BOP-001.332, PPBE Reprogramming/Appropriation Transfer/Notification Process
To establish roles and responsibilities for reprogramming actions, appropriation transfers, and notifications, as needed, using the PPBE process for the execution of the National Nuclear Security Administration (NNSA) budget.
Version history and related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
http://hq.na.gov Office of Financial Management
Business Operating Procedure
Approved: 02-15-08
Update: 11-08-11
PPBE
REPROGRAMMING/APPROPRIATION
TRANSFER/NOTIFICATION PROCESS
NATIONAL NUCLEAR SECURITY ADMINISTRATION
Office of Financial Management
BOP-001.332
BOP-001.332 1
11-08-11
PPBE REPROGRAMMING/APPROPRIATION TRANSFER/NOTIFICATION
PROCESS
1. PURPOSE. To establish roles and responsibilities for reprogramming actions,
appropriation transfers, and notifications, as needed, using the PPBE process for the
execution of the National Nuclear Security Administration (NNSA) budget.
2. CANCELLATIONS. None.
3. APPLICABILITY. The provisions of this policy apply to all NNSA organizational
elements.
4. BACKGROUND. During the budget execution phase, unforeseen events or conditions
may necessitate changes to the program baselines that formed the basis for funding
appropriated by Congress. These changes must be communicated to the cognizant
Congressional committees as they occur. Processes designed to address these changes
include reprogrammings, appropriation transfers, and notifications. Overall guidance for
these actions is included in reports from the cognizant Congressional appropriations and
authorization committees. The DOE process is owned by the DOE and codified in DOE
Order 135.1A, Budget Execution Funds Distribution and Control.
5. REQUIREMENTS.
a. A reprogramming is required for any departure from a program, project, or
activity described in the agency’s budget justification as presented to and
approved by the Congress. This includes, but is not limited to, the utilization of
funds for purposes other than those considered by the Congress during
appropriation action such as:
(1) Any change to the obligational control levels in the Congressional reports
accompanying the authorization or appropriation (as reflected in the DOE
Base Table);
(2) Any significant programmatic change to the narrative in the President’s
Budget Request, Congressional testimony (including questions and
answers submitted for the record), and areas known to be of Congressional
interest.
2 BOP-001.332
11-08-11
Reprogrammings are to be pursued only after all other options have been
considered. Single site/source reprogrammings are encouraged. Multi-site and/or
multi-program solutions are to be pursued only after explicit concurrence by the
NNSA Principal Deputy Administrator, as to need, programmatic priority, or
emergent requirement.
b. The NNSA currently has two processes for handling reprogramming actions; one
for external Congressional actions that require approval from the cognizant
committees before execution, and one for limited/internal reprogramming which
are accomplished via the authority provided in the appropriations report, executed
through the financial system, and for which Congressional notification are
provided after the fact. The process flow for limited/internal reprogrammings is
depicted in Attachment 1; for external reprogrammings in Attachment 2.
(1) Currently, limited/internal reprogramming authority has been provided for
selected activities within the Weapons Activities Appropriation. This
authority is delineated in the appropriations reports accompanying the
annual appropriations act.
(a) Limited reprogramming authority allows for funding to be moved
between activities within a reprogramming threshold without
Section 2
submitting a reprogramming request for advance approval from
the House and Senate Committees on Appropriations.
(b) Internal reprogramming authority allows for a transfer of up to
$5,000,000 between reprogramming thresholds subject to the
following limitations: only one transfer may be made to or from
any program or project; the transfer must be necessary to address a
risk to health, safety or the environment; and funds may not be
used for an item for which Congress has specifically denied funds
or for a new program or project that has not been authorized by
Congress.
(2) Congressional notification within 15 days of the use of the limited/internal
reprogramming authority is required.
(3) Both external and limited/internal reprogramming packages must contain
the following:
(a) A cover letter from the Associate Administrator for Management
and Budget (NA-MB-1) to the NNSA Principal Deputy
Administrator summarizing the action;
BOP-001.332 3
11-08-11
(b) A cover letter from the NNSA Principal Deputy Administrator to
the DOE Chief Financial Officer (CFO) summarizing the action
and requesting that the letters be signed and transmitted to
Congress;
(c) Letters to appropriate authorization and appropriation committees;
(d) An attachment showing the proposed dollar changes by
reprogramming threshold;
(e) An attachment providing additional details on the proposed
reprogramming action; and
(f) NNSA must also provide the Office of Budget certifications of
funds availability, and format 5160 (Attachment 4).
NOTE: External reprogramming packages must also contain a cover letter
from the DOE CFO to the Secretary of Energy summarizing the action and
requesting approval and signature of the letters to Congress. Attachment 3
includes a template for reprogramming packages.
c. An appropriation transfer is the permanent withdrawal of budget authority or
balances from one appropriation account for credit to another appropriation
account. An appropriation transfer can be made only when authority to do so is
specifically provided in an appropriation or other act. Currently, there is a 5
percent transfer authority limitation for DOE accounts. Like external
reprogrammings, appropriation transfers require approval from the cognizant
Congressional committees before execution.
d. Notification can be used when a change to the approved budget would not require
an external reprogramming, limited/internal reprogramming, or an appropriation
transfer, but may be of known Congressional interest. To keep the appropriate
committees promptly and fully informed, NNSA would notify the appropriate
committees through either formal written correspondence or informal discussions
with the committee. Notifications normally do not require approval prior to
execution.
Congressional Notification may also be required to comply with requirements
specified in Congressional language. For example, 50 U.S.C. § 2746 addresses
notification requirements for conceptual design and construction design above
certain dollar thresholds. In addition, House Report 108-554 accompanying the
Energy and Water Development Appropriations Act, 2005, directs the Department
4 BOP-001.332
11-08-11
to notify, in writing, the House and Senate Appropriations Committee
immediately when there is a projected increase of 10 percent or more in the total
estimated cost (TEC) for all line-item construction projects with a TEC in excess
of $20 million.
Section 3
6. RESPONSIBILITIES.
a. The Principal Deputy Administrator, NNSA, is responsible for:
(1) Approving and transmitting all reprogramming and appropriation transfer
requests, and notification letters to the CFO;
(2) Generating discussion at monthly management council meetings on
upcoming reprogramming needs and status of packages in process, and
(3) Reviewing the effectiveness of the reprogramming processes and programs
(along with lessons-learned) will be a regular agenda item twice per year,
in February and August.
b. The Director, Office of Financial Management (NA-MB-30) is responsible for:
(1) Managing the overall PPBE Budget Execution process, which includes
any reprogramming, appropriation transfer, or notifications;
(2) Interpreting Congressional reports to understand reprogramming
thresholds and notification requirements, and transmitting that information
to Program and Site Offices;
(3) Assessing reprogramming/appropriation transfer or notification
requirements identified by line managers to assure they are executable
within available resources and are consistent with Congressional
guidelines; ensures that reprogramming actions is an appropriate use of
funds and a higher priority than other unfunded requirements;
(4) Serving as staff to the Administrator in analyzing optimum strategy,
including those that span more than one NNSA organization;
(5) Working with program offices to identify funding sources;
(6) Working with CFO to make appropriate Approved Financial Plan (AFP)
changes, including moving funding sources to DOE reserve for external
reprogrammings;
BOP-001.332 5
11-08-11
(7) Preparing and processing of all documents including reprogramming or
appropriation transfer letters, notification letters, emergency allotment
requests, and related work authorizations;
(8) Coordinating reprogramming/appropriation transfer/notifications within
NNSA, and with the DOE CFO;
(9) Preparing and updating the Reprogramming status report; tracks
reprogramming actions through OMB and Congressional approvals; and
(10) Keeping this reprogramming/appropriation transfer/notification process
Business Operating Policy (BOP) and other process instructions current,
and maintaining them on the NNSA PPBE intranet at
http://hq.na.gov/ppbe.
c. Headquarters Elements (Defense Programs, Defense Nuclear Nonproliferation,
Naval Reactors, Nuclear Counterterrorism Incident Response, Defense Nuclear
Security, Cyber Security, and Management and Budget) are responsible for:
(1) Identifying need for reprogramming or appropriation transfer or
notification to support a change to a program’s approved baseline;
(2) Formally transmitting complete reprogramming request to NA-MB-30
under the program manager’s signature;
(3) Working with NA-MB-30 to identify funding sources and develop
reprogramming/ appropriation transfer package;
(4) Briefing Congressional staff, if required; and the Office of PPBE and
NNSA Congressional Affairs; and
(5) Providing input to NA-MB-30 for work authorizations for
reprogrammed/transferred funds.
d. Other NNSA Entities.
(1) Site Offices are responsible for working with program offices to
identify and justify needs for reprogramming/appropriation transfer
and to formally submit complete reprogramming requests under the
site manager’s signature.
http://hq.na.gov/
6
(2)
(3)
BOP-00 1.332
11-08-11
Albuquerque Complex is responsible for certifying
reprogramming/appropriation transfer source funds available for
withdrawal to DOE reserve as directed by NA-MB-30.
Section 4
Office of Congressional Affairs hand carries
reprogramming/appropriation transfer/notification letters to cognizant
Congressional committees; arranges briefings with Congressional
staff, if required; receives official approval letters from Congress and
advises NA-MB-30 when all approvals have been received.
7. REFERENCES. Department of Energy (DOE) Order 135.1A, Budget Execution Funds
Distribution and Control; DOE M 135.1-lA, Budget Execution-Funds Distribution and
Control Manual; Atomic Energy Defense Act (50 U.S.C. 2745).
8. CONTACT. The NNSA, Office of Financial Management, NA-MB-30, 202-586-1087.
KENNETH W. POWERS
Associate Administrator
for Management and Budget
Attachment 1. NNSA Reprogramming Flow- Limited/lntemal
Attachment 2. NNSA Reprogramming Flow- Congressional
Attachment 3. Sample Memos Required For External Reprogrammings
Attachment 4. Proposed Reprogrammings, Restructurings, and Appropriation Transfers
BOP-001.332 Attachment 1
11-08-11 Page 1
CFO Signs
Letters to Congress
(within 15 days)
NNSA Reprogramming Flow – Limited/Internal
Yes
Issue Analysis –
Program and
Financial
Determine Internal,
Limited or Congressional;
Identify Funding Sources;
Develop Reprogramming
Package
Identified
Funding
Need
No Return
n
To
Requestor
At Field
Or HQ
Lead: Program Office
Support: NA - MB-30 Lead: Program Office Lead: NA - MB-30
Support: Programs
Programs
Coordination and
Comment Resolution Coordination:
Programs, NA
GC & CI, DOE
CFO, & OMB Approval/Signature:
NA
A
- 1
Decision
To
Reprogram
Lead: NA -MB-30 62
Lead: NA-EA-10I
Support: Programs, NA—MB- 30 -
Briefings to Hill staff
(rarely required) Funding/Work
Authorization
provided to field to
address identified
issue
If Internal or Limited,
Limited,
proceed as follows:
BOP-001.332 Attachment 2
11-08-11 Page 1
Letters to Congress
NNSA Reprogramming Flow - Congressional
Yes
Issue Analysis –
Program and
Financial
Determine Internal,
Limited or Congressional;
Identify Funding Sources;
Develop Reprogramming
Package
Identified
Funding
Need
NoReturn
To
Requestor
At Field
Or HQ
Lead: NNSA Program Office
Support: NA-62 Lead: NNSA Program Office Lead: NA-62
Support: NNSA Programs
Coordination and
Comment ResolutionCoordination:
Programs, NA
GC & CI, DOE
CFO, & OMB Approval/Signature:
NA-1; CFO
Decision
To
Reprogram
Lead: NA-62
Lead: NNSA CI
Support: NNSA Programs, NA-62
Briefings to Hill staff
Approvals
provided to CFOReapportionment
and allotment
thru AFP
Funding/Work
Authorization
provided to field to
address identified
issue
If Congressional, proceed
as follows. If Internal or
Limited, see Attachment A.
BOP-001.332 Attachment 3
11-08-11 Page 1
Required for External Reprogrammings/Appropriation Transfers Only
MEMORANDUM FOR THE SECRETARY
FROM: CHIEF FINANCIAL OFFICER
SUBJECT: ACTION: Approve Transmittal of Letters to Congress Notifying
them of the National Nuclear Security Administration’s (NNSA)
Intent to Reprogram $XXX within the __________Appropriation
ISSUE: The attached letters notify Congress of the National Nuclear
Security Administration’s intent to reprogram $XXX with the
___________appropriation to…
The action is necessary to…
Funding sources for this action is available...impact or lack of
impact should be discussed.
SENSITIVITIES: List any political sensitivity
RECOMMENDATION: Approve Congressional Reprogramming letters.
Section 5
CONCURRENCES: Congressional and Intergovernmental Affairs
General Counsel
Office of Management and Budget
Approve: _______________________________________
Disapprove: _______________________________________
Date: _______________________________________
Attachments
Attachment 3 BOP-001.332
Page 2 11-08-11
MEMORANDUM FOR: CHIEF FINANCIAL OFFICER
FROM: NNSA ADMINISTRATOR
SUBJECT: ACTION: Letters to Congress Notifying Them of the National
Nuclear Security Administration’s Intent to Reprogram
$XXX within the ________________Appropriation
The attached letters have been drafted to notify Congress of the
National Nuclear Security Administration's intent to reprogram
$XXX within the __________appropriation to...
This reprogramming is necessary to support…
Funding sources for this action is available...impact or lack of
impact should be discussed.
SENSITIVITIES: List any political sensitivities
RECOMMENDATION: It is requested that you sign and transmit the Congressional
Notification letters.
Attachments
BOP-001.332 Attachment 3
11-08-11 Page 3
MEMORANDUM FOR: NNSA PRINCIPAL DEPUTY ADMINISTRATOR
FROM: ASSOCIATE ADMINISTRATOR
FOR MANAGEMENT AND BUDGET
SUBJECT: ACTION: Letters to Congress Notifying Them of the National
Nuclear Security Administration’s Intent to Reprogram
$XXX within the ________________Appropriation
The attached letters have been drafted to notify Congress of the
National Nuclear Security Administration's intent to reprogram
$XXX within the __________appropriation to...
This reprogramming is necessary to support…
Funding sources for this action is available...impact or lack of
impact should be discussed.
SENSITIVITIES: List any political sensitivity
RECOMMENDATION: Your concurrence is requested on this package
Attachments
Attachment 3 BOP-001.332
Page 4 11-08-11
The Honorable (name)
Chairman, Committee on Armed Services
United States Senate
Washington, D.C. 20510
Dear Mr. Chairman:
For regular reprogramming requests:
The purpose of this letter is to notify you of the National Nuclear Security Administration intent
to reprogram $XXX within the ___________ appropriation from program X to program Y for...
For internal or limited reprogramming actions:
This letter is to notify you of the National Nuclear Security Administration’s use of internal
reprogramming authority as provided by Conference Report XXX accompanying the Energy and
Water Development Appropriation Act, FY XXXX (P.L. XXXX). Within the Weapons
Activities appropriation, $ was realigned from X program to program Y for…
For appropriation transfer requests:
The purpose of this letter is to transmit, pursuant to (insert applicable P.L. citation), a
Department of energy proposal for an appropriation transfer of $ from Appropriation X to
Appropriation Y.
This reprogramming is necessary to support…
Funding sources are available…Further details on this transaction, including a summary of
changes and justification on the requirements and sources, are included in Enclosure 1.
Should you have any questions or need additional information concerning this reprogramming,
please have your staff contact list contact in the Office of Congressional and Intergovernmental
Affairs at phone number, or list contact of the External Coordination Staff in the Office of the
Chief Financial Officer at phone number.
Sincerely,
Chief Financial Officer
Enclosures
cc: The Honorable
Section 6
Ranking Member
BOP-001.332 Attachment 3
11-08-11 Page 5
The Honorable (name)
Chairman, Committee on Armed Services
U. S. House of Representatives
Washington, D.C. 20515
Dear Mr. Chairman:
Note: All four letters are the same with the exception of the last paragraph, which provides
contact information. This contact information varies between the Committees on Armed
Services and the Committees on Appropriations.
Should you have any questions or need additional information concerning this reprogramming,
please have your staff contact list contact in the Office of Congressional and Intergovernmental
Affairs at phone number, or list contact of the External Coordination Staff in the Office of the
Chief Financial Officer at phone number.
Sincerely,
Chief Financial Officer
Enclosures
cc: The Honorable
Ranking Member
Attachment 3 BOP-001.332
Page 6 11-08-11
The Honorable (name)
Chairman, Committee on Appropriations
United States Senate
Washington, D.C. 20510
Dear Mr. Chairman:
Note: All four letters are the same with the exception of the last paragraph, which provides
contact information. This contact information varies between the Committees on Armed
Services and the Committees on Appropriations.
Should you have any questions or need additional information concerning this reprogramming,
please contact list contact of the External Coordination Staff in the Office of the Chief Financial
Officer at phone number.
Sincerely,
Chief Financial Officer
Enclosures
cc: The Honorable
Ranking Member
BOP-001.332 Attachment 3
11-08-11 Page 7
The Honorable (name)
Chairman, Committee on Appropriations
U. S. House of Representatives
Washington, D.C. 20515
Dear Mr. Chairman:
Note: All four letters are the same with the exception of the last paragraph, which provides
contact information. This contact information varies between the Committees on Armed
Services and the Committees on Appropriations.
Should you have any questions or need additional information concerning this reprogramming,
please contact list contact of the External Coordination Staff in the Office of the Chief Financial
Officer at phone number.
Sincerely,
Chief Financial Officer
Enclosures
cc: The Honorable
Ranking Member
Attachment 3 BOP-001.332
Page 8 11-08-11
This letter is only applicable if it is an Appropriation Transfer.
This is not required for a Reprogramming or a Congressional Notification.
The Honorable (name)
Chairman, Subcommittee on Energy
and Water Development, and Related Agencies
Committee on Appropriations
U.S. House of Representatives
Washington, D.C. 20515
Dear Mr. Chairman:
Note: All four letters are the same with the exception of the last paragraph, which provides
contact information. This contact information varies between the Committees on Armed
Services and the Committees on Appropriations.
Should you have any questions or need additional information concerning this reprogramming,
please have your staff contact list contact of the External Coordination Staff in the Office of the
Chief Financial Officer at phone number.
Sincerely,
Chief Financial Officer
Enclosures
cc: The Honorable
Ranking Member
BOP-001.332 Attachment 3
11-08-11 Page 9
This letter is only applicable if it is an Appropriation Transfer.
This is not required for a Reprogramming or a Congressional Notification.
The Honorable (name)
Chairman, Subcommittee on Energy and Water Development
Section 7
Committee on Appropriations
United States Senate
Washington, D.C. 20510
Dear Mr. Chairman:
Note: All four letters are the same with the exception of the last paragraph, which provides
contact information. This contact information varies between the Committees on Armed
Services and the Committees on Appropriations.
Should you have any questions or need additional information concerning this reprogramming,
please contact list contact of the External Coordination Staff in the Office of the Chief Financial
Officer at phone number.
Sincerely,
Chief Financial Officer
Enclosures
cc: The Honorable
Ranking Member
Attachment 3 BOP-001.332
Page 10 11-08-11
Distribution:
1bcc: Official File Copy (subject)
1bcc: Originator, NA-MB-30
1bcc: Cognizant Budget Execution Analyst, NA-MB-31
IDRMS #2008-
NA-MB-30 Correspondence Reviewer: _____________________________
NA-MB-1 Correspondence Reviewer: _____________________________
NA-MB-30 Originator
NA-MB-30 NA- MB-31 NA-MB-30 NA-MB-1
Initiator Director, Director, PPBE Deputy Assoc. Admin.
Defense Programs & Office of Financial for M&B
& Nuclear Management
Nonproliferation
_______ _______ _______ _______
Date Date Date Date
NA-MB-1 NA-XX NA/CI NNSA
Assoc. Admin. Program Principal Principal Deputy
for M&B Administrator
_______ _______ _______ _______
Date Date Date Date
NNSA
Administrator
_______
Date
BOP-001.332 Attachment 4
11-08-11 Page 1
PROPOSED REPROGRAMMINGS, RESTRUCTURINGS, AND
APPROPRIATION TRANSFERS
Format 5160 (Internal DOE Document)
CHAPTER II. U.S. Department of Energy
Detailed Reprogramming, Restructuring, and Appropriation Transfer Worksheet
(whole dollars)
1. Date:
2. DOE Serial Number:
3. Type of Action: 4. Program Point of Contact:
5. Appropriation Title & Symbol: 6. Budget Office Point of Contact:
7. Budget Analysis Division Teal Lead Concurrence Date:
8. Program Title
9. AFP
Recipient
Code
10. B&R Code
11.
Fund
Type
12. Total
Obligational
Authority
Proposed Change
15. Revised
Obligational
Authority
13. New
Obligational
Authority
14. Prior Year
Balances
Program Requirements:
1.TOTAL, PROGRAM REQUIREMENTS
Sources:
16. Non-add PY balances detail
Appropriation Year
2.TOTAL, SOURCE OF FUNDS
17. Footnotes:
18. Description of Proposed Action: