Section 1
NNSA POLICY LETTER
Approved: 6-20-13
WEAPON QUALITY POLICY
NATIONAL NUCLEAR SECURITY ADMINISTRATION
Office of Defense Programs
NAP-24
AVAILABLE ONLINE AT: INITIATED BY:
http://hq.na.gov Weapon Quality Division
http://hq.na.gov/
THIS PAGE INTENTIONALLY LEFT BLANK
NAP-24 1
6-20-13
WEAPON QUALITY POLICY
1. PURPOSE. The purpose of this document, NNSA Weapon Quality Policy (NAP-24), is to
identify the quality requirements applicable to weapon activities of the NNSA, NNSA
contractors and subcontractors.
The requirements contained herein are in addition to the scope of quality requirements
found in DOE Order 414.1D, Quality Assurance. NAP-24 establishes specific weapon
and weapon-related product focused quality requirements for designing, producing and
surveilling safe, secure and reliable weapon products.
2. CANCELLATION. DOE/NNSA Weapon Quality Policy (QC-1), Revision 10, dated
02/10/2004.
3. APPLICABILITY.
a. NNSA Applicability. This NNSA Policy (NAP) applies to NNSA Federal
personnel, NNSA Contractors and subcontractors who perform weapon or related
activities as defined in this NAP.
b. Equivalencies. In accordance with the responsibilities and authorities assigned by
Executive Order 12344, codified at 50 USC sections 2406 and 2511 and to ensure
consistency through the joint Navy/DOE Naval Nuclear Propulsion Program, the
Deputy Administrator for Naval Reactors (Director) will implement and oversee
requirements and practices pertaining to this Directive for activities under the
Director's cognizance, as deemed appropriate.
4. REQUIREMENTS. See Attachment 1 and Attachment 2
5. RESPONSIBILITIES. See Attachment 2, Section 4.0
6. REFERENCES.
a. DOE O 414.1D, Quality Assurance, dated 04-25-11
b. Supplemental Directive NA SD M 452.3-1, Defense Programs Business
Requirements and Processes Manual, dated 12-10-09. NA SD M 452.3-1
combines active Development and Production Manual Chapters and
Requirements Modernization and Integration Level 2 and Level 3 content at a
single electronic gateway, RMI Explorer Portal https://rmi.sandia.gov/
c. NNSA Definition Lexicon, located at https://rmi.sandia.gov/pages/lexicon.aspx
7. DEFINITIONS. Definitions regarding this NAP are documented and maintained in the
NNSA Definition Lexicon.
2 NM~
6-20-13
8. CONTACT. Questions concerning this NAP should be addressed to the Weapon Quality
Division, NA-121.3 (505-845-5171).
BY ORDER OF THE ADMINISTRATOR:
Neile L. Miller
Acting Administrator
Attachments:
1. Contractor Requirements Document
2. Weapon Quality Requirements
NAP-24 Attachment 1
6-20-13 A1-1
ATTACHMENT 1: CONTRACTOR REQUIREMENTS DOCUMENT
NAP-24, Weapon Quality Policy
This Contractor Requirements Document (CRD) establishes the following requirements for
NNSA contractors within the Nuclear Security Enterprise for the management of NNSA
facilities that are involved in or interact with the management of the nuclear weapons stockpile,
develop or produce weapon product or weapon related product.
Regardless of the performer of the work, the contractor is responsible for complying with the
requirements of this CRD. The contractor is responsible for flowing down the requirements of
this CRD to subcontractors at any tier to the extent necessary to ensure the contractor’s
compliance with the requirements. In doing so, the contractor must not flow down requirements
to subcontractors unnecessarily or imprudently. The contractor will ensure that it and its
subcontractors comply with the requirements of this CRD.
Section 2
The requirements of this CRD are in NAP-24, Attachment 2, Weapon Quality Requirements.
THIS PAGE INTENTIONALLY LEFT BLANK
NAP-24 Attachment 2
6-20-13 A2-1
ATTACHMENT 2: WEAPON QUALITY REQUIREMENTS
TABLE OF CONTENTS
1.0 PURPOSE .............................................................................................................................. 3
1.1 SCOPE ................................................................................................................................ 3
1.2 SUPPLEMENTAL POLICY AND CLARIFICATIONS .................................................. 3
2.0 BASIC REQUIREMENTS .................................................................................................... 3
2.1 RISK MANAGEMENT ..................................................................................................... 3
2.2 WEAPON QUALITY MANAGEMENT SYSTEM .......................................................... 3
2.2.1 WQAP ............................................................................................................................ 4
2.2.2 SUBMITTAL, APPROVAL, IMPLEMENTATION, AND REPORTING .................. 4
2.3 ORGANIZATION .............................................................................................................. 4
2.4 EARLY AND CONTINUOUS APPLICATION OF QUALITY PRINCIPLES ............... 5
2.4.1 PRODUCIBILITY .......................................................................................................... 5
2.5 ESTABLISHING AND VALIDATING REQUIREMENTS ............................................ 5
2.6 PLANNING ........................................................................................................................ 6
3.0 QUALITY REQUIREMENTS .............................................................................................. 6
3.1 QUALITY IMPROVEMENT ............................................................................................ 6
3.1.1 CONTINUOUS IMPROVEMENT PROCESS ............................................................. 6
3.1.2 PREVENTION VERSUS DETECTION ....................................................................... 6
3.1.3 METRICS ....................................................................................................................... 6
3.2 TRAINING ......................................................................................................................... 7
3.3 DESIGN .............................................................................................................................. 7
3.3.1 DESIGN INPUT ............................................................................................................. 7
3.3.2 DESIGN PROCESS ....................................................................................................... 7
3.3.3 DESIGN VERIFICATION ............................................................................................. 8
3.3.4 DESIGN REVIEWS ....................................................................................................... 8
3.3.5 DESIGN QUALIFICATION.......................................................................................... 9
3.3.6 DESIGN DOCUMENTS ................................................................................................ 9
3.3.7 DESIGN CHANGE CONTROL AND CONFIGURATION MANAGEMENT ........... 9
Section 3
3.3.8 INTERFACE CONTROL .............................................................................................. 9
3.3.9 DESIGN RECORDS .................................................................................................... 10
3.4 INSTRUCTIONS, PROCEDURES, AND DRAWINGS ................................................ 10
3.5 DOCUMENT CONTROL ................................................................................................ 10
3.6 PROCUREMENT ............................................................................................................ 10
3.6.1 SUPPLIER EVALUATION, SELECTION, AND MONITORING ............................ 11
3.6.2 PROCUREMENT DOCUMENTATION .................................................................... 11
3.6.3 ACCEPTANCE OF PROCURED ITEMS AND MATERIALS ................................. 12
3.6.4 ACCEPTANCE OF PROCURED SERVICES ............................................................ 12
3.6.5 CERTIFICATE OF CONFORMANCE ....................................................................... 12
3.7 IDENTIFICATION, CONTROL, AND STATUS OF ITEMS ....................................... 13
3.7.1 IDENTIFICATION OF ITEMS ................................................................................... 13
3.7.2 CONTROL OF ITEMS ................................................................................................ 13
3.7.3 STATUS OF ITEMS .................................................................................................... 14
3.7.4 TOOLING AND FIXTURES ....................................................................................... 14
Attachment 2 NAP-24
A2-2 6-20-13
3.7.5 LIMITED-LIFE MATERIALS AND COMPONENTS .............................................. 14
3.7.6 MATERIALS OR ITEMS DESIGNATED FOR DESTRUCTIVE TESTING ........... 14
3.7.7 SPECIAL INSTRUCTIONS AND ENVIRONMENTS .............................................. 14
3.8 CONTROL OF PROCESSES .......................................................................................... 15
3.8.1 PROCESS CONTROL METHODS ............................................................................. 15
3.8.2 SPECIAL PROCESSES ............................................................................................... 15
3.9 INSPECTION, TEST, AND ACCEPTANCE ................................................................. 16
3.9.1 INSPECTION AND TEST ........................................................................................... 16
3.9.2 ACCEPTANCE ............................................................................................................ 16
3.10 CONTROL OF MEASURING AND TEST EQUIPMENT ............................................ 17
3.11 HANDLING, STORAGE, PACKAGING, AND DELIVERY ....................................... 17
3.11.1 GOVERNMENT-FURNISHED MATERIAL ............................................................. 17
3.11.2 NNSA-ACCEPTED MATERIAL ................................................................................ 18
3.12 NONCONFORMANCE ................................................................................................... 18
3.12.1 NONCONFORMING ITEM CONTROL .................................................................... 18
3.12.2 NONCONFORMING ITEM DISPOSITION .............................................................. 19
Section 4
3.13 CORRECTIVE ACTION ................................................................................................. 20
3.14 RECORDS ........................................................................................................................ 20
3.15 ASSESSMENTS .............................................................................................................. 21
3.15.1 MANAGEMENT ASSESSMENTS ............................................................................. 21
3.15.2 INDEPENDENT ASSESSMENTS .............................................................................. 22
3.15.3 ASSESSOR QUALIFICATION .................................................................................. 22
3.15.4 SCHEDULING ............................................................................................................. 22
3.15.5 PLANNING .................................................................................................................. 22
3.15.6 PERFORMANCE ......................................................................................................... 22
3.15.7 REPORTING ................................................................................................................ 22
3.16 SOFTWARE QUALITY ASSURANCE ......................................................................... 22
4.0 RESPONSIBILITIES .......................................................................................................... 23
4.1 NNSA ADMINISTRATOR ............................................................................................. 23
4.2 DEPUTY ADMINISTRATORS AND CONTRACTOR MANAGERS ......................... 23
4.3 NA-10, OFFICE OF DEFENSE PROGRAMS, ASSISTANT DEPUTY
ADMINISTRATORS ....................................................................................................... 24
4.4 NA-121.3, WEAPON QUALITY DIVISION ................................................................. 24
4.5 CONTRACTING OFFICERS .......................................................................................... 24
4.6 NA-00-LL/KC/SV/NS/SN/LA/NPO, FIELD/PRODUCTION OFFICE MANAGERS .. 25
4.7 CONTRACTORS ............................................................................................................. 25
NAP-24 Attachment 2
6-20-13 A2-3
1.0 PURPOSE
Attachment 2 provides the weapon quality requirements as required by NAP-24, Weapon
Quality Policy.
1.1 SCOPE
This document describes minimum quality requirements for the NNSA, NNSA
contractors and subcontractors responsible for weapon life-cycle phases 1-7 activities (as
defined in Supplemental Directive NA SD M 452.3-1, Defense Programs Business
Requirements and Processes Manual, Chapter 3.1, Phases 1-7, located at
https://prp.sandia.gov/DPManual/d-p_chap03-1.pdf). Requirements are aimed at
ensuring customer requirements are met during all seven phases of weapon and weapon-
related product realization – from concept definition to disposal.
1.2 SUPPLEMENTAL POLICY AND CLARIFICATIONS
Occasionally, supplemental policy and/or clarification to the Weapon Quality Policy is
required. For instances where clarification of requirements is needed, a Guidance and
Clarification (G&C) message will be issued by NA-121.3, Weapons Quality Division
(HQ WQD). G&C messages will be incorporated into the NAP upon the next revision.
When supplemental policy or a change in policy is needed, a revision to that section of
the NAP will be performed.
Section 5
2.0 BASIC REQUIREMENTS
2.1 RISK MANAGEMENT
When choosing to use a graded approach
a. a risk-management process shall be used to analyze, determine and document the
rigor of meeting the requirements of this NAP, provided the risk-management
process can ensure there are no adverse impacts to the quality of weapon and
weapon-related products; and
b. the risk-management process and areas of graded rigor shall be documented in the
Weapon Quality Assurance Program (WQAP).
2.2 WEAPON QUALITY MANAGEMENT SYSTEM
NNSA, NNSA contractors and subcontractors shall integrate quality requirements into
management and work practices so that missions are accomplished and customer
requirements are met. Metrics shall be used to evaluate the effectiveness of the Weapons
Quality Management System (WQMS).
https://prp.sandia.gov/DPManual/d-p_chap03-1.pdf
Attachment 2 NAP-24
A2-4 6-20-13
2.2.1 WQAP
Implementation of NAP-24 requirements shall be described in a WQAP. The WQAP
may be integrated into the DOE O 414.1D (or equivalent) required Quality Assurance
Program (QAP). The WQAP shall
a. describe the WQMS;
b. describe the approach to implementing NAP-24 requirements and other weapon
quality requirements contained in contractual documents and their flow down to
implementing procedures; and
c. describe the organizational structure.
2.2.2 Submittal, Approval, Implementation, and Reporting
NNSA and NNSA contractors responsible for work in any weapon life-cycle phase shall
a. submit WQAP to the appropriate Field/Production Office Manager or Assistant
Deputy Administrator for approval;
b. implement the WQAP;
c. submit significant changes of the WQAP to the appropriate Field/Production
Office Manager or Assistant Deputy Administrator for approval;
d. maintain WQMS metrics to provide objective evidence of performance;
e. perform and document an annual management assessment of their WQMS; and
f. use the approved organization WQAP as the basis for assessment of the
organization’s weapon quality program.
2.3 ORGANIZATION
Senior management shall provide evidence of their commitment to the WQMS by
a. describing in the WQAP, the organizational structure, responsibilities, levels of
authority, and lines of communication for implementing the WQAP;
b. establishing processes and policies that ensure customer requirements are
determined, documented, communicated, and met with the aim of enhancing
customer satisfaction; and
c. assigning responsibility to a senior manager with sufficient authority,
responsibility, and unrestricted access to all levels of management and staff to
ensure
NAP-24 Attachment 2
6-20-13 A2-5
i.) WQMS is implemented and effective;
ii.) improvement opportunities are identified, communicated and resolved;
iii.) WQAP performance, at all organizational levels, is monitored and
communicated;
iv.) manage nonconformances in accordance with NAP-24, Attachment 2,
Section 3.12;
v.) manage corrective actions in accordance with NAP-24, Attachment 2,
Section 3.13; and
vi.) personnel verifying quality achievement must not be directly responsible for
the work being evaluated.
2.4 EARLY AND CONTINUOUS APPLICATION OF QUALITY PRINCIPLES
NNSA contractors responsible for weapon and weapon-related product or process design
shall
a. have a documented process to ensure that operating, production, and quality
requirements are incorporated in the design process as early as feasible;
Section 6
b. provide for the timely identification and evaluation of key elements that are
critical to program success; and
c. provide an objective means to measure design, product, process, and production
readiness.
2.4.1 Producibility
Producibility shall be
a. formally addressed in the weapon design and design change processes; and
b. evaluated by the design agency and production agency through an established and
documented process.
2.5 ESTABLISHING AND VALIDATING REQUIREMENTS
Beginning with Phase 1, Weapon Conception, and continuing throughout the life-cycle
of the weapon or weapon-related product, documented processes shall be in place to
identify, document, validate, control and maintain customer requirements.
Attachment 2 NAP-24
A2-6 6-20-13
2.6 PLANNING
Planning activities shall
a. be performed and documented prior to the start of work to ensure that work is
accomplished to satisfy applicable requirements; and
b. provide for special controls, processes, test equipment, tools, and skills needed to
attain and verify the required quality.
3.0 QUALITY REQUIREMENTS
3.1 QUALITY IMPROVEMENT
3.1.1 Continuous Improvement Process
A continuous improvement process shall
a. document the methodology for achieving improvement;
b. review item characteristics, process performance, and other quality-related
information and analyze the data to identify items, services, and processes
needing improvement;
c. manage nonconformances in accordance with NAP-24, Attachment 2, Section
3.12; and
d. manage corrective action in accordance with NAP-24, Attachment 2, Section
3.13.
3.1.2 Prevention Versus Detection
The WQMS shall
a. focus on preventing nonconformance, reducing variability, and building quality
into weapon and weapon-related products and processes; and
b. utilize methods to prevent quality issues, including but not limited to the
following: process characterization, mistake-proofing, and reduction of product
and process variability.
3.1.3 Metrics
NNSA, NNSA contractors and subcontractors shall identify, document, track, trend, and
maintain WQMS metrics and utilize them for corrective action, continuous improvement
and objective evidence of performance.
NAP-24 Attachment 2
6-20-13 A2-7
3.2 TRAINING
Documented processes shall ensure
a. personnel are trained and/or qualified to be capable and competent prior to
performing their assigned work;
b. personnel are provided continuing training to maintain job proficiency;
c. evidence of training, qualification, and/or certification are maintained; and
d. qualification is based on a combination of factors including education, training,
skills and experience.
3.3 DESIGN
The design agency shall be responsible for the design of items and design processes
under their responsibility.
3.3.1 Design Input
Design inputs shall be identified and documented, and their selection reviewed and
approved prior to the final design implementation.
3.3.2 Design Process
a. Items and processes shall be designed using sound engineering, scientific
principles and appropriate standards.
b. Designs shall provide a clear link between design inputs and design requirements,
including production requirements and specifications.
c. Design work, including changes, shall incorporate applicable requirements and
design bases.
d. Designs shall also incorporate critical characteristics required for such things as
function, reliability, interchangeability, design life, safety, dismantlement and
reuse.
Section 7
e. Design specifications shall not be more restrictive than essential for achieving
required performance with appropriate margin.
f. The design agency shall determine and set the value and tolerance for design
specifications.
g. The design agency shall produce final designs that lead to successful manufacture,
assembly, use, and operation.
Attachment 2 NAP-24
A2-8 6-20-13
h. Calculations, modeling, and testing shall establish the design parameters and
maintain the appropriate margins by taking into account uncertainties associated
with the design envelope.
i. Test equipment and instrumentation used for the development of design
parameters shall be calibrated, and the precision and accuracy shall be established
over the full range of use.
j. Design information that supports use and maintenance of the weapon and
weapon-related product, in addition to the disposition of non-conforming
materials and items, shall be developed as part of the design process and
documented.
3.3.3 Design Verification
The adequacy of designs shall be verified and documented before approval and
implementation.
3.3.4 Design Reviews
a. At suitable stages, design reviews shall be conducted and documented by
individuals or groups not directly responsible for the work to ensure, at the time
of the review, that
i.) design inputs are complete and correct;
ii.) assumptions necessary to perform the design are adequately described and
valid;
iii.) applicable design standards are used;
iv.) computer programs, including mathematical models used in simulation
codes, are adequately verified and validated and recorded for future
retrieval;
v.) suitable materials, parts, processes, and inspection and testing criteria are
specified; and
vi.) design qualification methods are adequate.
b. The design review process shall accommodate observation or subsequent
review(s) by NNSA and/or independent third parties.
NAP-24 Attachment 2
6-20-13 A2-9
3.3.5 Design Qualification
The design agency shall specify when qualification is required and the qualification
methods to be used to confirm that customer requirements are met. Qualification test
plan(s) shall
a. be developed and documented; and
b. be used to document qualification test results and ensure that performance
objectives and requirements are met.
The design agency shall
c. obtain concurrence from the using organization that specifications in design
documents are complete and the detail is understood; and
d. obtain concurrence for the product design from the applicable production facilities
or organization that the producibility of the design is mutually acceptable.
3.3.6 Design Documents
Design information transmitted across organization interfaces shall identify the status of
information provided and incomplete items that require further evaluation, review, or
approval.
3.3.7 Design Change Control and Configuration Management
a. Changes to design inputs and final designs shall
i.) be subject to control measures (including design reviews)
commensurate with the risk introduced by the change; and
ii.) include evaluation of effects of the changes on the overall design
and on analyses upon which the design is based.
b. A design configuration management process shall be established and
documented and ensure that
i.) configuration control is established early in the design process;
and
ii.) configuration control is applied to design inputs, design
calculations and analyses, design qualification, and design
documents.
Section 8
3.3.8 Interface Control
Design interfaces shall be identified and controlled.
Attachment 2 NAP-24
A2-10 6-20-13
3.3.9 Design Records
Complete and accurate records of weapon design activities shall be maintained
in accordance with NAP-24, Attachment 2, Section 3.14.
3.4 INSTRUCTIONS, PROCEDURES AND DRAWINGS
a. Work shall be prescribed by and performed in accordance with approved and
controlled documented instructions, procedures, drawings, specifications, other
documents, or models that include or reference appropriate acceptance criteria for
determining that results have been satisfactorily attained.
b. Current instructions, procedures, drawings, specifications, other documents, and
models shall be available to and used by the personnel performing the work.
3.5 DOCUMENT CONTROL
A documented process shall be established and maintained to control documents,
including models and data. Documents shall be prepared, reviewed, approved, issued,
used, and revised to prescribe processes, specify requirements, or establish design. The
process shall ensure
a. identification of controlled documents;
b. identification of individuals responsible for the preparation, review, approval, and
distribution of controlled documents;
c. review of controlled documents for adequacy, completeness, and approval prior to
distribution;
d. correct documents are available;
e. documents specify an effective date; and
f. timely release, distribution, and implementation.
3.6 PROCUREMENT
Purchasers are responsible to ensure that purchased weapon and weapon-related products
conform to specified purchase requirements. The procurement process shall be
documented and ensure that
a. procurement documents, including contracts, contain correct requirements;
b. prospective Suppliers are evaluated and selected on the basis of specified
criteria, technical capabilities and rigor of their Quality Management System
(QMS);
NAP-24 Attachment 2
6-20-13 A2-11
c. procured items and services meet established requirements and perform as
specified;
d. risks associated with supply chain management are evaluated and addressed;
and
e. it prevents introduction of suspect/counterfeit items in accordance with
Attachment 3 to DOE O 414.1D, Suspect/Counterfeit Items Prevention.
3.6.1 Supplier Evaluation, Selection, and Monitoring
a. The Purchaser shall select Suppliers on the basis of assessment of ability to supply
weapon and weapon-related product in accordance with requirements, including
quality requirements and technical capabilities for the product(s) and service(s) being
procured.
b. Supplier evaluation and selection shall be documented.
c. Suppliers shall be monitored with regard to the effectiveness of their QMS and the
quality of their weapon and weapon-related product.
d. Contractor’s purchase orders or contracts shall provide for NNSA and its contractors
to perform quality surveys and inspections at Supplier locations where materials or
services are rendered.
3.6.2 Procurement Documentation
Procurement documents shall specify that the Supplier have an effective QMS that
complies with the applicable requirements of this document. Procurement documents
shall be controlled and identify
a. documentation required;
b. requirements for approval and/or qualification of weapon and weapon-related
product, processes and equipment, to include supplier requirements to notify
Purchaser of subsequent changes and when to obtain re-approval;
Section 9
c. requirements for control of weapon and weapon-related product and equipment;
d. requirements for configuration control of customer requirements and
implementing procedures;
e. requirements to notify of nonconforming weapon and weapon-related products or
processes;
f. requirements for disposition of nonconforming weapon and weapon-related
products;
Attachment 2 NAP-24
A2-12 6-20-13
g. flow-down requirements to Supplier’s supply chain;
h. records to be submitted and/or maintained;
i. record retention and disposition requirements; and
j. requirements for purchaser’s prior approval of substitutions.
3.6.3 Acceptance of Procured Items and Materials
a. Processes and controls shall
i.) be established to evaluate procured items and materials to determine
conformance to applicable specifications; and
ii.) ensure malicious hardware or software are prevented from entry into the Nuclear
Security Enterprise (NSE) supply chain.
b. When Supplier-provided reports are used as a basis of acceptance, the reported results
shall be compared with requirements. The validity of Supplier-provided reports shall
be periodically verified by the purchaser by at least one of the following methods:
i.) independent evaluation to requirements; or
ii.) independent assessment (to establish the validity of the Supplier-provided
reports).
3.6.4 Acceptance of Procured Services
In cases involving procurement of services only (such as third-party inspection/testing;
engineering and consulting services; assessment; and installation, repair, overhaul, or
maintenance work), the Purchaser shall accept the service by any or all of the following
methods:
a. technical verification of data produced;
b. surveillance and/or assessment of the activity; and/or
c. review of objective evidence for conformance to the procurement document
requirements.
3.6.5 Certificate of Conformance
a. A certificate of conformance is required for weapon and weapon-related material
and hardware destined for production activities. The certificate shall
i.) identify the purchased material or equipment and associated procurement
document(s);
NAP-24 Attachment 2
6-20-13 A2-13
ii.) identify the specific procurement requirements met by the purchased
material or equipment; and
iii.) be signed or otherwise authenticated by a person who is responsible for
this function as described in the Supplier’s Quality Management System.
b. Where a certificate of conformance is not available, ensure and document the
method used for determining purchased material or equipment meets
specification requirements for procurements.
c. The Purchaser shall establish means to verify the validity of Supplier
certificates and the effectiveness of their certification process, by at least one of
the following methods:
i.) independent evaluation of requirements; or
ii.) independent assessment (to establish the validity of the certificate of
conformance).
3.7 IDENTIFICATION, CONTROL, AND STATUS OF ITEMS
A process shall be established and documented so that items are identified and controlled
to ensure proper use and maintained to prevent damage, loss, or deterioration.
3.7.1 Identification of Items
a. Physical identification shall be used where possible. Identification markings
shall
i.) be applied using materials and methods that provide a clear and legible
identification;
ii.) not degrade the function or service life of the item;
iii.) be transferred to each part of an identified item when subdivided; and
Section 10
iv.) not be obliterated or hidden unless other means of identification are
substituted.
b. Where physical identification on the item is either impractical or insufficient,
physical separation, procedural control, or other appropriate means shall be
employed.
3.7.2 Control of Items
a. Markings, authorized stamps, tags, labels, routing cards, physical location, or
other suitable means shall identify the status of items from the initial receipt and
fabrication of items up to and including use.
Attachment 2 NAP-24
A2-14 6-20-13
b. Items shall be traceable to the applicable specification and grade of the material;
heat, batch, lot, part, or serial number; or specified inspection, test, or other
records.
c. The process shall provide for maintenance or replacement of markings and
identification records due to damage from handling or aging, as well as
protection of identifications on items subject to excessive deterioration due to
environmental exposure.
3.7.3 Status of Items
a. The status of inspection and test activities shall be identified either on the items or
in documents traceable to the items where it is necessary to ensure that required
inspections and tests are performed.
b. Items which have not passed the required inspections and tests shall not be
installed, used, or operated.
3.7.4 Tooling and Fixtures
Tooling and fixtures (e.g., dies, molds, fixtures, gages, crucibles, assembly tools,
disassembly tools, handling devices) used in conjunction with weapon production,
surveillance, or dismantlement shall be identified and controlled.
3.7.5 Limited-Life Materials and Components
a. Materials and components having limited calendar, operating, or cycle life shall
be identified and controlled to preclude use of expired items.
b. Means for efficient recall and disposition of limited-life materials and components
shall be established.
3.7.6 Materials or Items Designated for Destructive Testing
Controls shall be established for materials or items designated for destructive testing or
special evaluation to ensure testing or evaluation is performed to specified requirements
and to prevent inadvertent use or shipment.
3.7.7 Special Instructions and Environments
Instructions for marking and labeling items shall be established as necessary to
adequately identify, maintain, and preserve the items, including an indication of the
presence of special environments or the need for special controls.
NAP-24 Attachment 2
6-20-13 A2-15
3.8 CONTROL OF PROCESSES
Work shall be performed to established technical standards and administrative controls
using approved instructions, procedures, or other appropriate means and shall ensure
that
a. criteria for workmanship are stipulated in written standards or by means of
representative standards;
b. processes are characterized, documented, and maintained under controlled
conditions to minimize variability and to prevent nonconformance;
c. proposed process changes are evaluated for their potential impact on quality,
producibility, and maintainability prior to incorporation;
d. when qualification is required, the design agency and production agency will
jointly qualify processes (including inspection, test, and acceptance processes)
and document the qualification prior to use for acceptance and production;
e. equipment used for process monitoring or data collection are calibrated and
maintained in accordance with NAP-24, Attachment 2, Section 3.10; and
Section 11
f. a process to formally suspend weapon work is developed and implemented for
conditions significantly adverse to quality, to include establishing measurable
criteria for work suspension and resumption.
3.8.1 Process Control Methods
a. When production quantities are sufficient in number, statistical methods (such as
statistical process control) shall be used to ensure continuous control over
production processes and to identify and continually reduce variability.
b. When production quantities are not large enough to permit the use of statistical
methods, alternative control methods shall be applied, such as 100 percent test
and inspection when that degree of rigor is necessary to confirm compliance to
specification.
3.8.2 Special Processes
a. Special processes shall be identified and procedures, processes, and controls
implemented to ensure a high level of confidence in the control of weapon and
weapon-related product variability and to minimize nonconformances.
b. Special-process equipment and procedures shall be qualified and controlled.
i.) When the outcome of a special process is dependent upon the skill of the
person performing the process, that person shall be certified to a written
procedure.
Attachment 2 NAP-24
A2-16 6-20-13
ii.) Evidence of qualification of equipment and procedures and certification of
personnel shall be maintained.
c. When available, special process codes and standards (including acceptance
criteria for the process) shall be specified or referenced in procedures or
instructions.
d. For special processes not covered by existing codes and standards or where
quality requirements specified exceed those of existing codes or standards, the
necessary requirements for qualification of personnel, procedures, or equipment
shall be specified or referenced in procedures or instructions.
3.9 INSPECTION, TEST, AND ACCEPTANCE
3.9.1 Inspection and Test
a. Inspection and testing of specified items, services, and processes shall be
conducted under controlled conditions using established acceptance and
performance criteria.
b. Inspection and test requirements and results shall be documented.
c. Equipment used for inspections and tests shall be calibrated and maintained.
d. Measurement uncertainty requirements and capability of inspection and test
processes shall be determined and documented.
e. Qualified persons, other than those who perform or directly supervise the work
being inspected or tested, shall perform acceptance inspections and tests
verifying weapon and weapon-related product conformance to design criteria.
f. Where independent inspections and tests are not feasible because of special
requirements, the responsible organization shall develop an alternative method,
document it and the basis for requesting exception, and obtain design agency
approval for use.
g. Records shall be maintained to establish traceability between product and
measuring and test equipment used for its test or inspection.
3.9.2 Acceptance
There shall be a documented process and procedures for contractor submittal of
completed weapon and weapon-related product and for NNSA acceptance of that product
to ensure that
a. the weapon and weapon-related product was manufactured to and conforms to the
correct design definition;
NAP-24 Attachment 2
6-20-13 A2-17
b. the quality evidence is correct and representative of that weapon and weapon-
related product;
Section 12
c. when automated manufacturing processes are used as the method of acceptance,
they are designed, validated, qualified, controlled, and monitored sufficiently to
protect weapon and weapon-related product quality such that the completion of
the automated operation may be accepted as objective evidence of conformance to
requirements;
d. when fixtures, molds, and other such tooling are used as the method of
acceptance, they are certified prior to release for use and controlled and
recertified according to established criteria;
e. when material requires modification, repair, or replacement after weapon and
weapon-related product acceptance, there is a witnessing or verification of the
modification, repair, or replacement and reverification of affected characteristics
prior to reacceptance; and
f. sampling plans prescribe random sampling and afford a sound statistical basis
to ensure quality.
3.10 CONTROL OF MEASURING AND TEST EQUIPMENT
A standards and calibration program shall be established, documented and maintained in
accordance with Supplemental Directive NA SD M 452.3-1, Defense Programs Business
Requirements and Processes Manual, Chapter 13.2, Metrology Program, located at
https://prp.sandia.gov/DPManual/d-p_chap13-2.pdf.
3.11 HANDLING, STORAGE, PACKAGING, AND DELIVERY
a. Handling, storage, packaging, and delivery shall be controlled to prevent damage,
loss, deterioration, or substitution, and the process to control handling, storage,
packaging, and delivery shall be documented.
b. Special handling tools and equipment shall be utilized and controlled, where
necessary, to ensure safe and adequate handling.
c. Special handling tools and equipment shall be inspected and tested according to
established criteria to ensure performance.
3.11.1 Government-Furnished Material
Material shipped from one contractor's responsibility to another will be provided as
Government-Furnished Material and shall be inspected by the receiving contractor for
quantity, completeness, proper type, and shipping and handling damage.
https://prp.sandia.gov/DPManual/d-p_chap13-2.pdf
Attachment 2 NAP-24
A2-18 6-20-13
3.11.2 NNSA-Accepted Material
a. NNSA-accepted material shall be under NNSA management control.
b. NNSA shall be notified when accepted material is issued from stores for purposes
different from the original intent.
c. NNSA shall also be notified when accepted material is issued to perform additional
evaluation, inspection, or rework.
d. The design agency shall describe the need to perform additional evaluation,
inspection, or rework of the material and the methods that will be used for
processing.
e. Special handling, storage, processing, or evaluation of NNSA-accepted
material, including work specified in a Design Agency Special Instruction
Engineering Release (SIER), shall be approved by NNSA prior to
performance.
3.12 NONCONFORMANCE
A documented process shall be established, which prescribes the actions (identify,
investigate, correct and disposition) to address potential and actual nonconforming
conditions and shall
a. ensure that when a potential or actual nonconformance is identified, the
discrepancy is evaluated and appropriate action is taken;
b. define the qualification of personnel authorized to disposition nonconformances;
c. require personnel performing evaluations for determining disposition of a
nonconformance, to have demonstrated competence in the specific area they are
evaluating;
Section 13
d. require personnel performing evaluations to have adequate understanding of the
requirements; and
e. require personnel performing evaluations to have access to pertinent background
information.
3.12.1 Nonconforming Item Control
a. Establish a process to ensure that weapon and weapon-related products that do
not conform to requirements are prevented from use or shipment.
b. Control of nonconforming items shall provide for the identification,
documentation, evaluation, preservation, segregation, and disposition of the item,
as well as notification to the organization(s) concerned.
NAP-24 Attachment 2
6-20-13 A2-19
c. Nonconforming items shall be identified by legible marking, tagging, or other
methods on the item or on the container or package containing the item.
d. Marking shall be durable and not detrimental to the material.
e. Nonconforming items shall be segregated, when practical, by placing them in a
clearly identified and designated hold area until properly dispositioned.
f. When segregation is impractical or impossible due to physical conditions such as
size, weight, access or other limitations, other precautions shall be employed to
preclude inadvertent use of a nonconforming item.
3.12.2 Nonconforming Item Disposition
a. Promptly identify, correct and disposition any nonconforming items.
b. Responsibility for review and the authority for disposition of nonconforming
items shall be defined and documented.
c. A disposition (such as “use as is,” reject, repair, or rework) of nonconforming
items shall be made and documented.
d. NNSA shall be notified when a nonconforming condition involving Government-
Furnished Material is suspected or discovered.
e. NNSA shall report the information regarding the suspect or nonconforming
condition to the contractor that supplied the material.
f. Disposition of nonconforming conditions involving Government-Furnished
Material shall be the responsibility of the design agency.
g. Nonconforming items may be authorized for “use as is” by the design agency.
h. Repair, rework, or evaluation of nonconforming items shall be performed in
accordance with documented procedures approved by the design agency.
i. The technical justification for the acceptability of a nonconforming item
dispositioned as repair or “use as is” shall be documented.
j. “Use as is” or repair dispositions shall be subject to design control measures
commensurate with those applied to the original design.
k. As-built records shall reflect the “use as is” or repair condition.
l. Repaired items shall be reexamined in accordance with applicable procedures and
with the original acceptance criteria unless the design agency has established
alternative acceptance criteria.
Attachment 2 NAP-24
A2-20 6-20-13
m. When nonconforming items are identified, an evaluation shall be performed to
determine if any other previously produced item is also nonconforming and is
properly dispositioned.
3.13 CORRECTIVE ACTION
a. A process shall be established and documented for corrective action. The process
shall
i.) identify and categorize conditions adverse to quality (including criteria for
determining significant conditions adverse to quality);
ii.) track, trend, and report conditions adverse to quality;
iii.) apply compensatory measures, and for significant conditions adverse to
quality, compensatory measures are in place prior to continuing work;
Section 14
iv.) perform causal analysis of a significant condition adverse to quality to
determine if the condition is incidental or systemic;
v.) develop and implement corrective action to prevent recurrence;
vi.) verify that the corrective action prevents a recurrence of the condition
adverse to quality;
vii.) capture and communicate lessons learned for effective use in preventing
problems and making improvements;
viii.) identify if a corrective action effectiveness review is needed; and
ix.) for those identified, review the effectiveness of corrective actions taken.
b. Senior management shall take appropriate action to determine the cause(s) and
correct the systemic failures.
3.14 RECORDS
a. A process shall be established and documented for records management and shall
comply with DOE O 243.1A, Records Management Program. Records may be
originals, copies, or electronic.
b. The process shall include the identification, collection, organization, filing,
storage, maintenance, retrieval, distribution, retention, and disposition of records.
c. Records shall be
i.) specified, prepared, reviewed, approved, and maintained to demonstrate
achievement of quality requirements and an effective WQMS;
NAP-24 Attachment 2
6-20-13 A2-21
ii.) stored such that they are retrievable and in a suitable environment to
minimize deterioration or damage and to prevent loss;
iii.) maintained to furnish objective evidence that items or activities meet
specified requirements;
iv.) identifiable as a record;
v.) completely and accurately reflect the work accomplished or information
required;
vi.) legible;
vii.) traceable to associated requirements, items, and activities; and
viii.) authenticated and dated by authorized personnel.
d. Acceptable methods of authentication include statements of authenticity,
handwritten signatures, electronic signatures, or other means that ensure
traceability to a specific authenticating individual and organization and to an
authentication date.
3.15 ASSESSMENTS
Processes for management assessments and independent assessments shall be
established and documented to
a. plan and conduct assessments;
b. evaluate item and service quality;
c. evaluate the adequacy of work performance;
d. promote improvement;
e. verify the adequacy of flow-down of NAP-24 requirements to their
implementing procedures; and
f. report organizational performance to WQAP requirements.
3.15.1 Management Assessments
a. Managers shall assess their management processes by performing management
assessments.
b. Management responsible for the area assessed shall ensure that corrective actions
are taken to correct and eliminate nonconformances and their causes.
Attachment 2 NAP-24
A2-22 6-20-13
3.15.2 Independent Assessments
Personnel performing independent assessments shall have sufficient authority and
freedom from the line organization to carry out their responsibilities.
3.15.3 Assessor Qualification
Personnel conducting assessments shall be technically qualified and knowledgeable in the
areas assessed.
3.15.4 Scheduling
a. Risk shall be used as a basis for scheduling management and independent
assessments.
b. The management and independent assessment schedules and associated risk bases
shall be documented.
3.15.5 Planning
a. Management and independent assessment plans shall be established and
documented.
b. The plans shall identify the objectives, scope, approach, and performance criteria
to be used.
3.15.6 Performance
Section 15
a. Management and independent assessments shall compare actual performance
with performance criteria.
b. Objective evidence shall be examined to the depth necessary to determine if
requirements and criteria are being met.
c. Conditions requiring prompt corrective action shall be reported immediately to
management of the assessed organization.
3.15.7 Reporting
Management and independent assessment reports shall be sent to the responsible
management.
3.16 SOFTWARE QUALITY ASSURANCE
a. A Software Quality Assurance (SQA) process shall be established to provide
assurance that software will satisfy customer requirements for software that is
purchased, developed under contract, or developed by NNSA or its contractors.
NAP-24 Attachment 2
6-20-13 A2-23
b. The SQA process shall address applicable elements of NAP-24.
c. Software that is both safety and weapon related shall also meet the requirements
of Attachment 4 of DOE O 414.1D, Safety Software Quality Assurance
Requirements for Nuclear Facilities.
d. SQA activities shall be commensurate with the complexity and the risk associated
with failure of the software to meet established requirements.
e. A documented risk-based approach shall be used to balance cost, risk and
program flexibility.
f. The SQA process shall use a software life-cycle management methodology based
upon a consensus SQA standard or an equivalently rigorous contractor-specific
standard that addresses software development from beginning to end and the flow
of activities and iterations for the software life cycle.
g. Requirements shall be identified, testable, and controlled.
h. Software configuration management shall ensure
i.) a software baseline is established no later than the completion of the
software validation process; and
ii.) changes subsequent to the baseline are traceable to software requirements,
approved, documented, and added to the baseline so that the baseline defines
the most recently approved software configuration.
i. Software verification and validation activities shall be controlled,
documented, and demonstrate that requirements are met.
4.0 RESPONSIBILITIES
4.1 NNSA ADMINISTRATOR
The NNSA Administrator (NA-1) shall promote quality principles and support resources
needed for an effective WQMS.
4.2 DEPUTY ADMINISTRATORS AND CONTRACTOR MANAGERS
Deputy Administrators and Contractor Managers shall
a. actively participate in the WQMS development, implementation and
improvement; and
b. review the organization’s WQMS at planned intervals to ensure its continuing
adequacy and effectiveness.
Attachment 2 NAP-24
A2-24 6-20-13
4.3 NA-10, OFFICE OF DEFENSE PROGRAMS, ASSISTANT DEPUTY
ADMINISTRATORS
The Assistant Deputy Administrators shall
a. identify the senior management position specifically assigned
responsibility for developing and maintaining the WQAP;
b. review and approve their WQAPs;
c. review and address annual management assessment results, continuous
improvement initiatives and WQMS and weapon activity metrics and
provide upon request to HQ WQD; and
d. take appropriate action to determine the cause(s) of recurring nonconformances
and correct the systemic problem.
4.4 NA-121.3, WEAPON QUALITY DIVISION
The HQ WQD shall
a. maintain and issue NAP-24, Weapon Quality Policy and revisions;
b. resolve situations where other requirements conflict with NAP-24 requirements;
c. resolve requests for exemption from a NAP- 24 requirement; and
Section 16
d. evaluate the effectiveness of the NNSA WQMS through the conduct of
assessments, the results of management assessments performed by NSE
management organizations, NSE-wide metrics and nonconformances.
4.5 CONTRACTING OFFICERS
The NNSA Contracting Officers (CO) shall
a. include NAP-24 in applicable NNSA procurements and contract documents;
b. apply the provisions of NAP-24 to awards having applicable work scope; and
c. accept weapon product on behalf of NNSA or formally delegate to an NNSA
official.
NAP-24 Attachment 2
6-20-13 A2-25
4.6 NA-00-LL/KC/SV/NS/SN/LA/NPO, FIELD/PRODUCTION OFFICE MANAGERS
The Field/Production Office Managers shall
a. identify the senior management position specifically assigned
responsibility for developing and maintaining the WQAP, submitting the
WQAP and implementing the WQAP;
b. review and approve Field/Production Office and Contractor WQAPs;
c. perform independent assessments of their Contractor(s) to evaluate the
adequacy of WQAP implementation, and weapon activity work
performance and submit the assessment report to the assessed Contractor
and HQ WQD; and
d. maintain annual management assessment results, continuous improvement
initiatives, and WQMS and weapon activity metrics for the
Field/Production Office and its Contractor(s) and provide on request to
HQ WQD.
4.7 CONTRACTORS
Contractors shall
a. implement and convey requirements of NAP-24 to their various
organizations and subcontractors;
b. formally submit weapon and weapon-related products per the direction of
their Field/Production Office;
c. be responsible for the quality of material procured or produced and for
performing corrective actions if later evaluations reveal defective material
(even after NNSA product acceptance); and
d. maintain annual management assessment results, continuous improvement
initiatives, and WQMS and weapon activity metrics and provide on
request to their Field/Production Office.
1. purpose
2. CANCELLATION
3. APPLICABILITY
4. REQUIREMENTS
5. RESPONSIBILITIES
6. References
7. Definitions
8. Contact
1.0 PURPOSE
Attachment 2 provides the weapon quality requirements as required by NAP-24, Weapon Quality Policy.
1.1 SCOPE
This document describes minimum quality requirements for the NNSA, NNSA contractors and subcontractors responsible for weapon life-cycle phases 1-7 activities (as defined in Supplemental Directive NA SD M 452.3-1, Defense Programs Business Requirement...
1.2 SUPPLEMENTAL POLICY AND CLARIFICATIONS
2.0 basic REQUIREMENTS
When choosing to use a graded approach
a. a risk-management process shall be used to analyze, determine and document the rigor of meeting the requirements of this NAP, provided the risk-management process can ensure there are no adverse impacts to the quality of weapon and weapon-related p...
b. the risk-management process and areas of graded rigor shall be documented in the Weapon Quality Assurance Program (WQAP).
2.2 WEAPON QUALITY MANAGEMENT SYSTEM
2.3 ORGANIZATION
2.4 EARLY AND CONTINUOUS APPLICATION OF QUALITY PRINCIPLES
2.5 ESTABLISHING AND VALIDATING REQUIREMENTS
2.6 PLANNING
3.1 QUALITY IMPROVEMENT
3.1.1 Continuous Improvement Process
3.1.2 Prevention Versus Detection
The WQMS shall
3.1.3 Metrics
NNSA, NNSA contractors and subcontractors shall identify, document, track, trend, and maintain WQMS metrics and utilize them for corrective action, continuous improvement and objective evidence of performance.
Section 17
3.2 TRAINING
3.3 DESIGN
3.3.1 Design Input
3.3.2 Design Process
3.3.3 Design Verification
3.3.6 Design Documents
3.3.7 Design Change Control and Configuration Management
3.3.8 Interface Control
3.3.9 Design Records
3.4 INSTRUCTIONS, PROCEDURES AND DRAWINGS
3.5 DOCUMENT CONTROL
3.6 PROCUREMENT
3.6.1 Supplier Evaluation, Selection, and Monitoring
3.6.2 Procurement Documentation
3.6.3 Acceptance of Procured Items and Materials
3.6.5 Certificate of Conformance
3.7 IDENTIFICATION, CONTROL, AND STATUS OF ITEMS
3.7.4 Tooling and Fixtures
3.7.5 Limited-Life Materials and Components
3.7.6 Materials or Items Designated for Destructive Testing
3.7.7 Special Instructions and Environments
3.8 CONTROL OF PROCESSES
3.8.1 Process Control Methods
3.8.2 Special Processes
3.9 INSPECTION, TEST, AND ACCEPTANCE
3.10 CONTROL OF MEASURING AND TEST EQUIPMENT
3.11 HANDLING, STORAGE, PACKAGING, AND DELIVERY
3.11.1 Government-Furnished Material
3.11.2 NNSA-Accepted Material
3.12 NONCONFORMANCE
3.12.1 Nonconforming Item Control
3.12.2 Nonconforming Item Disposition
3.13 CORRECTIVE ACTION
3.14 RECORDS
3.15 ASSESSMENTS
3.15.3 Assessor Qualification
3.15.4 Scheduling
3.15.6 Performance
3.15.7 Reporting
3.16 SOFTWARE QUALITY ASSURANCE
4.1 NNSA ADMINISTRATOR
4.2 DEPUTY ADMINISTRATORS AND CONTRACTOR MANAGERS
4.3 NA-10, OFFICE OF DEFENSE PROGRAMS, ASSISTANT DEPUTY ADMINISTRATORS
The Assistant Deputy Administrators shall
a. identify the senior management position specifically assigned responsibility for developing and maintaining the WQAP;
b. review and approve their WQAPs;
c. review and address annual management assessment results, continuous improvement initiatives and WQMS and weapon activity metrics and provide upon request to HQ WQD; and
d. evaluate the effectiveness of the NNSA WQMS through the conduct of assessments, the results of management assessments performed by NSE management organizations, NSE-wide metrics and nonconformances.
4.5 CONTRACTING OFFICERS
4.6 NA-00-LL/KC/SV/NS/SN/LA/NPO, FIELD/PRODUCTION OFFICE MANAGERS
a. identify the senior management position specifically assigned responsibility for developing and maintaining the WQAP, submitting the WQAP and implementing the WQAP;
b. review and approve Field/Production Office and Contractor WQAPs;
c. perform independent assessments of their Contractor(s) to evaluate the adequacy of WQAP implementation, and weapon activity work performance and submit the assessment report to the assessed Contractor and HQ WQD; and
d. maintain annual management assessment results, continuous improvement initiatives, and WQMS and weapon activity metrics for the Field/Production Office and its Contractor(s) and provide on request to HQ WQD.
4.7 CONTRACTORS
Contractors shall
a. implement and convey requirements of NAP-24 to their various organizations and subcontractors;
b. formally submit weapon and weapon-related products per the direction of their Field/Production Office;
c. be responsible for the quality of material procured or produced and for performing corrective actions if later evaluations reveal defective material (even after NNSA product acceptance); and
d. maintain annual management assessment results, continuous improvement initiatives, and WQMS and weapon activity metrics and provide on request to their Field/Production Office.