been approved by the Headquarters AFP signature authority.
The NA-62 Budget Execution Analyst will input final AFP data into the Department’s
Funds Distribution System (FDS) consistent with the approved AFP changes and
generate a hard-copy AFP report from FDS and the Financial Explanation of Changes
(EOC) report (Attachment G) from NABEX or other appropriate system.
The AFP approving official listed in the NNSA AFP Approving Officials and Contacts
(Attachment H) will sign the Headquarters Confirmation of Funds Available for
Withdrawal memorandum and approve the AFP and EOCs. The NA-62 Budget
Execution Analyst will forward the signed AFPs, EOCs, and Certification of Funds
Availability to the DOE CFO NLT the 15" business day of the month.
The NA-62 budget staff and NNSA Headquarters Programs will evaluate proposed AFP
changes and associated WAs. The responsible Headquarters Program Office will notify
the field on the disposition of changes that are not approved.
The DOE CFO will inform the NNSA Budget Execution Analysts that the final AFPs
(AFP Confirmed Worksheets) are ready to be printed NLT the 20" business day of the
month. The DOE CFO will approve and distribute the allotment to the non-NNSA
Operations Offices and the NNSA Service Center, and will distribute electronic AFPs,
Advice of Allotment and DISCAS Interface Reports to the cognizant non-NNSA
Operations Offices, the NNSA Service Center, the NNSA Site Offices and
M&Os/Laboratories.
NNSA POLICY LETTER - BOP —001.31
January 2, 2003
Revised June 2003
Monthly Work Authorization (WA) Cycle
Work shall be authorized in accordance with the AFP, programmatic guidance, and
established procedures for the administrative control of funds. The NA-62 Budget
Execution Analyst will generate/update the Work Authorization form (Attachment I)
using the information the NNSA Headquarters Project/Program Managers submit on the
Request for AFP Change Form (Attachment D). The NNSA Headquarters Project/
Program Managers will provide any additional words/deliverables for inclusion on the
WA, as needed.
Section 8
The NA-62 Budget Analyst will concur with the WA prior to transmittal and subsequent
approval by the responsible NNSA Headquarters Program WA official. The NA-62
Budget Execution Analyst will forward the updated WA NLT the 13" business day of
the month to the applicable NNSA Headquarters Program WA official(s) for approval.
Only the WA officials listed in the NNSA Work Authorization Signature Authorities
(Attachment J) are authorized to sign the WAs.
The authorized NNSA Headquarters Program WA official(s) shall approve and submit
the signed WAs NLT the 20™ business day of the month to the NA-62 Budget
Execution Analyst.
The NA-62 Budget Execution Analysts will consolidate and transmit the approved WAs
NLT the 5" business day of the next month via Work Authorization memorandum
(Attachment K provides a sample) to the applicable Operations/Field Office budget
contacts, contractor budget office contacts, and contractor program contacts.
The responsible field organization(s) will immediately sign the Headquarters-approved
WAs and submit them to the NA-62 Budget Execution Analyst within 4 weeks of the
Work Start Date listed on the WA. DOE field elements must obtain a signed copy of
each WA accepted by the M&O contractor as evidence of acceptance of the WA. Work
is not authorized to commence until the contractor receives both funding and the related
WA guidance.
Procurement actions (Procurement Requests, Funds Out Interagency Agreements, etc.)
with the scope of work attached AND signed by both the Project Manager/Initiator and
the Reviewing Official, should be submitted to the appropriate NA-62 analyst for
processing within NA-62. NA-62 will review procurement documents for appropriate
scope of work and funding citations; coordinate NA-63 review of I.A., as needed; and
certify availability of funding.
OQUT-OF-CYCLE (EMERGENCY) CHANGES. Emergency (or out-of-cycle) allotments
are issued when a funding change is required but it would be detrimental to a program,
function, or activity to wait for the next regular monthly AFP cycle to process the change.
In all cases, the organization requesting an out-of-cycle allotment must be certain
that a bona fide urgent need exists and that such requests are kept to a minimum.
NNSA POLICY LETTER — BOP —001.31
January 2, 2003
Revised June 2003
‘Omnibus ” out-of-cycle requests will not be considered. Requests for out-of-cycle
allotments must follow the same procedures as normal requests for allotment and
approved funding program changes, only on a more accelerated basis.
The Project/Program Manager must submit the justification for an out-of-cycle change to
the cognizant NA-62 Budget Analyst. NA-62 staff will prepare the final memorandum
for approval by the NA-62 Director (or Deputy Director). Proposed withdrawal of funds
from Headquarters components must be accompanied by a completed certification of
funds availability (as stated in item number 7 in the following paragraph). The request
will then be forwarded to the CFO’s Office of Budget for approval.
The request must meet/include CFO requirements as to the need for the emergency
change and an explanation of the nature of the emergency. The following information is
normally required for AFP or allotment changes:
Appropriation Symbol and Title
Budget and Reporting Classifications (B&R)
AFP recipient(s) being increased
AFP recipient(s) being decreased
Contract Identification (CID)
Dollar amount of changes (+ and -)
Section 9
Certification of funds being withdrawn. The certification must be signed and
dated by the DOE Principal or his designee for signing allotment/AFP change
requests. The certification must appear as follows:
NAY YN ES
"I certify that all reductions in allotments resulting from changes, as
requested, have been verified with the allottees as being unobligated and
available for withdrawal.”
Authorized Approving Official Date
EXECUTION YEAR FUNDS ANALYSES. NA-62 will generate and distribute monthly
financial reports to cognizant NNSA Headquarters Project/Program Managers and staff
and support components. The types of reports include but are not limited to: status of
obligations and costs; AFPs and work authorization changes; funding by site, etc.
RECORDS. The following records shall be maintained by the NA-62 Budget Execution
Analyst:
1) Initial and monthly approved AFPs [FDS form 1537]
2) Request for AFP Change & Certification of Funds Availability Forms [signed and
dated final copies]
3) Work Authorizations [signed and dated final copies]
4) Headquarters Certification Memoranda
5)
6)
7)
8)
9)
NNSA POLICY LETTER — BOP —001.31
January 2, 2003
Revised June 2003
Explanations of Changes
Copies of the Confirmed Worksheets
Work Authorization Memoranda
Latest approved version of the Fiscal Year Program Plans [October 1*t Update —
“Implementation Plan” and March 1* Update — “5-Year Program Plan”]
NNSA Execution Year Financial Reports
Attachment A
NNSA Monthly Approved Funding Program (AFP) and Work Authorization (WA) Process
NNSA MONTHLY AFP AND WA PROCESS
TYPICAL
OWNER ACTION SCHEDULE
Days)
Non-NNSA FOR FIELD-INITIATED CHANGES (Steps 1a and 1b)
Operations/NNSA
Service Center/Site | STEP 1a: Submit Request for AFP Change Form and initial EOCs [to NNSA
Office or M&O/ Headquarters Program Project/Manager(s) with an information copy to the
Laboratory NA-62 Budget Execution Analyst]. When reducing a site, the EOC must state
what work will not be accomplished as a result of the AFP change.
* Submit proposed AFP changes and initial Explanation of Changes (EOCs) | NLT 7" Day
on the Request for AFP Change Form (Attachment D) to the responsible
NNSA Headquarters Program/Project Manager(s) with a copy to the NNSA
Headquarters (NA-62) Budget Execution Analyst. Complete the EOC section
of this Form by providing explanations that describe in sufficient detail the
reason(s) for the requested change(s). [If the M&O/Laboratory requested the
change, they shall provide the Request for AFP Change Form to the NNSA
Service Center or non-NNSA Operations Office official for signature (certifying
availability of funding), consistent with the Contacts for Verification of Funds
Availability for Withdrawal of Allotted Funds listed in Attachment E].
« Submit any additional programmatic information required by NNSA
Headquarters Programs to the applicable NNSA Headquarters
program/project contacts to reflect the impact of the change proposed |i.e.,
NA-25 requires Headquarters Project Managers to submit revised Annex I and
overview data to reflect the impact of the proposed changes].
Note: Methods other than the Request for AFP Change Form may be used as
agreed to between the NNSA Headquarters Programs and the Field to initiate the
change request process (i.e., e-mail or fax).
NNSA Service STEP 1b: Provide Certification of Funds Availability (as required)
Center / Non-
NNSA Operations | *® Where applicable, the NNSA Service Center or non-NNSA operations office By 9" Day
Office official with signature authority will sign and submit the Certification of Funds
Availability on the Request for AFP Change Form (Attachment D) to the
NA-62 Budget Execution Analyst. Only the authorized officials (Attachment
E) may attest to/sign the Certification of Funds Availability.
NA-62 Budget STEP Ic: Receive Outstanding Certification of Funds Availability (as From 9™ Day
Execution Analyst | required) to NLT 13"
Day
» Ensure receipt of Certification of Funds Availability (for Field changes the
Certification is provided on the Request for AFP Change Form; for
Headquarters changes, the Certification is provided on the Confirmation of
Funds Available for Withdrawal Memorandum (Attachment F).
* Confirms Funding Availability for approved changes.
Note: It is the responsibility of the NA-62 Budget Execution Analyst to obtain the
Certification of Funds Availability from the NNSA Service Center or non-NNSA
operations office or NNSA Headquarters, as applicable.
Section 10
Attachment A
NNSA MONTHLY AFP AND WA PROCESS
TYPICAL
OWNER ACTION SCHEDULE
(Business
Days)
FOR NNSA HEADQUARTERS INITIATED CHANGES AND FIELD INITIATED
CHANGES
Headquarters STEP 2: Approve and submit Request for AFP Change Form (includes initial
NNSA Program EOCs) to the NA-62 Budget Execution Analyst
Manager(s)
= Complete (sign) and submit the Request for AFP Change Form (Attachment D) ; NLT gt Day
with completed EOCs to the responsible NA-62 Budget Execution Analyst to be
processed and reflected in the next month’s AFP. Provide explanations that
describe in sufficient detail the reason for the requested change(s), along with
milestones and deliverables, as appropriate. Also provide explanations that
describe what work will not be done as a result of funding withdrawals.
Note: Submittal of the Request for AFP Change Form by the NNSA Headquarters
Programs to the NA-62 Budget Execution Analyst is preferred.
NA-62 Budget
STEP 3: Process AFP and WA Data (in the NNSA Administrative Budget
Execution Execution System [NABEX] if appropriate).
Analyst/Budget
Analyst = Budget Execution Analyst receives Request for AFP Change Form and provides |} NLT 10" Day
to cognizant Budget Analyst for review/information.
= Budget Execution Analyst enters and processes the AFP and WA data (in
NABEX if appropriate).
Notes:
(1) Some NN programs will continue to maintain existing AFP and WA automated
Systems.
(2) NA-62 Budget Execution Analyst will ensure that the Valid list of NNSA B&R
Codes and Appropriation Structure (Attachment B), and Contract Identification
Codes (Attachment C) are used when processing the AFPs and WAS.
NA-62 Budget STEP 4: Generate/update the Major Operating Contractor Work
Execution Authorization (WA) Forms (Attachment I).
Analyst/Budget
Analyst " Budget Execution Analyst enters data on the WAs from the Request for AFP From 7" to
Change forms and any additional information provided by the HQ NNSA 12" Day
Programs.
«= Budget Execution Analyst forwards completed WA forms to the cognizant
Budget Analyst for concurrence prior to transmittal and subsequent approval by
the responsible NNSA Headquarters Program WA Official.
* Budget Analyst initials the WA forms indicating concurrence and returns to NLT 12" Day
Budget Execution Analyst.
Headquarters STEP 4a: Provide the words/deliverables to draft WAs.
NNSA Program/
Project Manager(s) | " Provide any additional attachments to the WA forms, as needed. NLT 11" Day
*" _NA-62 Budget Execution Analyst will update the WAs, as needed.
NA-62 Budget STEP 4b: Forward WAs for Program approval/signature.
Execution Analyst
s Transmit completed WA Forms to Programs for approval/signature. NLT 13” Day
Section 11
Attachment A
Headquarters STEP 4c: Approve and sign the WAs and forward to NA-62 Budget Execution
NNSA Program Analyst for transmittal to the Field.
WA Official(s)
" The Program WA official(s) approve the WA form. Only those officials listed NLT 20" Day
in Attachment J are authorized to sign the WA [unless further delegated by the
Programs].
= GOTO STEP 13
Note: (1) Programs managed jointly require multiple approval signatures; (2) Each
NNSA Program determines the appropriate concurrences required on the WA.
NA-62 Budget STEP 5: Generate EOC Report (Attachment G).
Execution Analyst
« Generate EOC Report through NABEX (or from individual systems for those NLT 14" Day
programs not linked to NABEX).
* Forward Financial EOC Report to the NA-62 Approving Official for approval
prior to transmittal to the CFO.
NA-62 Budget STEP 6: Process AFP in FDS.
Execution Analyst NLT 14" Day
» Input final AFP data into the Department’s Funds Distribution System (FDS)
consistent with the approved AFP Change(s).
= FDS is “locked” for changes
= Print hard-copy AFPs (from FDS) and obtain signature of the NA-62 AFP
approval authority.
Headquarters STEP 7: Sign the NNSA Headquarters Confirmation of Funds Available for
NNSA AFP Withdrawal memorandum and approve the AFP (FDS) & EOCs.
Approving Official NLT 14" Day
* Sign the NNSA Headquarters Confirmation of Funds Available for Withdrawal
memorandum, AFPs [on the Proposed AFP Program Input Worksheet -- FDS
Form 1537] and EOCs [from the applicable NNSA database]. Only the
approving officials, authorized by signature cards listed in Attachment H, may
sign the AFP.
NA-62 Budget STEP 8: Forward signed AFPs, EOCs, and Certification of Funds Availability { NLT 15" Day
Execution Analyst | to the DOE CFO.
* AFPs are provided on FDS Form 1537.
* EOCs are printed from the applicable database.
* Certification of Funds Availability is provided on the Request for AFP Change
Forms [for Field Changes] or Certification Memorandum [for HQ changes].
DOE CFO STEP 9: Review EOCs and AFP Confirmed Worksheets.
" The CFO reviews the EOCs and informs the NNSA Budget Execution Analysts | NLT 20" Day
that the AFP Confirmed Worksheet [FDS Form 1541], which signifies approval
of the AFP, is ready to be printed.
DOE CFO STEP 10: Approve and distribute: AFPs (electronic), Advice of Allotments NLT 6" Day
(HQ F 2260.2), and DISCAS Interface Report to responsible non-NNSA of next month
Operations Office and NNSA Service Center.
NA-62 Budget STEP 11: Receive approved AFPs.
Execution Analyst
= NA-62 Budget Execution Analyst prints the confirmed AFPs from the DOE Varies
CFO system.
Attachment A
NA-62 Budget
STEP 12: Issue final, approved EOCs to the Field.
Within 7" Day
Execution Analyst of CFO AFP
approval
NNSA Service STEP 13: Receive the electronic AFPs, Advice of Allotment, and DISCAS Varies
Center/Non-NNSA | Interface Report.
Operations Offices
NA-62 Budget STEP 14: Simultaneously issue the final, approved WAs to the cognizant
Execution Analyst | NNSA Service Center, NNSA Site Office or non-NNSA Operations Office.
NLT 5" Day
" Issue final approved WAs to the NNSA Service Center, NNSA Site Offices or
non-NNSA Operations Offices by NA-62 via Work Authorization Transmittal
Memorandum (Attachment K). Simultaneous distribution (courtesy copies)
will take place for the Service Center and appropriate NNSA Site Offices.
Note: NNSA program offices may also distribute more detailed programmatic
information that will either be included or referenced in the WA form (i.e., more
Section 12
detailed Financial Plan spreadsheets; updated project life-cycle plans; and
guidance for preparing quarterly/monthly progress reports, consistent with internal
programmatic operations). This will ensure there is a complete picture of the work
scope.
of next month
Non-NNSA STEP 14a: Sign and submit approved WAs and perform work. Within 4
Operations weeks of the
Office/NNSA = Approve and submit signed WAs to the NA-62 Budget Execution Analyst. WA work start
Service Center/ = Perform work in accordance with the AFP/WA guidance. date
NNSA Site Office | = Submit required Program/Project progress reports to applicable NNSA
[M&O/Laboratory] Headquarters managers.
NA-62 Budget STEP 15: Maintain approved AFPs and WAs. Ongoing
Execution Analyst
« Log the signed WAs into tracking system and file hard copies of approved
AFPs and WAs.
HQ NNSA Budget | STEP 16: Produce and distribute NNSA Execution Year Financial Reports. Monthly
Division Not shown on process flow diagram.
Headquarters and STEP 17: Monitor the performance and reports submitted by the M&O Ongoing
Field Program contractors to ensure that work performed and costs incurred conform to the
Managers WA issued. Not shown on process flow diagram.
SdAV Sanosddd C45 SKep ssauysng 9 +
c Guo
SUM aaosddn sioifo Surzu0ymy skep ssoujsng 07+ sadunya g.qy tof moyso] skep ssauysng pl + anp saduvyo sof jsanbay skep ssautsnq + T quo
AI0jBIOge']
i 5 /ORW pus
TOM uoday [Wo s90yJQ sdcE t9-VN O} 49]U9-) adtA1ag
WIO}19d F SVK -UON queztuB09| | 4409 WM ureXBo1g VSNN
PoeHaIT SVOSTCLg. VSNN-UON Juezt s enmutt-
paroudde nuigns sluauno 40 sma sotniag| | OU SOOIPAMI-"7| | psagnG aig
pur u3ig ‘wey 8 ITV) : bo. 3 uuoy aBueyD| |
JO d01ApY ‘sdvI VSNN ‘(pazinbas :| VSNN/WO
“19919 A1994 * J) ‘Aupgepeay spung) | dV Joy isanboy) | suonesadg
ae or JO "H9D SplAoig “qT nuigng “et| | VSNN-UON
!
|
1 |
’ :
|
|
SVAN! ((SDOa) sadueysy |
Yep 0} sziqeioarfape+—] jo uoneurldxg jeniug i sulBiz0ig
'
/SPIOM OPIAOIg “eB + | Sapnyout) wo4 ssueyy +
SVM ddV 10} 1sanbay| ! OH VSNN
aaoidde 2 uSIg ‘op < i quigns 2 arouddy °7
1 :
¥ |
I
SVMSdAW SOOF F SWAN Anqereay spun
poaoidde poroudde eee 7 JO ‘ua9 aalaooy ‘aq :
urewurey “ST [euy anss] reaoudde v (79-VN)
— “PL BET : lure1Z01g JO] SYA Saligg VA apAH/aRIOD uoIsIAIg
sav vy PIEMIO.] “Gp XAqVN 5 yospng
; uodsy DOd ae1suan °¢ ur ee ue H VSNN
paaoidde fy Aupiquireay spung jo SOOd adv eovouy, ¢
DAID99Y “TT uonesyeD % ‘SOOT kg— (SdH) div S- ut ssa901d
‘dV pougis premio, *g snouddy +h pue vodar gy a1e12U9n “9
Odd
uoday soeyimuy SVOSIC + SOO MaIAaT HOd
swuaunoyfy Jo 201py+ K—) 2» S}aaysyIOM,
(oquos}o9]2) SqV » uLyuoD dV
soinginsip 2 oaoiddy ‘oT aonpolg *G
[soduey VA pue gJV 10J ssa001g 338.10d107) VSNN |]
Ssa001d (VM) UoHeZLIoy NY 410M /(qV) Weis01g suipuny paaoiddy Aqyyu0py,
ing udget an
Symbol Reporting Codes Budget and Reporting Titles
Approp. Symbol: 89X0240 _—si/ Title: Weapons Activities
Fund Type: TC and FS
DP (06 {00 j00 j0 SECURE TRANSPORTATION ASSET
Xx DP |06 (01 |00 {0 Program Direction - Federal Support
DP |06 |01 01 {0 Personal Services
DP {06 {01 02 =(|0 Personnel Benefits
DP (06 |01 (03 |0 Contractual Services and Supplies
OP {06 {01 j04 |0 Travel and Transportation of Persons
DP {06 {01 |05 [0 Training |
x DP |06 |02 |00 |0 Operations and Equipment
DP |06 (02 |01 {0 Program Operations
DP j06 |02 j02 |0 Security Enhancements
DP. (06 |02 (OW |a M&O Contractor Employee Cost (at Headquarters)
DP {06 {02 j;OW /1 Salaries/Benefits
DP {06 {02 |OW [2 Dislocation Allowance
DP j|06 j02 |OW [3 Travel
DP {06 (02 |OW {4 Office Support
DP {06 (02 [OW [5 Equipment
DP_ {06 _ [02 /j|OW [6 Other Costs
Section 13
ATT B -- NNSA FY03 BRs
7130/2003
Codes
: 89X0240_—si[ Title: W Activities
: Tc
DIRECTED
oT
£
3
a
am
Life Extension and
Modifications, LEP, and Other
Limited Life
and
T Container Enhancement
M&O Contractor Cost {at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
Tests
Tests
Surveillance
M&O Contractor
Salaries/Benefits
Dislocation Allowance
Travel
Office
WINIALOlO/OlOs/OlOlO/H/AlWiM/3/OlOlO/Olwlr/-/ololo
Other Costs
5
6
Q
0
and
and Characterization
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
OO] tn] &/ WN} 4/O/O/o
Other Costs
M&O Contractor
Salaries/Benefits
Dislocation Allowance
Travel
Office
WIN|—=/O
Other Costs
Information
and Material
M&O Contractor Cost
Dislocation Allowance
Travel
AP/WIN/-/O/O/OlOjo! alan
ATT B -- NNSA FY03 BRs 2 . 7130/2003
Routing | Division | Control Budget and —_
Symbol | Code Level Reporting Codes Budget and Reporting Titles
X DP 07 |06 j00 [0 Stockpile Research and Development
DP |07 |06 |01 [0 Assessment and Certification
DP |07 |06 {01 1 Assessment and Certification
DP |07 |06 {01 |2 OSW - Pit Manufacturing and Certification Campaign Support Activities at NTS
DP |07 |06 {02 |0 Maintenance
OP (O07 j06 {03 |0 Surveillance
DP |07 |06 j04 |0 Baselining
DP {07 {06 |05 4j0 Refurbishment
OP jo7 {06 \06 /|0 Supporting Research and Development
oP |a7 \06 =jOW {0 M&O Contractor Employee Cost {at Headquarters)
OP |0o7 (06 j|OW {1 Salaries/Benefits
DP |07 |Q6 {QW {2 Dislocation Allowance
DP (O7 |06 (OW [3 Travel
DP (07 {06 OW |4 Office Support
DP (07 (06 |OW [5 Equipment
DP [07 {06 |OW |6 Other Costs
ATT B -- NNSA FY03 BRs
3 7130/2003
Routing | Division | Control Budget and
Symbol | Code Level Reporting Codes Budget and Reporting Titles _
Approp. Symbol: 89X0240 __|Title: Weapons Activities _|
Fund Type: TC
DP |08 |00 {00 [0 CAMPAIGNS
xX Science Campaigns
X OP |08 {01 {00 40 Primary Certification Campaign
DP (08 (O71 |01 [0 Legacy Data Analysis and Archiving
DP {08 |01 |02 |0 Materials Science Integration and Analysis
DP_ {08 |01 /|03 [0 Engineering Component Analysis
DP {08 j01 04 = =|0 Boost Physics
DP (08 (01 |05 {0 integrated Hydro Tests Assessment
OP |08 (01 |06 [0 Subcritical Experiments
DP_ [08 {01 |OW [0 M&O Contractor Employee Cost (at Headquarters)
DP |08 |01 /jOW {1 Salaries/Benefits
DP {08 {01 jOW 42 Dislocation Allowance
DP (08 |01 (OW {3 Travel
OP |08 {01 jow |4 Office Support
DP |08 {01 |OW [5 Equipment
DP j|08 (01 jOW [6 Other Costs
x DP {08 |02 |00 {0 Dynamic Materials Properties Campaign
OP {08 |02 {01 /|0 Stockpile Materials Equation of State (EOS), Melt and Phase Transitions
DP |08 |02 {02 |0 Constitutive Properties of Metals: Strength, Spall, and Ejecta
DP jos jo2 j|o03 |o Organics
DP j08 j02 |04 j0 Materials Processing, Properties and Performance
DP |08 (02 |05 {0 University Partnerships
DOP {08 |02 |06 [0 Physical Data Computational Support
OP j08 |02 |07 {0 Nanoscience
DP (08 |02 |OW jo M&O Contractor Employee Cost (at Headquarters)
OP (08 {02 |ow 41 Salaries/Benefits
DP {08 |02 (OW {2 Dislocation Allowance
DP {08 |02 jOoW [3 Travel
DP |08 [02 [OW |4 Office Support
OP j08 |02 |OW {5 Equipment
DP {08 (02 |ow {6 Other Costs
Xx DP |08 |03 |00 [0 Advanced Radiography Campaign
DP |08 |03 {04 {0 DARHT Optimization
OP 08 |03 (02 {0 Simulation and Analysis
OP j08 (03 |03 j0 Provide Required Materials
OP_|08 (03 |04 {0 Advanced Radiography Requirements and Technology Development
DP_|08 |03 {05 {0 Vessel Development and Certification
DP {08 |03 jow |0 M&O Contractor Employee Cost (at Headquarters)
DP j08 #|03 |ow {1 Salaries/Benefits
OP (08 {03 jOW {2 Dislocation Allowance
DP |08 |03 |OW {3 Travel
DP {08 |03 {OW |4 Office Support
DP j|08 {03 jOW [5 Equipment
OP j\08 |03 jOW |6 Other Costs
Section 14
Xx DP (08 {04 (00 {0 Secondary Certification and Nuclear Systems Margins Campaign
DP |08 |04 |01 [0 Radiation Source
DP {08 |04 |02 {0 Initial Radiation Case Dynamics
DP_ j08 |04 [03 {0 Radiation Flow
OP {08 \04 |04 |0 Secondary Performance
DP (08 (04 {05 {0 University Grants/Other Support
OP {08 {04 jOW [0 M&O Contractor Employee Cost (at Headquarters)
OP j08 |04 jOowW |1 Salaries/Benefits
DP j|08 {04 |OW 1/2 Dislocation Allowance
DP {08 (04 |jOW 43 Travel
OP (08 |04 [OW 14 Office Support
OP (08 |04 [OW |5 Equipment
DP |08 |04 |OW |6 Other Costs
ATT B -- NNSA FY03 BRs
4 7130/2003
Routing | Division | Control Budget and
Symbol {| Code Level Reporting Codes Budget and Reporting Titles
Engineering Campaigns
x DP |08 |05 |00 [0 Enhanced Surety Campaign
DP j08 |05 {01 0 Advanced Initiation
DP {08 j|05 j|02 |0 Enhanced Use Denial
OP j|08 |05 j|OW _|0 M&O Contractor Employee Cost (at Headquarters)
OP j0oB |05 jOW {1 Salaries/Benefits
DP jo8 j05 |OW [2 Dislocation Allowance
DOP (08 {05 |OW 43 Travel
DP (08 |05 {|OWw 14 Office Support
DP (08 |Q5 {jow j5 Equipment
DP (08 |05 jOW {6 Other Costs
X DP (08 (06 {00 {0 Weapons System Engineering Certification Campaign
DP (08 (06 |01 |0 Defining Methodology, Needs, and Engineering Research Activities
OP |08 (06 |02 |0 Experimental Validation
DP (08 (06 |03 {0 Abnormal and Flight Test Instrumentation
DP {08 |06 [OW _ [0 M&O Contractor Employee Cost (at Headquarters)
DP 08 {06 {OW 114 Salaries/Benefits
DP |08 |06 jOW |2 Dislocation Allowance
DP |08 {06 |OW [3 Travel
DP [08 {06 |OW {4 Office Support
DP {08 {06 [OW [5 Equipment
DP {08 {06 [OW [6 Other Costs
x DP |08 |07 {00 {0 Nuclear Survivability Campaign
DP j08 |07 {01 {0 Modernization of Weapon Outputs
DP |08 |07 |02 |0 Nuclear Survivability of Nuclear Components
DP j|08 {07 |03 [0 Nuclear Survivability of Nonnuclear Components
DP /|08 |07 |04 [0 Hardening of Microelectronics and Microsystems
DP |08 |07 |OW jo M&O Contractor Employee Cost (at Headquarters)
DP |08 |O7 |OW 1/1 Salaries/Benefits :
DP |08 |07 jOW |2 Dislocation Allowance
OP {08 |07 jOW [3 Travel
OP {08 \07 |OW {4 Office Support
DOP (08 |O7 jOW J5 Equipment
DP {G8 |07 jOW j6 Other Costs
x DP 108 |08 {00 |0 Enhanced Surveillance Campaign
DP {08 (08 {01 jo Pits
DP {08 (08 (02 {0 Canned Subassemblies
OP (08 \08 {03 {a0 High Explosives/Energetics
DP (08 {08 (04 |0 Nonnuclear Components
DP (08 {08 |05 [0 Nonnuctear Materials
OP (08 |08 |06 [0 Systems
DP (08 {08 [OW [0 M&O Contractor Employee Cost (at Headquarters)
DP |08 |08 |OW |1 Salaries/Benefits
DP {08 |08 |OW [2 Dislocation Allowance
DP {08 {08 (OW [3 Travel
DP {08 |08 joW |4 Office Support
OP {08 |08 jowW [5 Equipment
OP (08 |08 |OW [6 Other Costs
x OP (08 {09 |00 [0 Advanced Design & Production Technologies Campaign
DP 08 |09 /|01 /0 Process Development Program
DP {08 [09 |02 !|0 Enterprise Integration Program
DP /|08 |09 |03 {0 IPPD/Agile Manufacturing
DP j08 |jo9 |ow |o M&O Contractor Employee Cost (at Headquarters)
DP jos jog |ow |1 Salaries/Benefits
DP {08 |09 |OW !|2 Dislocation Allowance
DP |08 |09 |OW |3 Travel
DP |08 |09 |OW {4 Office Support
DP |08 |O09 |OW [5 Equipment
DP (08 |09 [OW [6 Other Costs
ATT B -- NNSA FY03 BRs § 7130/2003
Routing | Division [ Control Budget and
Symbol | Code Level Reporting Codes Budget and Reporting Titles
Section 15
X DP (08 (10 (00 {0 Inertial Confinement Fusion and High Yield Campaign
DP |0o8 {10 {01 0 ignition
DP (08 {10 |02 10 Support of Stockpile Program
DP [08 {10 (03 [0 ICF/NIF Experimental Support Technologies
DP {08 |10 /|04 [0 High Yield Assessment
DP /08 |10 |05 {0 University Grants/Other ICF Support
DP |08 |10 |06 |0 NIF Other Projects Costs
DP |08 |10 |07 |0 Operations of Facilities
DP |08 /10 |08 {0 Inertial Fusion Technology
DP j|08 |10 |j09 |0 NiF Demonstration Program
OP j08 |10 |OW_|0 M&O Contractor Employee Cost (at Headquarters) _
OP j0o8 {10 jOW 1 Salaries/Benefits
DP j08 (10 |OW {2 Dislocation Allowance
OP (08 (10 |OoW {3 Travel
DP |08 (10 |OW [4 Office Support
DP {08 |10 [OW {5 Equipment
DP {08 |10 OW [6 Other Costs
Xx DP |08 {11 00 = =(|0 Advanced Simulation and Computing Campaign
DP |08 j|11 |01 |0 Advanced Applications Development
DP (08 |11 |02 {0 Verification and Validation
DP |08 |11 {03 {0 Materials and Physics Modeling
OP |08 |11 {04 j0 Integrated Computing Systems (ICS)
DP j|08 j|11 |04 #114 Physical Infrastructure and Platforms
DP {08 {141 (04 {2 Ongoing Computing
DP (08 {11 (04 {3 Advanced Architectures
OP (08 (11 (05 {0 Simulation and Computer Science
DP |08 (11 |05 |1 Problem Solving Environments (PSE)
DP |08 |11 {05 {2 Distance Computing (DisCom) _
DP {08 |11 {05 |3 PathForward
DP {08 {11 |05 |4 Visual Interactive Environment for Weapons Simulation (VIEWS)
DP |08 [11 /06 {0 ASCIi Special Projects
DP |08 {11 /06 |1 ASCI Super Computing (SCxx) Research Exhibit Projects
DOP j08 |11 #|06 {2 1 Program/3 Labs
OP |08 |11 j07 |0 University Partnerships
OP {08 j|11 |07 |1 Academic Strategic Alliances Program
OP (08 {11 |O7 {2 Institutes
| DP (08 {11 {07 {3 Computational Science Graduate Fellowships (Krell)
OP (08 |11 (07 {4 Academic Technology Demonstration Centers
DP {08 {11 jOW [0 M&O Contractor Employee Cost (at Headquarters)
DP |08 {11 {OW /1 Salaries/Benefits
DP {08 |1t |OW [2 Dislocation Allowance
DP |08 |11 jOoW |3 Travel
DP j08 |11 jOW /4 Office Support
DP [08 /11 |OW |5 Equipment
DP |08 |11 |OW |6 Other Costs
x DOP |08 |12 |00 |0 Pit Manufacturing and Certification Campaign
OP (08 (12 jOW [0 M&O Contractor Employee Cost (at Headquarters)
OP j08 \12 |OW 31 Salaries/Benefits
DP (08 |12 |jOW 42 Distocation Allowance
DP (08 (12 |OW |3 Travel
DP |08 (12 (OW (4 Office Support
DP {08 {12 (OW [5 Equipment
OP {08 {12 (OW [6 Other Costs
DP {08 {12 {10 |0 Pit Manufacturing
OP |08 {12 #|11 #/|0 Pit Certification
DP (08 /12 /12 #|0 Pit Manufacturing Capability
DP |08 112 1/13 |0 Modem Pit Facility
x Readiness Campaigns
xX DP {08 |13 ;00 |0 Stockpile Readiness Campaign
DP (08 413 |01 |0 Establish Near-Term Process Capability
DP (08 (13 (02 |0 Modemize Manufacturing Facilities
DP (08 {13 [07 #|0 Evaluate Material Requirements and Specifications
DP (08 (13 (08 (0 Evaluate Designs for lmproved Manufacturability
DP {08 {13 (09 (0 Establish Near-Term Process Capability
DP j08 |13 jOW (0 M&O Contractor Employee Cost (at Headquarters)
DP j08 (13 jOoW {1 Salaries/Benefits
DP [08 |13 jOW |2 Dislocation Allowance
DP /08 |13 jow {3 Travel
DP [08 |13 |OW |4 Office Support
DP j08 #113 = jOoW {5 Equipment
OP (08 j|13 jOW {6 Other Costs
OP {08 413 410 10 Modemize Manufacturing Facilities
DP (08 (13 {11 40 Implement Science and Model Based Manufacturing Information Systems
ATT B -- NNSA FY03 BRs
6
7130/2003
Code Level
X
ATT B -- NNSA FYQ3 BRs
0
0
Q
oO
0
0
1
2
3
4
5
6
0
0
0
0
0
0
0
0
1
2
3
4
§
6
0
0
WINK A[OIN|—=(OIN/]/O/Ol alin WIN /—/O}t
Section 16
DSpO/OjOolHnyjn
of New Processes/T:
Product
tion
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
Collaborative
Nonnuclear
Chain
Enhance Processes for New
Modemize Current
Methads
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
Materials
Travel
Office
Other Costs
Commercial Water Reactors
Production
Accelerator Production of Tritium
Accelerator Production of Tritium
Joint APT/ATW Transition
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
7/30/2003
Symbol
Code
Control
Level
Budget and
Reporting Codes
Budget and Reporting Titles
Approp. Symbol: 89X0240
Title: Weapons Activities
Fund Type: TC
DP |09 {00 (a0 [0 READINESS IN TECHNICAL BASE AND FACILITIES (RTBF)
x DP {09 |01 |00 {0 Operations of Facilities
DP {09 |01 {01 Jo R&D Facilities - Lawrence Livermore National Laboratory
DP {09 |01 |01 #JA Engineering Facilities
DP {09 {01 {01 JB HE Test Facilities |
DP {09 [01 (01 |[C Physics Facilities
DP /09 [01 01 |F Institutional Facilities
DP {09 {01 |07 |H LLNL NV Experimental Support
DP joo #j01 j01 {J NIF Other Project Costs
DP jag {01 |01 |K Superblock Complex (Buildings 331, 332, and 334) |
OP |0o9 j01 [01 TL Other Facility Costs
DP {09 |01 [01 [M AVLIS
DP {09 |01 |02 {0 R&D Facilities - Los Alamos National Laboratory Facilities
DOP j}09 |01 02 JA Atlas
DP {09 {01 {02 \B Central Computing Facility
DP j|09 [01 [02 IC DARHT
pp fog {o1 |o2 Ip Engineering Facilities (Testing, Standards and Calibration, High Explosives, Machine
Shops, Assembly and Storage) _
DP (09 |01 02 |E Firing Sites
DP j|09 {01 02 ~=|F High Explosives Detonation Facility
DP |09 {01 02 ~=#=IG High Explosives Science Facilities
DP /09 |01 {02 |H Laboratory Data Communications Center
OP |09 j01 j02 II Los Alamos Neutron Science Center
DP |09 (01 |02 {J Pegasus
DP |09 (01 {02 (|K PHERMEX
OP |o9 {01 /02 [L Sigma (Buildings 35, 66 and 159)
DP |09 {01 |02 |M Strategic Computing Facility
DP j|09 (01 j02 JO Target Fabrication
DP (09 |01 [02 JR Waste Management Facilities
DP (09 |01 |02 |S Other Facility Costs
OP 09 |01 |04 /|O R&D Facilities - Nevada Operations Office
DP |09 [01 |04 JA Atlas
DP j|09 |01 |04 |B High Explosive Facilities
DP (09 101 |04 [Cc Control Plant Complex
DP |09 |01 [04 |D Device Assembly Facility
DP |09 |01 [04 |E Joint Actinide Stock Physics Experimental Research Facility (JASPER)
DP [09 [01 {04 |F Lawrence Livermore Technical Facility
DP |09 101 |04 |G Los Alamos Technical Facility
DP (09 (01 {04 JH North Las Vegas
DP (09 [01 [04 [I Uta Complex
DP (09 {01 {04 |J Other Facility Costs
DP |09 {01 |05 |0 R&D Facilities - Sandia National Laboratories Facilities
DP j09 101 05 |A AL Full-scale Experimental Complex
DP io9 jo1 {05 jB Compound Semiconductor Research Laboratory
DP (09 (01 [05 [C Experimental Aerodynamics
DP |09 |01 |05 ([D HERMES II!
DP |09 (01 [05 |E Microelectronics Development Laboratory
DP j09 (01 #/05 [F SATURN
DP {09 [01 |05 {|G SPHINX
DP_ {09 |01 |05 [H TA-5 (ACRR, SPR, GIF, RML)
DP {09 {01 |05 [I Tonopah Test Range
DP [09 |01 [05 [J 4
DP j|09 #|01 #/05 [IK Other Facility Costs
DP {09 (01 (05 jL Annular Core Research Reactor (ACRR)
DP |09 (01 (07 [0 Production Facility - Kansas City Piant
DP {09 |0O1 {08 |0 Production Facilities - Los Alamos National Laboratory
DP j09 |01 08 jA Beryllium Technology Facility
DP {09 [01 [08 (|B CMR Building
DP |09 #|01 [08 {[G TA-18
Section 17
DP_|09 (01 |08 |H TA-55
DP j09 j01 [08 |I Target Fabrication
DP jog (01 j08 jJ Tritium Facilities (WETF, TSFF)
DP |o9 |01 [08 [IK Other Facility Costs
OP_ |09 (01 [09 [0 Oak Ridge National Laboratory (ORNL) - Building 3019
ATT B -- NNSA FY03 BRs
8 ~~ 713072003
Code Level
Production - Pantex Plant
Production Facilities - Sandia National Laboratories
870
Standards Laboratory
Other Costs
Savannah River Site - Tritium Facility
Y-12 Plant Facilities
9201-5
9201-5N
9204-2
9204-2E
9212
9215
9995
9998
Other Costs
Stockpile Initiative
Intersite Institutional
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
National Center for Terrorism
L
M
N
0
0
0
0
4
2
3
4
5
6
0
0
2
Process
Common Use Stores
Reactor Materials
Other Materials
in Collateral Funds and Other
ClO] An
NTS Readiness
Pulsed Power Science and Other Technical
TA-18 Relocation
Materials Classified
Critical Production and Skills
Enhanced Test Readiness
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Al PIWIN/=/O/OlOlo;o
Other Costs
Process
Common Use Stores
Materials
Other
Funds
Preservation
ATT B -- NNSA FY03 BRs 9 7/30/2003
r Routing Division | Control Budget and
Symbol | Code Level Reporting Codes Budget and Reporting Titles
DP |09 |03 |OW 10 M&O Contractor Employee Cost (at Headquarters)
DP jog j03 jOW {1 Salaries/Benefits
DP |09 {03 |OW {2 Dislocation Allowance
DOP |09 |03 |OW {3 Travel
DP {09 {03 |OW |4 Office Support
DP {09 |03 jOW {5 Equipment
OP j|09 |03 jOW {6 Other Costs
DP jog {03 |81 4j0 Change In Inventories
DP |09 (03 (81 {2 Special Process Spares
DP {09 [03 (81 |3 Common Use Stores
DP j|09 |03 /{81 j4 Special Reactor Materials
DP |09 |03 (81 {5 Other Special Materials
OP j|0S {03 j8t [6 Change in Collateral Funds and Other Deposits
Xx DP |09 {04 |00 40 Material Recycle and Recovery
DP [09 (04 |01 |0 Recycle Activities
DP {09 |04 |02 |0 Recovery Proc
DP {09 {04 |03 /|0 Enriched Uranium Operations
DP {09 |04 |04 {0 Uranium Scrap Recovery - Commercial
DP j|09 |04 |05 10 Precious Metais Recycle
OP jog {04 OW 10 M&O Contractor Employee Cost (at Headquarters)
DP [09 (04 OW |4 Salaries/Benefits
DP {09 (04 |OW |2 Dislocation Allowance
DP {09 {04 |OW /|3 Travel
DP 109 |04 [OW [4 Office Support
OP j|09 |04 |OW [5 Equipment
OP (09 {04 jOow {6 Other Costs
X DP {09 {05 |00 |0 Containers
DP |09 {05 |01 |0 Research and Development
DP {09 |05 {02 |0 Recertification and Maintenance
DP |09 (05 |03 |0 Production
DP j09 |05 |ow jo M&O Contractor Employee Cost (at Headquarters)
OP jog |05 jOW j1 Salaries/Benefits
DP (09 {05 OW [2 Dislocation Allowance
DP |o9 {05 [ow |3 Travel
DP j0o9 {05 |OW |4 Office Support
DP |09 |0S |OW [5 Equipment
DP {09 |05 j|OW j6 Other Costs
Xx OP {09 06 |00 {0 Storage
DP (09 (06 (01 {0 Weapon Material
DP {09 {06 |02 |0 Non-Weapon Material
OP jog |06 |jow |0 M&O Contractor Employee Cost (at Headquarters)
DP /09 |06 [OW /}4 Salaries/Benefits
OP |09 |06 |OW 1/2 Dislocation Allowance
OP jo9 \06 jOow j3 Travel
DP {09 |06 |OW |4 Office Support
DP |09 |06 |OW [5 Equipment
DP {09 |06 |OW {6 Other Costs
Section 18
x DP |09 |09 {00 {0 Weapons Incident Response
DP /09 |09 j01 |0 Nuclear Emergency Support Team
OP |09 j09 |01 41 Search Operations
DP {09 |09 {01 {2 Technical Integration
DP {09 {09 (01 {3 Search Training and Drills
DP {09 |09 {01 |4 Joint Technical Operation Team (JTOT) Operations
OP |09 |09 {01 [5 Training and Drills
OP j09 {09 |02 [0 Nuclear Radiological Advisory Team
OP |09 |09 |02 #11 Operating
DP |o9 {09 {02 j3 Training and Drills
DP {09 /09 |03 [0 Accident Response Group/Disposition
DP {09 |09 |03 [1 Operating
DP |09 {09 |03 {2 Disposition
DP |09 |09 |03 {3 Training and Drills
DP |09 |09 |04 10 Consequence Management Teams
OP {09 |09 |04 #11 Operating
DP (09 |09 |04 {3 Training and Drills
DP {09 |09 {j05 |0 Special Applications
DP_|09 |09 {05 (1 Exercise/Special Activities
DP {09 |09 j|05 |2 Interagency Agreements
OP j09 j09 #05 43 National Security Special Events (NNSE)/Special Exercises
OP jog {09 {05 |4 Emergency Response/Support Logistics
OP {09 {09 (06 [0 Atmospheric Release Advisory Capability (ARAC)
DP j09 (09 {06 |1 Operating
DP {09 {09 |06 /|2 Technical Integration
DP_|09 |09 #|06 {3 Training and Drills
ATT B -- NNSA FY03 BRs
10 7/30/2003
udget an
Reporting Codes Budget and Reporting Titles
09 (09 |07 (0 Aerial Measurement System
og |o9 |07 |1 Operating
09 |09 {07 |2 Technical Integration
09 j09 j|07 {3 Training and Drills
og {09 \07 {4 Aerial Measuring System Special Application
og {09 |08 |0 Radiation Emergency Assistance Center/Training Site (REAC/TS)
og jo9 {08 [1 Operating
og |09 [08 |3 Training and Drills
09 |o9 (09 |0 Radiological Assistance Program (RAP)
og {09 |09 |2 Training and Drills
og jo9 |09 [3 Operating
og |09 |jOW 10 M&O Contractor Employee Cost (at Headquarters)
o9 j09 |OW j1 Salaries/Benefits
og joo jow {2 Dislocation Allowance
og (09 |OW [3 Travel
o9 j|09 |jOow |4 Office Support
09 jo9 |OW [5 Equipment
09 j09 jOW [6 Other Costs
09 |09 {11 10 Emergency Management
og {09 j11 #11 Operating
og |09 |11 {2 Contracts/Interagency Agreements
o9 |09 #|11 #=4|3 Training
og jog {81 490 Change in Inventories
o9 |09 {81 {2 Special Process Spares
09 {09 {81 {3 Common Use Stores
og j09 |81 |4 Special Reactor Materials
og jo9 j|81 #15 Other Special Materials
og (09 (81 #(|6 Change in Collateral Funds and Other Deposits
OP {09 [20 |0 RTBF - Construction Projects
DP |09 |20 |1 R&D Facilities
DP |09 |20 /|2 Production Facilities
OP {09 420 43 Other
ATT B -- NNSA FY03 BRs 11 7/30/2003
Code Level
ATT B -- NNSA FY03 BRs
Codes
: 89X0240
BSposyofololojofalololajala
Title: W
Fund T:
Activities
TC
and
F
M&O Contractor
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
12
7/30/2003
Code
Level Codes
: 89X0240 Title: W Activities
Fund T : TC, 8c
SAFEGUARDS SECURITY
-NNSA
Protective Forces
T
information
infrastructure
Personnel
Material Control and
T and
O Contractor Cost (at
Allowance
ravel
Costs
ATT B -- NNSA FY03 BRs 13
7130/2003
ATT B -- NNSA FY03 BRs
Codes
: 89X0243
00
00
01
21
21
00
01
21
21
1
1
1
1
2
2
2
3
Title: Other Defense Activities
Fund TF
New Production Reactors
Water
Other Costs
Travel and T; of Persons
Travel To Travel
T Gas Reactor
Other Costs
Travel and T of Persons
Travel To Travel
Water Reactor
Other Costs
Travel and T of Persons
Travel To Travel
Other Costs
Travel and T: of Persons
Travel To Travel
Section 19
Altemative T
Travel and T of Persons
Travel To Travel
Personal Services
Full Time Permanent - Base Salaries
All Other Personal Services
Incentive Awards
Personnel Benefits
All Other Personnel Benefits
Benefits For Former Personnel
Contractual Services And
T Of
Standard Level User
Other Rent And Utilities
And
Services Performed By Other
Other Services
And Materials
7;
Technical
ravel and T of Persons
Travel To Travel
Other Costs
Travel and Ti of Persons
Travel To Travel
Water Reactor
T Gas Reactor
Water Reactor
and
and
14
7130/2003
Codes
Title: Defense Nuclear
F : NS/OS; NT/OS; and NK/OS
Defense Nuclear
Direction
NNSA Information T
T Related and Assistance Services
and Site Information T. Services
Other NNSA Information T Services
and Verification Research and
00-D-192 & Inter Center
Proliferation Detection
Demonstrations
Nuclear
Satellite-Based
Ground-Based
Chemical & National
T Initiatives
Domestic Demonstration and
Activities
Research Grants
HAZMAT Center
Outreach and Publication Activities
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
& Intern Center
Reactor
Ti and Simulators
and Maintenance
Assessments Infrastructure
Plutonium Production Reactor
Infrastructure
International Nuclear Centers
International Center
Research Reactors
Non-reactor Nuclear Facilities
Shutdown and
International Nuclear Review
Nuclear Research
Resistant Nuclear T.
Evaluation
Demonstration
Fuel
Demonstration
Activities
Global Nuclear Risk Assessment
Event
echnical Assessment Immersion Center
Technical
Reactor
and
Measures and Technical
in Russia
U.S. Monitors of PPO
Russian facilities
Visits to Russia
Costs
Russian facilities
Costs
in the U.S. &
Russian
ATT B -- NNSA FY03 BRs
Portable
maintenance
Technical Activities
Data and
Lab Technical and
Worker health and
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
T
T,
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
of Grade Plutonium Production in Russia
Seversk Plutonium Production Elimination
Plutonium Production Elimination
Russian Plutonium Production Reactors
Technical Activities
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
Activities
Enrichment Research and Test Reactor
Fuel Retum
Fuel
of Korea
Dismantlement & Fissile Material Tr
and
of Korea
- 244
of & in the NIS/Baltics
of Mass Destruction Elimination
Verification
Control
Control
Information Network
16
7130/2003
ATT B -- NNSA FY03 BRs
M&O Contractor
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
T initiatives
Initiatives for Proliferation Prevention
Initiatives for Proliferation Prevention
Initiatives for Proliferation Prevention
Nuclear Cities Initiative
Nuclear Cities Initiatives
Nuclear Cities Initiatives
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
Nuclear Materials Protection &
Nuclear Warhead Sites
Fuel Sites
Materials
Labs Sector
Uranium Sector
Nuclear Sites
Material Conversion and Consolidation
Fuel Sites
and
Federal
and Infrastructure
Site Level
Detection and
Second Line of Defense
Nuclear Assessment
Rocket Forces
Consolidation and Conversion
Devices
Devices
Activities in
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
Plutonium
and Conversion
and Associated
-Based T:
Infrastructure
Assessment
Uranium
233
Activities
HEU
233
Section 20
Plutonium Pit
Environmental
17
7130/2003
ATT B -- NNSA FY03 BRs
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
Materials
Russian Plutonium
Plutonium Conversion
Immobilization
Mixed Oxide Fuel Fabrication
VVER-1000 Reactors
BN-600 Reactors
and
and
Technical and
and Ti
of MOX Fuel Fabrication
Reactor Ti
Work in Russia
U.S. to Work in Russia
S. and
Plutonium Conversion
Immobilization
MOX Fuel Fabrication
VVER-1000 Reactors US
BN-600 Reactors
and
and
Parallex
Technical and
and T:
Nuclear Commission
of MOX Fuel Fabrication
Russian Plutonium
Plutonium Conversion
MOX Fuel Fabrication
VVER-1000 Reactors
BN-600 Reactors
and
and
Technical and
and Ti
of MOX Fuel Fabrication
M&O Contractor Cost (at
Salaries/Benefits
Dislocation Allowance
Travel
Office
Other Costs
Purchase and
Research Reactor Fuel Purchase
RERTR
MCC
Activities
and Conversion
and Associated
Fuel Fabrication 143
Infrastructure
Blend Down
Nuclear Materials
18
7130/2003
Code
Level
Codes
89X0313.91
Title: PROGRAM DIRECTION - Office of the Administrator
AD Official and
Personnel Salaries and Benefits
Salaries
NNSA Salaries International Offices
International Offices Salaries
Benefits
NNSA Benefits International Offices
International Offices Benefits
Other
Travel and T; of Persons
Office of the Administrator
for
Immediate Office for Defense
and Simulation
and
Office for Defense Nuclear
immediateOffice for Defense Nuclear
International Offices
Research and
International Nuclear and
Control and
International Materials Protection and
Materials
for Facilities and
Office for Facilities and
and Facilities
and Health
and
and
and Administration
for and Administration
and Evaluation
and Assistance
Resources
Information Officer
Services
and Assistance
Immediate of the Administrator
Immediate Office for
and
and
for Defense Nuclear
Immediate Nuclear
International Offices
Research and
International Nuclear and
Arms Control and
International Materials Protection and
Fissile Materials
Facilities and
Facilities and
and Facilities
and Health
and
and
and Administration
for and Administration
and Evaluation
and Assistance
Resources
information
0 2 -ntrmmntnitae aD NSIS
ATT B -- NNSA FY03 BRs
of the Administrator
Office for Defense
immediate Office for
and Simulation
and
Office for Defense Nuclear tion
ImmediateOffice for Defense Nuclear
International Offices
tion Research and
international Nuclear and
Control and
International Materials Protection and
Fissile Materials
for Facilities and
Office for Facilities and
and Facilities
and Health
and
and
and Administration
for and Administration
and Evaluation
and Assistance
Resources
information
Related
of the Administrator
Defense
Immediate for Defense
and Simulation
and
for Defense Nuclear
for Nuclear
International
Research and
International Nuclear and
Control and
International Materials Protection and
Materials
for Facilities and
for Facilities and
and Facilities
and Health
and
and
and Administration
and Administration
and Evaluation
and Assistance
Resources
Services
Contractual Services
Federal and Maintenance
Federal &
Other
20
7130/2003
Code Level
ATT B -- NNSA FY03 BRs
SlOlSlS[SOlAalolololainjajolr|/a
Fund
and Other Personnel Costs
to be Performed
Human Resource Information
Administrative Services
and
& Maint
Information
Telecommunication
Office Automation
Procurement Services
Contract Audits
Contract Closeout
Information
Line
and Ti Services
Costs
Activities
NNSA and
in Lieu of Taxes
Northern New Mexico Pueblos
Section 21
information T.
Information T. related and Assistance
and Site Information T. Services
NNSA Information T: Services
Direct Information T. Services
Shared Information T: Services
NNSA HQs Information T
Direct HQs Information T Services
Shared NNSA HQs information T Services
Information T Services
Nevada Information T: Services
Oakland Information T.
Other T Services
Other Information T: Services
Direct Other Information T. Services
Shared Other Information T Contractual
Related Information T:
Direct Other Related
Shared Other Related
21
713012003
Code Level
: 8930313.91 Title: PROGRAM DIRECTION - Defense Nuclear
AD Official and
PROGRAM DIRECTION - Defense Nuclear
Personnel Salaries and Benefits
NNSA NN Salaries
International Offices Salaries
Benefits
NNSA NN Benefits
International Offices
Other
Travel and T. of Persons
ImmediateOffice for Defense Nuclear
International
Research and
International Nuclear and
Intemational
International Materials Protection and
Fissile Materials
Shared
Field
and Assistance
Immediate Office for Defense Nuclear
International
Research and
International Nuclear and
International
International Materials Protection and
Fissile Materials
NiO) jl cln] 310
Field
for Defense Nuclear
International
Research and
International Nuclear and
International
International Materials Protection and
Fissile Materials
Shared
Field
Related
ImmediateOffice for Nuclear
International
0
1
2
3
4
5
6
7
Research and
International Nuclear and
Intemational
International Materials Protection and
Fissile Materials
Field
Contractual
Federal and Maintenance
Federal
Other Services
Fund
and Other Personnel Costs
to be Performed
Human Resource
Services
and
Maint
Information
Telecommunication
Office Automation
Services
Audits
Closeout
Routing | Division | Control
Symbol | Code Level
Budget and
Reporting Codes
Budget and Reporting Titles
PN [02 {88 [53 0 On Line Learning
PN (02 (88 {54 0 Personnel and Training Services
PN |02 [88 |94 0 Indirect Operating Costs
PN j02 {99 [00 0] [Miscellaneous Activities
PN |02 |99 {01 0 NNSA Reception and Representation
PN |02 {99 [02 0 Special Projects
PN {03 [00 [00 0| |NNSA Information Technology
PN {03 {01 [00 Q Information Technology retated Advisory and Assistance
PN [03 |02 {00 0 Enterprise and Site Specific Information Technology Services
PN {03 j02 [01 0 NNSA Enterprise Information Technology Services
PN |03 |02 {01 1 Direct NNSA Enterprise Information Technology Services
PN {03 |02 [01 2 Shared NNSA Enterprise Information Technology Services
PN {03 [02 |02 0 NNSA HQs Operations Information Technology Services
PN [03 [02 [02 4 Direct NNSA HQs Operations Information Technology Services
PN {03 [02 [02 2 Shared NNSA HQs Operations Information Technology Services
PN {03 [02 [03 0 Albuquerque Operations Information Technology Services
PN |03 [02 [04 0 Nevada Operations Information Technology Services
PN /03 [02 [05 0 Oakland Operations Information Technology Services
PN |03 102 [06 0 Other NNSA Sites Information Technology Services
PN /03 {03 [00 0 Other Information Technology Contractual Services
PN {03 |03 [01 0 Direct Other information Technology Contractual Services
PN {03 [03 [02 0 Shared Other Information Technology Contractual Services
PN {03 {04 |00 0 Other Related Information Technology Services
PN {03 [04 {01 0 Direct Other Related Information Technology Services
PN {03 {04 |02 0 Shared Other Related Information Technology Services
ATT B -- NNSA FY03 BRs
23
7/30/2003
Section 22
A contract identification code will be re
following is a list of the Department’
DOE Contract Identification Codes
approved funding program (AFP).
AFP
Recipient
Code Major Operating Contract Name
AL Honeywell Federal Manuf. & Tech., LLC (Kansas City)
AL University of California (LANL)
AL Lockheed Martin - Sandia National Lab (SNL)
AL BWXT Pantex, LLC
AL Midwest Research Institute (NREL)
CB Westinghouse TRU Solutions, LLC (WIPP)
AM Iowa State University (Ames Laboratory)
AN Univ. of Chicago (Argonne Nat'l. Lab.)
BN Science Associates (Brookhaven Nat’] Lab)
CH Universities Research Assoc., (FERMI)
CH Princeton University (PPPL)
ID Bechtel B & W Idaho (INEEL)
NV Bechtel Nevada, Corp.
NV TRW Environmental Safety Systems (TESS)
OH Babcock & Wilcox (Mound)
OH Fluor Daniel - Fernald (FERMCO)
OH West Valley Nuclear Services
OR Bechtel Jacobs (K-25, Paducah, Portsmouth)
OR British Nuclear Fuel Limited (K-25)
OR UT- Battelle LLC (ORNL)
OR Lockheed Marietta Energy Systems (LMES) (Y-12)
OR Southeastern Univ. Res. Assn. - Thomas Jefferson
Nat’! Accelerator Facility (CEBAF)
OR Oak Ridge Associated Universities (ORISE)
PN Bechtel Bettis, Inc.
RF Kaiser Hill
RL Battelle Memorial Institute (PNL)
RL Bechtel Hanford
RL Hanford Environmental Health Foundation
RL Fluor Daniel Hanford
RV CH2M Hill Hanford Group
SF Stanford University (SLAC)
SF Univ. of California (Lawrence Berkeley National
Laboratory)
SF Univ. of California (Lawrence Livermore National
Laboratory)
SP Dyn McDermott Petroleum Operations Co.
SR Westinghouse Electric (Savannah River Site and
Technology Center)
ST Lockheed Martin -Knolls Atomic Power Inc. (KAPL)
When distributing funds not identified b
category Other.
Attachment C
quired for each line included in the approved funding programs. The
s Major Operating Contractors to be used when distributing funds in the
Identification Code
AL66850
ALENG36
AL85000
AL66620
GO10337
AL66444
CHENG82
CHENG38
CH10886
CH03000
CH03073
1D13727
NV11718
RW00134
OH20044
OR21972
NE44139
OR22700
OR22576
OR22725
OR22800
ER40150
OR22750
PN38206
RFO1904
RLO1830
RL12367
RL13686
RL13200
RL14047
SF00515
SF00098
SFENG48
PO18000
SR18500
SN00052
y a specific contractor code use the Identification Code 9999999 for
Attachment D
FY 2003 REQUEST FOR AFP CHANGE & CERTIFICATION OF FUNDS AVAILABILITY
U.S. DEPARTMENT OF ENERGY
NATIONAL NUCLEAR SECURITY ADMINISTRATION (NNSA)
APPROVED FUNDING PROGRAM (AFP) CHANGE
Project Name/WBS No. (If applicable)
Construction Project No. and Title
Amount [Budget Authority -- $ 000s]
Service Center/ Site/Operations Office/ Contractor
INCREASE
B&R Code & Title
Project Name/WBS No. (If Applicable)
Construction Project No. and Title
Amount [Budget Authority -- $ 000s)
Service Center/ Site/Operations Office/ Contractor
REDUCTION FROM SOURCE #1
B&R Code & Title
Project Name/WBS No. (If Applicable)
Construction Project No. and Title
Amount [Budget Authority -- $ 000s]
Service Center/ Site/Operations Office/ Contractor
REDUCTION FROM SOURCE #2
B&R Code & Title
Project Name/WBS No. (If Applicable)
Construction Project No. and Title
Amount {Budget Authority -- $ 000s]
Service Center/ Site/Operations Office/ Contractor
7. Approved By:
(CURRENT MONTH)
1. ORIGINATOR:
NAME ORG. CODE TELEPHONE No. DATE
2. EXPLANATION OF CHANGE:
3. DELIVERABLES AND MILESTONES:
4. FUNDING CHANGE: 5. CHANGE TYPE: 6. FUND TYPE
INCREASE
B&R Code and Title
Headquarters Project/Program Manager Date
8. FIELD CERTIFICATION OF FUNDS AVAILABILITY (FOR DEOBLIGATION)
Section 23
I certify that all reductions in allotments resulting from the changes, as requested, have been verified with the allottees as
being unobligated and available for withdrawal.
Name
Organization Telephone No. Date
ALLOTTEE
Operations and Field Offices
NNSA Field Financial Mgmt.
(Includes previously known as:
Albuquerque
Nevada
Oakland)
Chicago
Idaho
Oak Ridge
Ohio
Richland
Rocky Flats
Savannah River
CONTACTS FOR VERIFICATION OF FUNDS AVAILABILITY
FOR WITHDRAWAL OF ALLOTTED FUNDS
NAME OF
CONTACT(S)
Jeffrey J. Berger
Kathy R. Carrillo
Gladys Garcia-Roybal
Kevin K. Goetz
Gerald G. Hammond
Sharon House
Edward J. Knuckles
Douglas Low
David L. Marks, Jr.
Larry Martell
Mary J. Sunderland
Thomas Foley
Charles A. Zagozdon
John N. Wilson
Marilyn D. Quast
Katherine A. Vivian
Mark L. Searle
Alan G. Stokes
Jenifer Hackett
Deborah Widener
Stephen W. Morrell
Kay Hansen
Lisa Maul
Patricia Pennington
Claudia Bai
Dennis Long
Robert R. Tibbatts
Christopher Herndobler
John B. Seliards
Debra L. Kiug
Emily D. Irwin
C. Lance Schlag
Harold G. Armenta
John Pescosolido
James Buice
TELEPHONE
NUMBER
702-295-5509
505-845-6740
505-845-4142
702-295-0972
505-845-5082
510-637-1567
510-637-1572
510-637-1570
702-295-3126
510-637-1580
630-252-2410
630-252-2414
630-252-2509
208-526-0515
208-526-0005
208-526-0337
208-526-5454
865-576-8096
865-576-0638
865-576-0781
865-576-0799
937-865-3844
716-942-2163
937-865-4265
937-865-5073
937-865-4521
509-376-8669
509-376-6684
509-373-0664
509-376-6367
509-373-2656
303-966-3171
303-966-4760
803-725-5590
803-725-2263
Page 1of 2
Attachment E
INTERNET ADDRESS
bergerj @nv.doe.gov
kcarrillo @ doeal.gov
gkgarcia @ doeal.gov
goetz @nv.doe.gov
ghammond @doeal.gov
sharon.house @ oak.doe.gov
edward.knuckles @oak.doe.gov
douglas.low @ oak.doe.gov
marksd @ nv.doe.gov
larry.martell @ oak.doe.gov
mary.sunderland @ ch.doe.gov
thomas.foley @ch.doe.gov
charles.zagazdib @ch.doe.gov
wilsonjn @id.doe.gov
quastmo @id.doe.gov
vivianka @ id.doe.gov
searleml @id.doe.gov
stokesa @ oro.doe.gov
hackettj@ oro.doe.gov
widenerd @ oro.doe.gov
morrells @ oro.doe.gov
kay. hansen @ ohio.doe.gov
lisa.maul @ ohio.doe.gov
trish.pennington @ ohio.doe.gov
claudia.bai @ ohio.doe.gov
dennis.long @ ohio.doe.gov
robert_r_tibbats @rl.gov
christopher_herndobler @ ri.gov
john_b_sellards @rl.gov
debra_|_klug @rl.gov
emily_d_irwin@rl.gov
lance.schlag @ rf.doe.gov
harold.armenta @ rf.doe.gov
john.pescosolido @ srs.gov
james.buice @ srs.gov
ALLOTTEE
NAME OF
CONTACT(S)
Operations and Field Offices (cont.)
National Energy Technology
Laboratory
Power Marketing Administrations
Southeastern
Southwestern
Western Area
Other Allottees
Chief Financial Officer
CFO (for all Headquarters
approved funding
program recipients)
FERC
William Dulin
Martin Beck
Michael L. Tiberio
Edward G. Loudin
Fred Easom
Leon Jourolmon
Roberta Sigworth
Gary Swartzlander
Byron Nielson
Harry Pease
Kim Davis
Shirley Barker
Carole A. Hart
Juanita DeLair
Kathryn Schanck
George Tengan
Bili Robinson
Thomas R. Herlihy
Stacie Davis
John Sotelo
Naval Petroleum R (see CFO above)
California
Pittsburgh Naval Reactors
Office
Schenectady Naval Reactors
Office .
Scientific & Technical
Information Office
Strategic Petroleum
Reserve Project
Management Office
David Hummel!
Gary White
William Leahy
Michael Nolan
Brian Hitson
Pamela Hood
M. T. Huntsman
Pam Callahan
TELEPHONE
NUMBER
304-285-4763
412-386-4556
304-285-4179
304-285-4341
706-213-3838
706-213-3835
Section 24
918-595-6633
918-595-6634
720-962-7450
720-962-7500
301-903-4899
301-903-3632
301-903-4432
301-903-9428
301-903-1322
301-903-5878
301-903-3506
202-502-8300
202-502-8427
202-502-6124
Page 2of 2
INTERNET ADDRESS
william.dulin @ netl.doe.gov
martin.beck @ netl.doe.gov
michael.tiberio @ netl.doe.gov
edward.loudin @ net!.doe.gov
frede @ sepa.doe.gov
leonj@sepa.doe.gov
bobbi.sigworth @ swpa.gov
gary.swartziander @ swpa.gov
nielson @ wapa.gov
pease @ wapa.gov
Kim.Davis @ hq.doe.gov
Shirley.Barket @hq.doe.gov
Carole. Hart @ hq.doe.gov
Juanita. Delair@hq.doe.gov
Kathryn.Schanck @ hq.doe.gov
George. Tengan @hq.doe.gov
Bill.Robinson @ hq.doe.gov
thomas.herlihy @ferc.gov
stacie.davis @ferc.gov
john.sotelo @ferc.gov
Naval Petroleum Reserve -
Colorado, Utah, & Wyoming (see CFO above)
412-476-7256
412-476-7254
518-395-4264
518-395-6358
423-576-1199
423-576-4304
504-734-4296
504-734-4224
hummetdm @ bettis.gov
whitega @ bettis.gov
brian. hitson @ ccmail.osti.gov
pam.hood @cemail.osti.gov
tommy.huntsman @spr.doe.gov
pam.callahan @ spr.doe.gov
DOE F 1325.8
(08-93)
Attachment F
United States Government Department of Energy
memorandum
DATE:
REPLY TO
ATTN OF:
TO:
--SAMPLE--
NA-62 (Budget Execution Contact)
SUBJECT: Confirmation of Funds Available for Withdrawal
Director, Customer Service Division, CR-51
AFP (Unobligated, prior
FUND- FIN- year, Construction
APPROPRIATION TYPE PLAN B&R AMOUNT Project No.)
I REQUEST FUNDS TO BE CERTIFIED AND MADE AVAILABLE FOR WITHDRAWAL.
CERTIFIER: (Approved Signature Authority)
Kathleen Foley 903-0232 903-5850
AUTHORIZED REQUESTER PHONE NUMBER FAX NUMBER
CONTACT: (Budget Execution)
(for any problems)
Candy Benner 903-4431 903-1557
NAME (print) PHONE NUMBER FAX NUMBER
FUNDS ARE AVAILABLE AND HAVE BEEN RESERVED FOR IMMEDIATE
WITHDRAWAL.
DCS=
OHAO CERTIFIER DATE
fF Juswyoeny
weisolg Sulpun, [eo],
[eIoL AlosajeD Surpuny ¢
[eloy, odAT, a8ueyD N
uoneueldxq osueyD Jojoenuod d95JO
suoneiedg
qwuoW XX Jeo x
weisoig Sulpun,j <q suonoesuesy,
sasueyD Jo uoreurldxg jeroueuly
AsioUq Jo JuouNTedag sores pou
“LVANYOd FIdNVS--
STULUVA pop ux
“(NN) Way] oury
:odA, pun,y
‘OPTL pue [oquiAg uoneridoiddy
5 uauyoeny
:sye
We1301g SUIpUN, [eO],
[eioy, A1oSa}e> Surpuny ¢
[eo], odAT a8ueya N
JoyoeqUoZ s91JO
suoneisdo
uoneurydxq osuey.
qwuoW XX Jeox
vodoy siojsenuo_d suneisdyo soley;
sosueyD jo uoneueldxg [eroueury
A81ouq Jo Juounredag soyeig pop
uOoTONSUO? = Z
souBUaIUILY 27 SuNeiadyO = |
:A1089}e2 Suripun,y
sulmueizoiday jeursjuy = >
Jajsuell uonendoiddy = y
sulMUEIZ0lday = Y
Joyrend oinjny = 4
aAlosoy FO =d
Q[nejoq) [euLIoN = N
uonjedoiddy jeulj= g
fentuy = |
:adA J, o8uey
10] 94} Joy nua] umog doiq "ALON
MLAS x9pop uw
“(NN) Way] our]
ad L, pun.y
‘OPEL pue foquikg uoneudoiddy
ate |
Section 25
. » Ajayes TeajonN [eWIOIU] OHV sO 6ldV ¥ LISV AL
(L10€-€X) NLO WN
. Z9-WN ‘UsTTY Apopo ” Ajayes ajONN yeuoneuayuy IWA SO | O€WA ¥SINWA IWAIND/AL
SONN6E
(6861-9X) /PONN6E/E9
“SIIOAA TISAI NN6E/ZONNGE
/ (8@ZS9X) /IONN6£/09NN
. Z9-VN ‘OUe’] Supac ” uontsodsiq s[eLajey] o]Issi4 ONN SO | 6€/I9NN/OONN SN
(9P7Z9X) ‘UEP Ary
/ (8@ZS9X) uonesadooD pur uonsa}oig
» 79-VN ‘OuR’] OLIped " S[eLoe A Jes[onN ;euoneussjuy SNN SO OSNN SN
(9PZZ9X) ‘UNE Kay
/ (8@ZS9X) Ayunseg
- Z9-WN ‘our’y Supa ” euoHeUts\Uy pue uoNesayt}orduoN NN sO IPNN/OPNN SN
(LIO€EX) ZO-WN ‘UATTY
POT / (ZLLEX) uonesiadoos aN
» Z9-WN ‘BUOUIAI ayI\] » 3 Ayoyeg Jesjony feuoneusayuy €NN so TENN/OENN | IN/WN/SN
(LILL-9X) SUOS (9bZZ9X) ‘UE Kaj
I¢-aW / (8@ZS9X)
ydasor suey] 79-WN ‘oue'Ty oupazy PY LONRILAA 2 UoHeIaOIdUON Z7NN SO | OZNN6€/0Z7NN SN
(NN) WoReIaRjOITO JeIPNN Islas] JO] A0jCI sappy Ajndaq
. s a Jo~VaY UOHONPOIg MIN IdN dd dN6€/dN AL
(LLI¥-9X) SHOH
I¢-HIN
UOSIOpUY BIW] » » Ayunoag pue sprendayeg 7Sd da SA6€/07SA OL
O6LL-EX) NLD (l€vb-€X) NLO
Le-AIA ‘wueig uyor 79-WN ‘Jouuag Apues » Sone 2 oseg |eoruyoa], UI ssouIpeoy 6dd da 60d6£€/60dd OL
(LLI-9X) SUOA
I€-aW
uOosIapUy BI Z9-WN ‘A2]UQ AouRN . susiedues da dd 80dC6€/80dd OL
(06LL-€X) NLO
l€-AW ‘uueis uyor . » WOM aIdyo0I¢ payoaiq dd dd L0da OL
(LIO€-EX) NLD
» Z9-WN ‘USTTV Apoa|] » wreiso1g Jessy uoneuodsuely ainoag 9d dd 90dq OL
” » SINONSeIZU] PUL SANTPIIV VSNN Ida dd Oldd OL
(LLIP-9X) SUOA
I-AA (l€vb-€X) NLO onetdwery ‘g
uosiIOpuy BIA 79O-VN ‘Jouusg OD /Uequie’y */Ao]o.y Sy SODOTAIDY OIL] opuein one) IDD dd 99 99
(dq) 4g stayed 10; le RUAIpY Adeq —
(LILL-9X) SYOd
Ig-dW onetduely ‘g (SA Joud pue 1007 AA) LN
ydasor ey /uoquie’] “f/Aa]o,4 “yy uonsaliq weigoig INN so OINN /SN/AA/AL
(LLIP-9X) SUOd NL
I¢-dW 79-WN ‘SOy Lue], oneiduein “g (uonsaliq weidoig)
uosiapuy eA] / ueZOID sotuer /uoquie’y ‘[/Aa]0.3 “> JOWNSIUMUPY 2} JO dYJO ISN WN ZOSd/10Sd YIN/IV/GV
____C¥N) J0j8.ysTURUpY dq JO yO
yoeU0,) Jospng JUaId Day Jaaysy410 A [ebyjo sumoiddy ule.1s01g apo) apo U9 adAy, puny
O40 aod wayuod/jnduy datVy uostig | div ‘doiddy
H juowyorny
SJ9BJUOD pue sjePyjO suraoiddy (qqV) weaso1g Sujpung paaoiddy WSNN
(07L8-9X) SYOA
(p6ZE-EX) NLO
ueqy “d
fodseys ‘qd AYSIU ‘WW
Aayeg ‘S/MOVeH *S
Le-AW “Aq3re “f O1-AN ‘ueysea “W /USTO) “[/SOUlRIS “f (ULV) J0V0eeyY Isa], pooukapy cv YN | 90S0fVv/cosorv UN
0619-182 (702)
(€0€Z-9X) SUOH <AN-(H80) SUTT[OD “T 90fVv
1e-dW ‘Suom ‘Gd O9-UN ‘SUIIeD ‘d /SUITE) “d/SWRUTTA (NU S1O}OVOY [BABN UN /SOLV/IV6E UN
(UN) SIOpeAY [BABN IO; JOVeRSAPApY Andeq
uv
H Jusuyseny
DOE 0 412.1 Attachment !
7A.
7B.
10.
14,
U.S. DEPARTMENT OF ENERGY
Major Operating Contractor (MOC) Work Authorization
WORK AUTHORIZATION
A. PROJECT TITLE:
B. FIELD WORK PROPOSAL NO. (IF APPLICABLE):
HQ PROGRAM POINT OF CONTACT: NA-
Name Signature Org. Code Telephone No.
HQ PROGRAM POINT OF CONTACT: NA-
Name Signature Org. Code Telephone No.
HQ BUDGET POINT OF CONTACT: NA-62
Name Org. Code Telephone No.
RESPONSIBLE PROGRAM OFFICE:
RESPONSIBLE PROGRAM SECRETARIAL OFFICER:
RESPONSIBLE SITE/OPERATIONS OFFICE:
Office Contact Telephone No.
MOC CONTRACTOR NAME:
Office Contact Telephone No.
POINT OF CONTACT:
Name Telephone No.
WORK AUTHORIZATION NO: 9. REVISION:
ee
FUNDS HEREBY AUTHORIZED 11. PERFORMANCE PERIOD:
PRIOR
FY 2003. CHANGES FY 2003 12. WORK START DATE:
INITIAL TO YTD CURRENT REVISED
B&R No. AMOUNT DATE AMOUNT CHANGE AMOUNT 13. EXPECTED
COMPLETION DATE:
‘AL
STATEMENT OF WORK: SEE PAGE 2 (XX MONTH AFP)
Section 26
This section will be used to provide general guidance relating to the statement of work for NNSA Programs/projects. Page 2 will provide specific
guidance.
- Reporting Requirements: As required by DOE 0412.1, you will provide at a minimum one technical progress report, a final technical report at the
termination of the work assignment, and an annual report of costs incurred in relation to authorization funding. Currently, the financial reporting
requirement for the Management Analysis Reporting System (MARS) and the Financial Information Variance Reporting System (FIVRS) will support
Headquarters’ requirements for monitoring obligations and costs associated with this work authorization.
NAME and SIGNATURE ORG CODE DATE
. WORK AUTHORIZATION OFFICIAL: NA-
. SITE/OPERATIONS OFFICE OFFICIAL:
. MOC CONTRACTOR NAME:
Please return signed WORK AUTHORIZATION to NA-62 within 4 weeks of start date identified in Item 12.
Revision 00 Pg. 2
SPECIFIC GUIDANCE
14. STATEMENT OF WORK: (XX MONTH AFP)
(continued)
The statement of work shall include: (1) detailed statement of work to be performed or reference to a field work proposal; project plan, or similar
document that describes the scope of work; (2) milestones; (3) deliverables, including technical information as required by Order 241.1, SCIENTIFIC
AND TECHNICAL INFORMATION MANAGEMENT; and (4) performance measures/expectations. This section should also include reference to
relevant web pages, published reports, or written guidance, as applicable.
FOR CONSTRUCTION PROJECTS ONLY
REPORTING REQUIREMENTS:
Progress reports for project performance will be submitted to the appropriate NNSA Headquarters Office for cost, schedule, and scope in
accordance with current NNSA Project Management Policies and the approved Project Execution Plan (PEP). All variances from the approved
baseline cost, schedule, and Scope will be documented in the project performance report along with a mitigation strategy and corrective plan.
TEC TOTAL:
TPC TOTAL:
TPC WORK AUTHORIZATION HISTORY
WORK AUTHORIZATION APPROPRIATION
NUMBER B&R CODE
NUMBER O&M AMOUNT CONSTRUCTION AMOUNT
ES
:
8
8
8
g
8
8
8
8
HTT]
|
TOTAL TPC TO DATE:
Attachment J
NATIONAL NUCLEAR SECURITY ADMINISTRATION (NNSA)
WoRrK AUTHORIZATION (WA) SIGNATURE AUTHORITIES
PROGRAM HQ PROGRAM POC WA OFFICIALS [SIGNATURE BUDGET POC
PHONE No. AUTHORITY] PHONE No.
DEFENSE PROGRAMS _
PHONE No.
re
#£
(301) 903-8046
CAMPAIGNS
Primary Certification Kirk Levedahl, NA-113.2 James Van Fleet, NA-113 Paul Grimes, NA-62
(202) 586-1276 (202) 586-5782 (301) 903-4396
ALTERNATE Ken Kellar, NA-113.2
Dynamic Materials
Kirk Levedahl, NA-113.2
James Van Fleet, NA-113
Paul Grimes, NA-62
Col. Edward Schmidt, NA-121
(301) 903-9791
Properties (202) 586-1276 (202) 586-5782 (301) 903-4396
Advanced Radiography Kirk Levedahl, NA-113.2 James Van Fleet, NA-113 Paul Grimes, NA-62
(202) 586-1276 (202) 586-5782 (301) 903-4396
ALTERNATE Ken Kellar, NA-113.2
(301) 903-8046
Secondary Certification Chris Keane, NA-113.1 James Van Fleet, NA-113 Paul Grimes, NA-62
and Nuclear Systems (202) 586-0852 (202) 586-5782 (301) 903-4396
Margins
ALTERNATE Ralph Schneider, NA-113.1
(202) 586-0837
Enhanced Surety Robert A. Jones, NA-115.1 Diane Bird, NA-115 Paul Grimes, NA-62
[Joint] (301) 903-4236 (202) 586-0499 (301) 903-4396
Weapons Systems
Engineering Certification
ALTERNATE
Kevin Greenaugh, NA-115.3
(202) 586-2026
Bill Roy-Harrison, NA-115.3
(301) 903-5171
Diane Bird, NA-115
(202) 586-0499
Section 27
Paul Grimes, NA-62
(301) 903-4396
Nuclear Survivability
(Hostile Environments)
ALTERNATE
Chris Keane, NA-113.1
(202) 586-0852
Ted Luera, NA-113.1
(202) 586-6560
James Van Fleet, NA-113
(202) 586-5782
Paul Grimes, NA-62
(301) 903-4396
Enhanced Surveillance
[Joint]
Eric Cochran, NA-122
(301) 903-7330
Syed Zaidi, NA-115.2
(301) 903-3446
Martin Schoenbauer, NA-122
(301) 903-3489
Diane Bird, NA-115
(202) 586-0499
Paul Grimes, NA-62
(301) 903-4396
PROGRAM HQ PROGRAM POC WA OFFICIALS [SIGNATURE BUDGET POC
PHONE No. AUTHORITY] PHONE No.
PHONE No.
Advanced Design and Jeffrey Davis, NA-115 Roger Lewis, NA-12 Paul Grimes, NA-62
Production Technologies (202) 586-5280 (202) 586-6864 (301) 903-4396
(ADAPT) or
[Joint] Julianne Levings
(505) 845-6201
Inertial Confinement Chris Keane, NA-113.1 James Van Fleet, NA-113 Joanne Wolfe, NA-62
Fusion (ICF) and High (202) 586-0852 (202) 586-5782 (301) 903-6949
Yield
Richard Thorpe, NA-113.1
ALTERNATE (202) 586-3352
Inertial Confinement Becky Montoya, NA-10.2 Paul Ross, NA-10.2 Joanne Wolfe, NA-62
Fusion (ICF) and High (202) 586-4633 (202) 586-4027 (301) 903-6949
Yield —
NIF Demo and NIF OPC
Work Authorization
Advanced Simulation & Robert Meisner, NA-114 Dimitri Kusnezov, NA-114 Paul Grimes, NA-62
Computing (202) 586-0908 (202) 586-1800 (301) 903-4396
Advanced Simulation & Mike Thompson, NA-117 David H. Crandall, NA-11 Paul Grimes, NA-62
Computing — (301) 903-5427 (202) 586-0568 (301) 903-4396
Construction Projects
Joe Maguire, NA-16
(202) 586-7021
Pit Manufacturing and Tim Beville, NA-113.2 Jerry Freedman, NA-11 Terrie Vickers, NA-62
Certification (301) 903-8251 (202) 586-4761 (301) 903-2935
[Joint]
Michael Mitchell, NA-12
(301) 903-3085
Stockpile Readiness Marc Livesay Roger Lewis, NA-12 Donna Gezelle, NA-62
(865) 576-8211 (202) 586-6864 (301) 903-3677
High Explosives Doug Strack, NA-12 Roger Lewis, NA-12 Donna Gezelle, NA-62
Manufacturing and (202) 586-8938 (202) 586-6864 (301) 903-3677
Weapons Assembly/
Disassembly Readiness
PROGRAM
HQ PROGRAM POC
PHONE No.
WA OFFICIALS [SIGNATURE
AUTHORITY]
PHONE No.
BUDGET POC
PHONE No.
Nonnuclear Readiness
Gary Palmer, NA-12
(202) 586-5099
Roger Lewis, NA-12
(202) 586-6864
Donna Gezelle, NA-62
(301) 903-3677
Materials Readiness
Dana Krupa, NA-12
(202) 586-3842
Roger Lewis, NA-12
(202) 586-6864
Donna Gezelle, NA-62
(301) 903-3677
Tritium Readiness, CLWR | Dana Krupa, NA-12 Roger Lewis, NA-12 Donna Gezelle, NA-62
(202) 586-3842 (202) 586-6864 (301) 903-3677
Tritium Readiness, APT
Tritium Readiness Joel Leeman, NA-12 Xavier Ascanio, NA-124 Donna Gezelle, NA-62
Construction, CLWR (202) 586-2760 (301) 903-3757 (301) 903-3677
Tritium Readiness
Construction, APT
PROGRAM HQ PROGRAM POC WA OFFICIALS [SIGNATURE BUDGET POC
PHONE No. AUTHORITY] PHONE No.
PHONE No.
DIRECTED STOCKPILE
WORK
Stockpile Maintenance
Joseph Gazda, NA-122
(301) 903-2984
Marty Schoenbauer, NA-122
(301) 903-3489
Donna Gezelle, NA-62
(301) 903-3677
Use Control
Ray Ferry, NA-12
(301) 903-3988
David E. Beck, NA-12
(202) 586-4879
Donna Gezelle, NA-62
(301) 903-3677
Stockpile Evaluation
Joseph Gazda, NA-122
(301) 903-2984
Marty Schoenbauer, NA-122
(301) 903-3489
Donna Gezelle, NA-62
(301) 903-3677
Dismantlement/Disposal Joseph Gazda, NA-122 Marty Schoenbauer, NA-122 | Donna Gezelle, NA-62
(301) 903-2984 (301) 903-3489 (301) 903-3677
Field Engineering, Joseph Gazda, NA-122 Marty Schoenbauer, NA-122 | Donna Gezelle, NA-62
Training and Manuals
(301) 903-2984
Section 28
(301) 903-3489
(301) 903-3677
Production Support
Joseph Gazda, NA-122
(301) 903-2984
Marty Schoenbauer, NA-122
(301) 903-3489
Donna Gezelle, NA-62
(301) 903-3677
Stockpile Research and Maurice Pitt, NA-115.1 Diane Bird, NA-115 Donna Gezelle, NA-62
Development (202) 586-9369 (202) 586-0499 (301) 903-3677
SECURE Michael Connor, NA-15 Steven Hafner, NA-15 Donna Gezelle, NA-62
TRANSPORTATION ASSET (202) 586-1645 (505) 845-6692 (301) 903-3677
SAFEGUARDS AND
SECURITY
Field Security—Protective
Force, Protective Systems,
and Transportation
Winnie Lehman, NA-55
(301) 903-4104
Owen B. Johnson, NA-55
(202) 586-2153
(Alternate—Joseph Woods,
NA-551 (301) 903-5354)
Mike Cremona, NA-62
(301) 903-7726
Field Security— Timothy S. McCune, NA-55 Owen B. Johnson, NA-55 Joanne Wolfe, NA-62
Construction Projects (301) 903-5159 (202) 586-2153 (301) 903-6949
(LANL/LLNL/SNL)
Ray W. Buck, NA-55
(301) 903-9870
Field Security—Cyber William Hunteman, NA-55 Owen B. Johnson, NA-55 Mike Cremona, NA-62
Security (202) 586-4775 (202) 586-2153 (301) 903-7726
[Alternate—Joseph Woods,
NA-551 (301) 903-5354]
NNSA FACILITIES AND
INFRASTRUCTURE
RECAPITALIZATION
PROGRAM
Robert D. Herrera, NA-52
(202) 586-5366
Bruce Scott, NA-52
(202) 586-0992
Mike Cremona, NA-62
(301) 903-7726
PROGRAM HQ PROGRAM POC WA OFFICIALS (SIGNATURE BUDGET POC
PHONE No. AUTHORITY] PHONE No.
PHONE No.
READINESS IN TECHNICAL
BASE AND FACILITIES
RTBF)
RTBF — OPERATIONS | Mike Thompson, NA-117 David H. Crandall, NA-11 Terrie Vickers, NA-62
OF FACILITIES (301) 903-5427 (202) 586-0568 (301) 903-2935
Phil Pizzariello, NA-124
(301) 903-7736
Xavier Ascanio, NA-124
(301) 903-3757
Readiness in Technical
Base and Facilities (RTBF)
— Construction
Mike Thompson, NA-117
(301) 903-5427
Joel Leeman, NA-12
(202) 586-2760
David H. Crandall, NA-11
(202) 586-0568
Xavier Ascanio, NA-124
(301) 903-3757
Joanne Wolfe, NA-62
(301) 903-6949
RTBF Program Readiness
[Joint]
Mike Thompson, NA-117
(301) 903-5648
Phil Pizzariello, NA-124
(301) 903-7736
David H. Crandall, NA-11
(202) 586-0568
Xavier Ascanio, NA-124
(301) 903-3757
Terrie Vickers, NA-62
(301) 903-2935
RTBF—Special Projects
Mike Thompson, NA-117
(301) 903-5648
Phil Pizzariello, NA-124
(301) 903-7736
Doug Strack, NA-12
(202) 586-8938
David H. Crandall, NA-11
(202) 586-0568
Xavier Ascanio, NA-124
(301) 903-3757
Terrie Vickers, NA-62
(301) 903-2935
RTBF—Special Projects
Education/Critical Skills)
Beverly Berger, NA-113.4
(202) 586-2808
James Van Fleet, NA-113
(202) 586-5782
Terrie Vickers, NA-62
(301) 903-2935
RTBF—Material Recycle
& Recovery
Phil Pizzariello, NA-124
(301) 903-7736
Xavier Ascanio, NA-124
(301) 903-3757
Donna Gezelie, NA-62
(301) 903-3677
RTBF—Containers
Phil Pizzariello, NA-124
(301) 903-7736
Xavier Ascanio, NA-124
(301) 903-3757
Donna Gezelle, NA-62
(301) 903-3677
RTBF—Storage
Phil Pizzariello, NA-124
(301) 903-7736
Xavier Ascanio, NA-124
(301) 903-3757
Donna Gezelle, NA-62
(301) 903-3677
RTBF—Nuclear Weapons
Incident Response
Paul Evancoe, NA-40
(202) 586-6418
James Fairobent, NA-40
(202) 586-8759
Richard Arkin, NA-40
(202) 586-6418
Donna Gezelle, NA-62
(301) 903-3677
PROGRAM HQ PROGRAM POC WA OFFICIALS [SIGNATURE BUDGET POC
PHONE No. AUTHORITY] PHONE No.
PHONE No.
DEFENSE NUCLEAR
NONPROLIFERATION
Nonproliferation and
Verification R&D
Proliferation Detection
Nuclear Explosion
Monitoring
Chemical and Biological
National Security
Supporting Activities
Mike O’Connell, NA-22
(202) 586-9311
Section 29
Randy Bell, NA-22
(202) 586-8859
Leslie Casey, NA-22
(202) 586-2151
Beth George, NA-22
(202) 586-2041
Mike O’Connell, NA-22
(202) 586-9311
Mike O’Connell, NA-22
(202) 586-9311
Leslie Casey, NA-22
(202) 586-2151
Beth George, NA-22
(202) 586-2041
Mike O’Connell, NA-22
(202) 586-9311
Cedric Lane, NA-62
(202) 586-5228
International Nuclear
Safety and Cooperation
Soviet Designed Reactor Dennis Meyers, NA-23 Richard Reister, NA-23 Mike Cremona, NA-62
Safety (301) 903-1418 (301) 903-0234 (301) 903-7726
Technical Support
International Emergency
Cooperation
Ann Heinrich, NA-25
(202) 586-8165
Vince McClelland, NA-23
(202) 586-8045
Mike Cremona, NA-62
(301) 903-7726
Nuclear Safety Analyses
Corrective Measures &
Dennis Meyers, NA-23
(301) 903-1418
Richard Reister, NA-23
(301) 903-0234
Mike Cremona, NA-62
(301) 903-7726
Technical Support
Highly Enriched Janie Benton, NA-23 Edward Mastal, NA-23 Mike Cremona, NA-62
Uranium (HEU) (301) 903-7321 (301) 903-3197 (301) 903-7726
Transparency
Implementation Joe Glaser, NA-23
(301) 903-1459
PROGRAM
HQ PROGRAM POC
PHONE No.
WA OFFICIALS [SIGNATURE
AUTHORITY]
PHONE No.
BUDGET POC
PHONE No.
Elimination of Weapons
Grade Plutonium
Production in Russia
Seversk
Tim Haley, NA-23
(301) 903-3581
Doug Newton, NA-23
(301) 903-9504
Mike Cremona, NA-62
(301) 903-7726
Zheleznogorsk
Lowell Ely, NA-23
(301) 903-6821
Doug Newton, NA-23
(301) 903-9504
Mike Cremona, NA-62
(301) 903-7726
Technical Support
Tim Haley, NA-23
(301) 903-3581
Doug Newton, NA-23
(301) 903-9504
Mike Cremona, NA-62
(301) 903-7726
Plutonium Production
Reactor Safety
Jeff Roberson, NA-23
(301) 903-8026
Doug Newton, NA-23
(301) 903-9504
Mike Cremona, NA-62
(301) 903-7726
Russian Transition
Initiatives
Initiatives for Proliferation
Prevention (IPP)
Nuclear Cities Initiatives
(NCI)
Peter Green, NA-24
(202) 586-6439
Anne Phillips, NA-24
(202) 586-0938
George Pomeroy, NA-244
(202) 586-3506
Margo Mininni, NA-244
(202) 586-8690
Ann Starz, NA-244
(202) 586-6583
James Noble, NA-24
(202) 586-3921
Elly Melamed, NA-24
(202) 586-2216
Cedric Lane, NA-62
(202) 586-5228
PROGRAM
HQ PROGRAM POC
PHONE No.
WA OFFICIALS [SIGNATURE
AUTHORITY]
PHONE No.
BUDGET POC
PHONE No.
Nonproliferation and
International Security
Nonproliferation Policy
International Safeguards
Export Control
Treaties and Agreements
Stephanie Clarke, NA-24
(202) 586-2102
Scott Davis, NA-241
(202) 586-1337
Kurt Siemon, NA-241
(202) 586-2611
Jon Phillips, NA-241
(202) 586-8901
Jim Busse, NA-243
(202) 586-1700
Phil Robinson, NA-243
(202) 586-6184
Bill O’Connor, NA-243
(202) 586-4867
Rich Goorevich, NA-242
(202) 586-0589
Anatoli Welihozkiy, NA-242
(202) 586-2155
Todd Perry, NA-242
(202) 586-1725
Camille Jagessar, NA-24
(202) 586-8437
Steve Black, NA-24
(202) 586-2102
Tricia Dedik, NA-241
(202) 586-2100
Ron Cherry, NA-243
(202) 586-0269
Adam Scheinman, NA-242
(202) 586-8495
Steve Black, NA-244
(202) 586-3624
Cedric Lane, NA-62
(202) 586-5228
PROGRAM
HQ PROGRAM POC
PHONE No.
WA OFFICIALS [SIGNATURE
AUTHORITY]
PHONE No.
BUDGET POC
PHONE No.
International Nuclear
Materials Protection and
Cooperation
Navy Complex
Strategic Rocket Forces
Minatom Weapons
Complex
Civilian Nuclear Sites
Material Consolidation and
Conversion
Radiological Dispersion
Devices
National Programs and
Sustainability
Second Line of Defense
Nuclear Assessment
Program
Bruce Pentola, NA-25
(202) 586-7467
Bruce Pentola, NA-25
(202) 586-7467
Section 30
Greg Slovik, NA-25
(202) 586-0032
Tom Wander, NA-25
(202) 586-3804
Tom Wander, NA-25
(202) 586-3804
Ioanna Iliopulos, NA-25
(202) 586-1881
Charles Bolton, NA-25
(202) 586-4917
David Martin, NA-25
(202) 586-1099
Greg Haugan, NA-25
(202) 586-0747
Bruce Slawter, NA-25
(202) 586-8273
Bruce Slawter, NA-25
(202) 586-8273
Greg Slovik, NA-25
(202) 586-0032
Tom Wander, NA-25
(202) 586-3804
Tom Wander, NA-25
(202) 586-3804
Garry Tittemore, NA-25
(202) 586-4917
John Boyd, NA-25
(202) 586-2143
Tracy Mustin, NA-25
(202) 586-2676
Greg Haugan, NA-25
(202) 586-0747
Cedric Lane, NA-62
(202) 586-5228
PROGRAM
HQ PROGRAM POC
PHONE No.
WA OFFICIALS [SIGNATURE
AUTHORITY]
PHONE No.
BUDGET POC
PHONE No.
Fissile Materials
Disposition
Reactor-Based
Technologies
(NN6001030)
Pit Disassembly &
Conversion (NN6001010)
Materials and
Immobilization
(NN6001020)
U.S. Uranium Disposition
(NN6002000)
Supporting Activities
Storage (NN6003013)
NEPA (NN6003020)
M&I (NN6003030)
Russian Plutonium
Disposition (NN6101)
Support and Oversight in
the U.S. (NN6103)
Advanced Reactor
Headquarters Program
Direction
Patrick Rhoads, NA-261
(202) 586-7859
James V. Johnson, NA-261
(202) 586-5690
Ronald E. Collins, NA-262
(202) 586-4700
Joe Bozik, NA-262
(202) 586-9715
Dean Tousley, NA-261
(202) 586-0217
Paul Gibson, NA-26
(202) 586-0928
Hitesh Nigam, NA-265
(202) 586-0750
Guy Lunsford, NA-265
(202) 586-1544
Joe Bozik, NA-262
(202) 586-9715
Phil Roebuck, NA-263
(202) 586-3133
Phil Roebuck, NA-263
(202) 586-3133
Peter Karcz, NA-263
202) 586-0488
Kathleen Foley, NA-62
(301) 903-0232
Dave Nulton, NA-261
(202) 586-4513
Andre Cygelman, NA-262
(202) 586-8814
Andre Cygelman, NA-262
(202) 586-8814
Dave Nulton, NA-261
(202) 586-4513
Ken Bromberg, NA-265
(202) 586-6232
“
John Baker, NA-263
(202) 586-7493
John Baker, NA-263
(202) 586-7493
James Lacy, NA-264
(202) 586-1286
John Baker, NA-263
202) 586-7493
ichael C. Kane, NA-60
(202) 586-5753
Mike Cremona, NA-62
(301) 903-7726
John Trainor, NA-62
(301) 903-2935
Field Program Direction
Kathleen Foley, NA-62
(301) 903-0232
Michael C. Kane, NA-60
(202) 586-5753
John Trainor, NA-62
(301) 903-2935
10
Attachment K
DOE F 1325.8
(08-93)
United States Government Department of Energy
memorandum
pate: October 24, 2002 -- SAMPLE --
REPLY TO
ATTNOF: NA-62: (Budget Execution Person)
SUBJECT: FY 2003 Defense Programs Work Authorizations
TO: Director, Budget and Resources Management Division, Albuquerque Operations Office
Director, Budget Division, Chicago Operations Office
Manager, Kansas City Site Office
Manager, Livermore Site Office
Manager, Los Alamos Site Office
Director, Budget and Resources Management Division, Nevada Operations Office
Director, Budget Division, Oakland Operations Office
Site Manager, Oak Ridge National Laboratory
Financial Manager, Office of Scientific and Technical Information
Manager, Pantex Site Office
Director, Budget Division, Richland Operations Office
Manager, Sandia Site Office
Manager, Savannah River Site Office
Attached are work authorizations that support funding provided in the FY 2003 October
Approved Funding Program (AFP). Authorization is given for funding provided for (B&R
Title).
The authority to obligate the funds identified in the work authorizations is restricted to
amounts allotted by the Department. Specific programmatic guidance will be provided
following enactment and allocation of the FY 2003 appropriation.
Section 31
Please ensure that the appropriate personnel at your operations office receive a copy of the
attached work authorizations and that signature blocks #17 and #18 are completed in a timely
fashion so that the operating officials are immediately aware of the scope of work to be
accomplished. A copy of the signed statements should be provided to NA-62 by
November 21, 2002, to confirm that the work authorizations have been received by the
operating officials.
If you need additional information or have questions, please contact Judy Simon
(301-903-5166).
Kathleen Y. Foley
Office of Planning, Programming, Budgeting
and Evaluation
National Nuclear Security Administration
Attachments
cc w/attachments:
Would go to NNSA Service Center or NNSA Site/non-NNSA Operations Budget Office
Contact (they process Work Authorizations and forward to Contractor if appropriate)
Go to Contractors Budget Office Contact (they would get Work Authorizations only for each
site, example LANL Budget Office would only get LANL Work Authorizations, etc.)
Can also provide a copy of Work Authorizations to Contractor Program Contact (this should
only be a few people, not everyone involved)