BOP-001.4 Rev. 3, NNSA PPBE Evaluation Process (Revision 3)
To institutionalize an annual NNSA PPBE Evaluation process to ensure that the NNSA achieves and articulates results by establishing clear, concise, meaningful, and measurable performance baselines, and by conducting credible reviews to compare results against these baselines
Supersedes:
Canceled By:
BOP-001.4, PPBE Evaluation Process on Oct 05, 2012
Version history and related documents
Supersedes
Earlier documents this one replaced.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
National ~ u c l e ~ ~ ~ u r l ~ ~ d m f n f s t r a t f o n
NNSA Policy Letter: BOP-001.4 Rev 3
Policy Issued: April 9,2003
Last Updated: April 4,2006
TITLE: NNSA PPBE Evaluation Process (Revision 3)
OBJECTIVE:
To institutionalize an annual National Nuclear Security Administration (NNSA) Planning,
Programming, Budgeting, and Evaluation (PPBE) Evaluation process to ensure that the NNSA
achieves and articulates results by establishing clear, concise, meaningful, and measurable
performance baselines, and by conducting credible reviews to compare results against these
baselines.
APPLICABILITY:
This policy applies to all NNSA programs (GPRA units)' and includes the evaluation activities
associated with PPBE. This policy does not include evaluation activities associated with the
management of capital assets (DOE 0 41 3.3) or contractor performance evaluation plans.
BACKGROUND:
Government Performance and Results Act of 1993 (GPRA): Congress requires Federal
programs to strengthen program management, effectiveness, and accountability by
focusing on results. Programs must develop strategic plans to set long-term goals, write
annual plans to set short-term targets towards achieving long-term goals, and submit
annual reports on actual results compared to targets. These measurable and credible
long-term goals, short-term targets, and annual results are required to improve budget
decisions.
President's Manasement Aaenda (PMA): The PMA Budget and Performance
Integration (BPI) initiative reinforces GPRA and strives to make government more
accountable to the public by requiring Federal programs to justify their budget requests
by integrating budget and performance data using terms that are clear and meaningful to
the public.
Program Assessment Rating Tool (PART): The Office of Management and Budget
(OMB) created PART to assess how well programs are achieving PMA and GPRA
objectives by evaluating the quality, clarity, and completeness of performance data and
results.
Department of Eneray (DOE) Performance Reports: The DOE requires programs to
provide quarterly reports on the progress made towards achieving annual targets.
These reports provide senior managers with early warning and corrective actions if an
annual target is at risk of being missed.
The NNSA PPBE Evaluation process includes:
Performance Measures
Performance Reviews
Performance Cascade.
' NNSA programs (GPRA Units) are one of the approximately 20 individual NNSA elements that appear separately in
the budget (e.g., Directed Stockpile Work)
1
PERFORMANCE MEASURES
Performance measures explain what a program expects to accomplish for a fixed funding profile
over a specific time period. This data links resources to results and is used to inform resource
decisions, justify budget requests, improve delivery of products and services, and hold program
managers accountable for results. NNSA has established common terms to improve internal
communications and integrated criteria to create a single set of performance data.
Section 2
Common Terms
Performance Measures: A generic term that refers to external corporate performance
data; includes the goal, indicators, endpoint targets, and annual targets.
Goal: A clear, concise, meaningful, ambitious, and long-term outcome statement that
describes the unique contribution the program makes towards achieving the DOE
mission.
Indicators: A set of generic but meaningful units by which progress towards the goal is
measured. Indicators should use common qualifiers (e.g., "annual" or "cumulative") to
clarify the unit of measure.
Endpoint Tarnets: Long-term objectives that are critical steps towards achieving the
goal. Each goal should have 340-5 endpoint targets written in specific numerical units
that can be measured and must include the projected fiscal year that the objective is to
be completed. Endpoint targets may be completed before the goal is reached.
Annual Tarciets: Specific and auditable annual outcomes and outputs2 towards
achieving the endpoint target measured in the same indicator units as the endpoint
target. Annual targets should be a single number per year and must be linked to and
substantiated by technical milestones.
Milestones: Generic term that refers to key internal technical performance data that is
required to meet program criteria. Milestones are meaningful to subject matter experts
to oversee day-to-day operations aimed at achieving annual targets. Milestones are in
validated program baselines, one, two, and three levels of detail below the annual
targets, and are contained in published program documentation. They are incorporated
into Work Authorizations, Project Work Plans, Program Plans, Implementation Plans,
Execution Plans, Personnel Appraisals, and Contractor Performance Evaluation Plans.
Integrated Criteria
Measure things that are meaningful to achieve long-term outcomes - not just things that
are easy to measure.
Use terms that are clear, concise, and meaningful to the public - do not use acronyms or
technical jargon.
Each program must have only one goal that is one-sentence in length.
Endpoint-annual-target sets must be in terms that measure progress over time towards
achieving the goal.
Outcome measures should be used in place of output measures whenever possible and
input measures should not be used.
0 One endpoint-annual-target set must be an efficiency measure that meets OMB
standards to measure output produced per input consumed.
0 Guidance for updating performance measures will be included in the annual "NNSA Call
for Budget Information" issued in June.
- -
* Outcome measures are end states (often outside the programs control) that the program is attempting to affect.
Outcomes are the things that the public cares about. Output measures are the goods and services a program
~roduces to affect the outcome. Inputs are the resources that programs consume to produce outputs and outcomes.
Outcome measures are end states (often outside the programs control) that the program is attempting to affect.
Outcomes are the things that the public cares about. Output measures are the goods and services a program
produces to affect the outcome. Inputs are the resources that programs consume to produce outputs and outcomes.
2
Section 3
Unless the program undergoes a major change, goal and target text should not change.
Only the annual target numbers and endpoint target dates may need updating based on
actual vs. planned prior year results and actual vs. planned budget allocations.
Consistency in performance measures from year-to-year allows multi-year performance
trends to be identified and used to inform future resource decisions.
Budgets must be linked to annual targets so the marginal impacts of funding decisions
can be assessed.
The format, style, and text of NNSA performance measures should be consistent with
the example below.
NNSA PERFORMANCE MEASURES EXAMPLE
GOAL: Permanentlv cease Russia's oroduction of weapons-wade olutonium by replacing their three existing olutonium-production reactors with
fossil-fuel plants to provide alternate sources of heat and ele&icity allowing the~plutoniu~reactors to be shuidown.
NIA
-
NIA
T:
98%
T:
67%
NIA
--
NIA
--
7':
100%
--
1
67%
--
Cumulative percentage of
progress towards refurbishing a
fossil-fuel plant in Seversk
allowing for the shutdown of two
weapons-grade plutonium
production reactors (Long-term
Output).
3y 2009, complete
.efurbishment of a
fossil-fuel plant in
Seversk.
Annual Cost Performance Index
(CPI) for Seversk construction as
measured by the ratio of
budgeted costs of work
performed to actual costs of work
performed (Efficiency)
bnually,
completed work at
or below budgeted
cost (CPI greater
than I .OO indicates
under budget).
R:
1 .oo
T:
1 .oo
R:
0.5%
T:
0.5%
NIA
Cumulative percentage of
progress towards constructing a
fossil-fuel plant in Zheleznogorsk
allowing for the shutdown of one
weapons-grade plutonium
production reactor (Long-term
Output).
Cumulative percentage of
Russian weapons-grade
plutonium production capability
eliminated (Russia's 2003
baseline is 0.4 MTlyear per
reactor or 1.2 MTlyr total) (Long-
term Outcome)
By 201 1, complete
construction of a
fossil-fuel plant in
Zheleznogorsk.
By 201 1, eliminate
100% of Russia's
capability to
produce weapons-
grade plutonium.
NIA NIA
PERFORMANCE REVIEWS
The NNSA validates results, ensures planning integrity, informs resource decisions, and holds
managers accountable by conducting credible, tiered, and linked performance reviews.
PART Reviews:
The OMB created PART to assess performance measures, results, and management
planslcontrols. The OMB conducts PART reviews of each program every fiveio six years
unless there is a pressing reason to complete it more often. The list of NNSA programs
selected by OM0 will be included in the annual "NNSA Program and Fiscal Guidance" issued in
February. Programs selected must complete their PART and provide a copy to the NNSA
PPBE Office before the NNSA Program Review Council meeting in April. PART instructions
can be found at www.omb.aovlpart.
In addition, all programs not selected for an OMB review must conduct an annual PART self-
assessment. Managers rate their programs and provide this data to their DeputyIAssociate
Administrator for approval. PART self-assessments must be completed in time for the
program's annual Administrator Program Review and a copy provided to the NNSA PPBE
Office.
Administrator's Program Reviews:
The Administrator will review each NNSA program annually. The focus of these reviews is to
validate the progress programs are making towards achieving annual and endpoint ,targets by
highlighting progress on key milestones and to identify issues that might prevent programs from
achieving their targets. Programs must present their most recent annual PART self-,assessment
results. Actions resulting from these reviews will be recorded and tracked to completion. The
Administrator's Program Review schedule is located at htt~://ha.na.aov/PPBEl
Section 4
DOE Performance Reports:
The DOE requires programs to provide quarterly reports on the progress made towards
achieving annual targets. These reports provide senior managers with early warning and
corrective actions if an annual target is at risk of being missed. The DOE requires two reports -
the Joule report and the Program Management Self-Assessment (PMSA) report. Guidance for
both of these reports is included in the quarterly "NNSA Guidance for Joule and Program
Management Self-Assessment Reporting" normally issued one month prior to DOE due dates.
Joule reporting is at the annual target level. Programs assess the projected year-end results for
each annual target using the DOE Joule rating system where Green requires 100% or greater of
the annual target to be achieved, Yellow requires 80% to less than 100% of the annual target to
be achieved, and Red requires less than 80% of the annual target to be achieved. F:or all
progress, programs must report the specific result achieved and describe the significance of the
achievement. For Yellow and Red progress, programs must also explain the cause of the at
risk annual targets and the action plan for recovery.
PMSA reporting is at the program level. Programs managers must provide color ratings and
text for cost performance, schedule performance, and overall performance of their programs.
The PMSA uses a more subjective approach that allows the program manager to assess all the
factors impacting annual program performance (not just the Joule targets) and to assign a Red-
Yellow-Green based on the manager's expert opinion. The PMSA results must be validated by
the appropriate DeputyIAssociate Administrator.
Programs must document and use consistent internal control procedures to describe the data,
formulas, and detailed processes used to determine results. This documentation is required to
provide evidence to substantiate the accuracy of reported results to auditors.
Program Manager Reviews:
Program managers must conduct detailed reviews of program, project, and contractor
performance at least annually; but quarterly reviews are recommended. The focus of these
reviews is to validate progress on milestones leading to achievement of annual targets. The
format of these reviews is the responsibility of the cognizant manager. However, this policy
requires NNSA program managers to document their detailed review process and findings.
NNSA Annual Performance Report
The NNSA corporate PPBE evaluation cycle culminates each year with the issuance of the
"NNSA Annual Performance Report" in February. This report serves as a corporate summary
by integrating past performance results from Joule with planned future targets from the budget
and an executive analyses of PART scores.
PERFORMANCE CASCADE:
NNSA articulates the unique contribution each target makes towards achieving the DOE
mission by linking them in a cascade so resources can be better focused on fulfilling the overall
mission. As illustrated in the NNSA Performance Cascade below, internal milestones are linked
to endpoint/annual targets that roll into unique NNSA program goals that are aligned to DOE
StrategicIGeneral Goals and, ultimately, to the DOE mission.
THE NNSA PERFORMANCE CASCADE
3 Also called 'DOE Strst0Qic Themes"
Also callsd 'DOE Goals'
RESPONSIBILITIES
The Administrator, NNSA, is responsible for:
Approving overall NNSA corporate performance and performance measures;
Conducting Administrator's Program Reviews
Approving PARTS prior to their submission to OMB.
Section 5
The Director, Office of Planning, Programming, Budgeting, and Evaluation is responsible for:
Managing the overall NNSA PPBE Evaluation process
Keeping The PPBE Evaluation process documentation current and posting it on the
NNSA PPBE intranet at htt~://ha.na.aov/PPBE/
Coordinating and issuing the annual Evaluation process-related guidance documents
("NNSA Call for Budget Information", "NNSA Program and Fiscal Guidance", and "NNSA
Guidance for Joule and Program Management Self-Assessment Reporting")
Maintaining the integrated NNSA Performance Cascade
Maintaining configuration control over the corporate NNSA Performance Measures and
publishing them in the budget
Providing PART feedback advice to Headquarters NNSA elements
Tracking actions resulting from the Administrator's Program Reviews
Consolidating and transmitting the NNSA quarterly Joule and Program Management
Self-Assessment reports to DOE
Developing, coordinating, and issuing the "NNSA Annual Performance Report"
Providing training to NNSA staff on the elements of the NNSA PPBE Evaluation process
Headquarters NNSA program elements (Defense Programs, Defense Nuclear Nonproliferation,
Naval Reactors, Emergency Operations, Infrastructure and Environment, Defense Nuclear
Security, and Management and Administration) will be responsible for:
Being familiar with the requirements of the NNSA PPBE Evaluation process, including
current guidance available on the NNSA PPBE intranet at htt~://ha.na.c~ov/PPBE/
Generating products that fulfill NNSA PPBE Evaluation process requirements (quality
performance measures, credible PART self-assessments and Program Managers
Reviews, and timely and accurate Joule Reports and Program Management Self-
Assessments).
Documenting and using consistent internal control procedures that provide evidence to
substantiate the accuracy of reported results to auditors.
Other NNSA entities (e.g., Service Center and Site Offices):
May be asked to participate at various stages of the process as specified in this
document.
d@/k Michael . Kane
~ s s o c i d 6 Administrator for
Management and Administration