NAP 540.3A, Corporate Performance Evaluation Process for Management and Operating Contractors
To establish and implement a uniform, corporate process for evaluation of National Nuclear Security Administration (NNSA) management and operating (M&O) contractors' performance that results in a documented, consistent, and fair evaluation aligned with the Federal Acquisition Regulation (FAR), Department of Energy (DOE) Acquisition Regulation (DEAR), and related DOE directives and NNSA policies.
Supersedes:
Version history and related documents
Supersedes
Earlier documents this one replaced.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
NNSAPOLICY
NAP 540.3A
Approved: 09-04-24
Certification Due: 09-04-27
CORPORATE PERFORMANCE EVALUATION
PROCESS FOR MANAGEMENT AND
OPERATING CONTRACTORS
~•\5M
'1""~1 ... ~~
National Nuclear Security Administration
NATIONAL NUCLEAR SECURITY ADMINISTRATION
Office of Partnership and Acquisition Services
CONTROLLED DOCUMENT
AVAILABLE ON-LINE AT:
https:\ \directives.nnsa.doe.gov
OFFICE OF PRIMARY INTEREST (OPI):
Office of Partnership and Acquisition Services_
THIS PAGE INTENTIONALLY LEFT BLANK
NAP 540.3A
09-04-24
CORPORATE PERFORMANCE EVALUATION PROCESS FOR MANAGEMENT
AND OPERATING CONTRACTORS
1. PURPOSE. To establish and implement a uniform, corporate process for evaluation of
National Nuclear Security Administration (NNSA) management and operating (M&O)
contractors' performance that results in a documented, consistent, and fair evaluation
aligned with the Federal Acquisition Regulation (FAR), Department of Energy (DOE)
Acquisition Regulation (DEAR), and related DOE directives and NNSA policies.
2. CANCELLATION. NNSAPolicy (NAP) 540.3, Corporate Performance Evaluation
Process For Management and Operating Contractors, dated 12-22-16.
3. AUTHORITY. This NNSA Policy (NAP) is written under 50 United States Code
(U.S.C.) 2402(d), which gives the Administrator authority to establish NNSA-specific
policies, unless disapproved by the Secretary.
4. APPLICABILITY.
a. Federal. Applies to all NNSA Federal organizations involved in oversight or
evaluation of NNSA M&O Contractor performance, including subcontractor
performance.
b. Contractor. Does not apply to contractors.
c. Equivalencies.
(1) In accordance with the responsibilities and authorities assigned by
Executive Order 12344, codified at 50 United States Code sections 2406
and 2511, and to ensure consistency throughout the joint Navy /DOE
Naval Nuclear Propulsion Program, the Deputy Administrator for Naval
Reactors (Director) will implement and oversee requirements and
practices pertaining to this Directive for activities under the Director's
cognizance, as deemed appropriate.
1
(2) For non-NNSA M&O Contractors performing work for NNSA, NNSA will
follow the Cognizant Program Secretarial Officer's equivalent process,
unless NNSA and the non-NNSA office have an agreement regarding
contract administration.
(3) Award fee determinations for Capital Asset Acquisitions with a separate
fee structure and performance evaluation process will be made by the
NNSA Fee Determining Official, unless otherwise delegated.
d. Exemptions.
Contract Line Item Numbers (CLINs) within NNSA's M&O contracts that
do not have an award fee component (i.e., firm-fixed-price, cost-plus-
2 NAP 540.3A
09-04-24
fixed-fee, etc.), and therefore do not require an award fee determination,
are exempt from the Corporate Performance Evaluation Process (CPEP).
5. SUMMARY OF CHANGES. This revision incorporates process improvements
identified through lessons learned and best practices observed and integrates
transparency enhancements identified and implemented through a CPEP Integrated
Project Team (IPT). This revision also adds, revises, and clarifies responsibilities to
align the policy with current organizational structures and practices.
6. REQUIREMENTS. The CPEP is an integrated process applied consistently by all
NNSA organizations. The CPEP and the related performance evaluation and
measurement plans (PEMPS) for each M&O contract must, unless an approved
deviation is granted by the Senior Procurement Executive (SPE), follow the format
and boundaries described here:
Section 2
a. Final CPEP documents must be consistent with pre-formatted templates
provided through the CPEP annual implementation guidance.
b. Boundaries.
(1) Supplemental CPEP annual implementation guidance including schedules,
templates, and other detailed guidance, must be prepared by the Office of
Partnership and Acquisition Services (NA-PAS) and approved by the Fee
Determining Official (FDO).
(2) PEMPs represent a performance-based approach to evaluate M&O
contractor performance through a set of Goals. Each Goal, and its
associated Objectives and Key Outcomes must be measured against
authorized and executed work, demonstrated performance, and effect on the
NNSA mission.
(3) Award fee allocated to a specific Goal must be reflective of the actual
value or importance of the work with due consideration for financial and
operational challenges at the laboratory, plant, or site.
( 4) The CPEP and its outputs must be consistent with FAR and DEAR
requirements, all contract terms and conditions, and related policies.
(5) Baseline performance expectations must be established and communicated
at the beginning of the evaluation period to equitably measure
performance, and changes to that baseline must be carefully managed.
Any content changes to the PEMP require concurrence by the effected
DOE/NNSA Stakeholder Organization(s) (i.e., Program Office, Functional
Office, other DOE Office), the NNSA SPE, and approval by the FDO,
prior to executing signatures by the Field Office Manager (FOM),
Contracting Officer (CO), and M&O Contractor. Revisions to the PEMP,
representing administrative wording changes only, must be approved by
the NNSA SPE but do not require FDO approval.
NAP 540.3A
09-04-24
(6)
(7)
(8)
(9)
Performance monitoring and reporting must take place continuously, in
real-time throughout the year, with limited intervals reserved for formal
performance feedback that highlights accomplishments and issues for
additional contractor emphasis. Formal feedback intervals may also
highlight areas where performance met requirements and expectations, as
appropriate (i.e., Key Outcomes).
At the end of the evaluation period, when the award fee determination is
made, Objectives and Key Outcomes must be assessed in the aggregate to
establish an adjectival and numerical performance rating for each Goal.
3
All Goal ratings must be aggregated to determine an overall adjectival and
numerical performance rating. Notwithstanding the strategic CPEP
framework, any significant performance failure may limit the overall rating
and award fee earned for the evaluation period.
The adjectival performance ratings must be determined using the
definitions in FAR Subpart 16.401 ( e )(3) as supplemented by this NAP in
Appendix 1. The FDO has full discretion to adjust the recommended Goal
ratings and resulting earned award fee amounts.
The CPEP has four distinct phases as follows:
(a) The Planning Phase: Must be completed prior to the beginning of
the evaluation period and involves the following:
1 Review and incorporate lessons learned from the prior year;
2. Identify Objectives and Key Outcomes, informed by the
Planning, Programming, Budget, and Evaluation (PPBE)
process and associated draft Work Authorizations and
Implementation Plans;
3 Develop, review, and obtain FDO approval of PE MPs for
each NNSA M&O contract;
4 Establish the allocation of available at-risk award fee to
Goals within the PEMP in accordance with the contract; and
Section 3
5 Issue the PEMP to the M&O Contractor, with a preference
for bilateral agreement.
(b) The Monitoring Phase: Must take place during the evaluation
period and include formal periodic feedback to the M&O
Contractors provided through Interim Feedback Reports (IFR).
This phase must include:
4
(c)
1
2
3
NAP 540.3A
09-04-24
Oversight and monitoring of M&O Contractor performance
by all DOE/NNSA Stakeholder Evaluation Organizations
and Field Offices;
Leveraging Contractor Assurance Systems, other tools, and
other performance data and information by all DOE/NNSA
Stakeholder Evaluation Organizations and Field Offices to
monitor performance, as appropriate;
Formal interim feedback to the M&O Contractor; and
Coordination between offices to ensure NNSA speaks with
one voice. All DOE/NNSA Stakeholder Evaluation
Organizations and Field Offices must strive to reach
consensus on M&O Contractor performance, demonstrated
by concurrence on CPEP deliverables.
The Assessment Phase: Must begin at the end of the evaluation
period, in accordance with the terms and conditions of the contract,
and is when the FDO fee determination occurs, and the
Performance Evaluation Report (PER) is completed. This
includes:
1 M&O Contractor performance must be assessed by all
DOE/NNSA Stakeholder Evaluation Organizations and
Field Offices at the end of the evaluation period and
provide recommended adjectival and numerical ratings to
the SPE, and ultimately the FDO. Timely and effective
evaluation input is critical to a successful Assessment
Phase;
2 Coordination must occur between offices to ensure NNSA
speaks with one voice. All DOE/NNSA Stakeholder
Evaluation Organizations and Field Offices must strive to
reach consensus on M&O Contractor performance,
demonstrated by concurrence on CPEP deliverables;
3 Adjudication must be made by the FDO if concurrence is
notreached;and
4 FDO must determine the final performance ratings and
earned fee amounts.
(d) The Post-Assessment Phase: Must begin after the FDO approves
the performance ratings, earned fee amounts, and contract award
term(s) (where applicable) for the M&O Contractors. Deliverables
must include:
NAP 540.3A
09-04-24
1
2
4
Fee determination memorandum to the M&O Contractor;
PER to the M&O Contractor;
Executing Contract Modification containing Earned Fee
amounts and contract award term extensions (where
applicable);
Posting Performance Evaluation Summaries (PES) to
NNSA's public site; and
Posting Redacted Performance Evaluation Reports to
NNSA's Freedom oflnformation Act (FOIA) Reading
Room (when applicable).
5
7. RESPONSIBILITIES.
a. Fee Determining Official (FDO).
b.
(1) Approves annual implementation guidance;
(2) Approves initial PEMPs and mid-year PEMP content revisions for
signature;
(3) Signs fee determination memorandums, establishing final performance
ratings, earned fee amounts, and contract award term(s), where applicable,
for all NNSA M&O contracts;
(4) Approves release of the IFRs and PERs to the M&O Contractors;
(5) Dispositions unearned fees; and
(6) Adjudicates nonconcurrences between DOE/NNSA Stakeholder
Evaluation Organizations and Field Offices.
Senior Procurement Executive (SPE).
(1) Responsible for NNSA's CPEP policy, and implementation of the CPEP;
(2) Reviews annual implementation guidance and recommends FDO approval;
(3) Reviews proposed PEMP content revisions made during the performance
period, prior to submission to the FDO for approval;
Section 4
( 4) Approves administrative PEMP revisions made during the performance
period;
(5) Reviews draft IFRs, PERs, PESs, fee determination memorandums, and
FDO briefings prior to submission to the FDO;
6
C.
(6)
(7)
(8)
(9)
NAP 540.3A
09-04-24
Obtains and communicates approval of PERs and fee determination
memorandums to the Field Office Managers;
Attends FDO strategy sessions, award fee determination meeting(s), and
other CPEP-related meetings, as appropriate;
Reviews M&O Contractor performance evaluation documents with Field
Offices prior to public release; and
Submits CPEP packages to FDO through NNSA Executive Secretariat
process, as applicable.
Field Office Manager.
(1) Oversees the performance evaluation of the M&O Contractor;
(2) Coordinates closely with DOE/NNSA Stakeholder Evaluation
Organizations throughout CPEP phases;
(3) Collaborates with M&O Contractor to develop strategic Objectives and
Key Outcomes in drafting the PEMP;
(4) Collaborates with DOE/NNSA Stakeholder Evaluation Organizations to
develop the draft PEMP, IFR(s), and PER, striving to reach consensus;
(5) Presents draft PEMP, and subsequent changes, to NA-PAS for other
DOE/NNSA Stakeholder Evaluation Organizations' formal concurrences
prior to submission for FDO approval;
(6) Develops IFR and PER briefings, incorporating other DOE/NNSA
Stakeholder Evaluation Organizations' inputs for their respective equities,
and obtains their concurrences prior to finalization of documents and
submission to NA-PAS;
(7) Briefs IFR(s) and PER evaluations, including award fee recommendations,
to the FDO;
(8) Coordinates with M&O Contractor to obtain factual accuracy review of
draft IFR(s) and PER;
(9) In the event the FDO Meeting or M&O Contractor factual accuracy
reviews result in content changes to the IFR(s) or PER, incorporates and
submits changes to effected DOE/NNSA Stakeholder Evaluation
Organizations for updated concurrences prior to submitting final reports to
NA-PAS; and
NAP 540.3A 7
09-04-24
d.
e.
f.
( 10) Monitors M&O Contractor performance and provides real-time
performance feedback with one NNSA voice through appropriate contract
channels, as necessary.
DOE/NNSA Stakeholder Evaluation Organization.
(1) Identifies program requirements/technical activities that are suitable for
annual performance evaluation criteria (i.e., PEMP Goals, Objectives, and
Key Outcomes);
(2) Aligns performance evaluation criteria with program baseline cost, scope,
and schedule, and ensures consistency with Work
Authorizations/Implementation Plans and other applicable contract
requirements documents, to enable effective evaluation of M&O
Contractor performance;
(3) Participates in development of PEMP Goals, Objectives, and Key
Outcomes for the applicable areas of ownership/responsibility in
coordination with Field Office(s);
(4) Collaborates with the Field Offices to develop draft CPEP deliverables (i.e.,
IFR and PER) for respective areas of equity and concurs on final draft
CPEP documents;
(5) Participates in Field Office feedback sessions with M&O Contractors
when IFRs and PERs are issued, as necessary; and
(6) Monitors M&O Contractor performance and provides real-time
performance feedback with one NNSA voice through appropriate contract
channels, as necessary.
Management and Budget (NA-MB).
Coordinates with NA-PAS and the Field Offices for the disposition of
unearned award fees.
CPEP Program Manager.
(1) Prepares CPEP annual implementation guidance for SPE review and FDO
approval;
Section 5
(2) Assists with the dissemination of CPEP guidance documents and related
information to CPEP Coordinators;
(3) Performs logistics for and facilitates FDO Meetings for the PEMP, IFR(s),
and PER;
8
g.
(4)
(5)
(6)
NAP 540.3A
09-04-24
Reviews draft PEMPs, IFRs, and PERs prior to submission to the SPE for
review, and submission to the FDO for approval; prepares and facilitates
SPE and FDO pre-briefings, as needed;
Notates FDO requested actions resulting from FDO Meetings,
disseminates actions to applicable Field Offices and affected DOE/NNSA
Stakeholder Evaluation Organizations, and briefs the FDO on associated
resolutions;
Conducts lessons learned sessions with CPEP Coordinators and NNSA
Organizational Leadership, as necessary;
(7) Coordinates and facilitates situational meetings, as necessary, between
Field Offices and DOE/NNSA Stakeholder Evaluation Organizations in an
effort to reach consensus at a level below the FDO when nonconcurrences
anse;
(8) Leads weekly and ad hoc calls with CPEP Coordinators to obtain or
provide status updates, provide guidance interpretations, answer questions,
and address concerns;
(9) Coordinates with applicable NNSA Organizations (e.g., Office of
Congressional and Intergovernmental Affairs, Office of Communications,
NNSA General Counsel, etc.) to upload public-facing CPEP deliverables
(e.g., PEMPs and Performance Evaluation Summaries) to NNSA's public
website;
(10) Coordinates with NNSA General Counsel and affected Field Offices to
fulfill or respond to CPEP-related Freedom of Information Act requests;
(11) Coordinates with applicable NNSA Offices to fulfill CPEP-related
Congressional inquiries and DOE Office of Inspector General and
Government Accountability Office documentation and information
requests; and
(12) Provides CPEP group or individual trainings, upon request.
CPEP Coordinator.
(1) Serves as primary Field Office or DOE/NNSA Stakeholder Evaluation
Organization focal point for preparation ofCPEP deliverables;
(2) Coordinates timely PEMP development and IFR/PER inputs with
respective organizational Subject Matter Experts (SMEs), Managers,
Directors, and Leadership;
(3) Provides CPEP training to respective organizational SMEs, Managers,
Directors, and Leadership, as needed; and
NAP 540.3A
09-04-24
(4) Participates in weekly and ad hoc calls held by the CPEP Program
Manager to obtain or provide status updates, ask questions, share best
practices, raise concerns, and relay updates to or from respective
Organizational Leadership.
h. Contracting Officer (CO).
1.
(1) Enters into, administers, or terminates contracts and makes related
determinations and findings, and obligates the government;
(2) Issues contract requirements and ensures program requirement
descriptions are compliant with performance-based contracting methods;
(3) Issues contract modifications for applicable fee-related matters in
accordance with Federal laws and regulations, agency policy, and the
terms and conditions of the contract;
( 4) Signs and issues the PEMP and ensures consistency with the terms and
conditions of the contract and applicable regulations and statutes;
(5) Issues IFR(s) and PER to M&O Contractor;
(6) Provides real-time performance feedback with one NNSA voice, as
necessary; and
(7) Serves as focal point for receipt of M&O Contractor's self-assessment
report.
Contracting Officer's Representative (COR).
(1) Serves as the communication link between the CO and the M&O
Contractor in accordance with the COR delegation letter from the CO;
Section 6
(2) Performs and documents oversight of M&O Contractor performance,
including identification of issues to be officially recognized in the
Contractor's Assurance System;
(3) Participates in PEMP development and identifies the need for interim
content changes to the PEMP, as necessary;
( 4) Develops M&O Contractor performance evaluation input in support of
IFR and PER development; and
(5) Monitors M&O Contractor performance and provides real-time
performance feedback with one NNSA voice through appropriate contract
chaimels, as necessary.
9
10 NAP 540.3A
09-04-24
8. REFERENCES.
a. FAR 16.4, Incentive Contracts
b. DEAR 970.1100-1, Performance-Based Contracting
9. CONTACT. Office of Partnership and Acquisition Services (NA-PAS), 202-586-4921
BY ORDER OF THE ADMINISTRATOR:
Appendixes
A. Fee Rating Definitions
B. Definitions •
~ill~
Jill Hruby
Administrator
NAP 540.3A
09-04-24
Excellent
Very Good
Good
Satisfactory
Unsatisfactory
Appendix A
APA-1
APPENDIX A: FEE RATING DEFINTIONS
Supplemental Award Fee Rating Definitions
for NNSA Performance Evaluation and Measurement Plan (PEMP)
Contractor has exceeded almost all the objectives and key outcomes
under the goals in the PEMP and has met overall cost, schedule, and
91%- technical performance requirements of the contract in the aggregate
100
for the evaluation period. This performance level is evidenced by at
least one significant accomplishment, or a combination of
accomplishments that significantly outweigh very minor issues, if
any. No significant issues in performance exist.
Contractor has exceeded many of the objectives and key outcomes
under the goals in the PEMP and has met overall cost, schedule, and
76%- technical performance requirements of the contract in the aggregate
90% for the evaluation period. This performance level is evidenced by
accomplishments that greatly outweigh issues. No significant issues
in performance exist.
Contractor has exceeded some of the objectives and key outcomes
under the goals in the PEMP and has met overall cost, schedule, and
51%- technical performance requirements of the contract in the aggregate
75% for the evaluation period. This performance level is evidenced by
accomplishments that slightly outweigh issues. No significant issues
in performance exist.
No
Contractor has met overall cost, schedule, and technical performance
greater
requirements of the contract in the aggregate as defined and
than
measured against the objectives and key outcomes under the goals in
50%
the PEMP for the evaluation period. This performance level is
evidenced by issues that slightly outweigh accomplishments.
Contractor has failed to meet overall cost, schedule, and technical
performance requirements of the contract in the aggregate as defined
0% and measured against the objectives and key outcomes under the
goals in the PEMP for the award-fee evaluation period. This
performance level is evidenced by issues that significantly outweigh
accomplishments, if any.
THIS PAGE INTENTIONALLY LEFT BLANK
NAP 540.3A
09-04-24
APPENDIX B: DEFINITIONS
AppendixB
APB-1
a. Accomplishment. An achievement or success in the performance of contract
requirements that exceeds standards or expectations. Examples might be performing
full contract requirements under budget while meeting or beating schedule baselines or
performing additional scope within the initial cost targets with no negative effect on
requirements or other programs, indicating continued performance improvement.
Section 7
b. DOE/NNSA Stakeholder Evaluation Organizations. All NNSA Program and
Functional Offices and other DOE Offices ( e.g., DOE Office oflntelligence, DOE
Office of Science, etc.) that have equity in NNSA's M&O Contractor PEMPs.
c. Fee allocation. The amount of award (at-risk) fee available to be earned by an M&O
Contractor for a specific PEMP Goal.
d. Goal. Top Level strategic elements that cover broad performance areas and are related
to mission accomplishment, operational excellence, or management of a
laboratory/plant. Each element is usually described by a general overarching statement
of the desired performance. Ratings for these elements are determined by aggregating
all performance evaluations for applicable Objectives and Key Outcomes. These
elements are not generally site specific; however, under certain circumstances the SPE
may authorize use of a site-specific Goal(s).
e. Interim Feedback Report (IFR). A periodic report provided to the M&O Contractor
during the evaluation period highlighting accomplishments, issues, and areas where
performance met requirements/expectations. The IFR period and frequency is
established through the FDO's annual implementation guidance.
f. Issue. A point in question or a matter that raises concerns regarding successful
performance of contract requirements within scope, cost, and schedule baselines or
concern of negative effect on requirements or other programs, indicating a decline in
performance that needs attention and improvement.
g. Key Outcome. Elements that serve to highlight very specific performance outcomes
that require attention from senior laboratory/plant/site leadership. These outcomes
may relate to major program or project milestones or to specific improvements in
performance of a Goal or Objective. These elements must be clearly linked to a Goal
or Objective, are site specific, and updated annually. They must also be objective in
nature with identifiable, achievable, and measurable outcomes that represent NNSA
strategic priorities.
h. Objective. Performance areas against which an M&O Contractor is evaluated by
NNSA. These elements outline desired results and more specific performance
outcomes than Goals. These elements may be site-specific.
AppendixB
APB-2
NAP 540.3
09-04-24
1. Significant Accomplishment. An achievement or success significantly above
requirements or expectations. This could include completing a project significantly
under budget and ahead of schedule or exceeding expectations while overcoming
significant complexities/challenges to complete requirements.
J. Significant Issue. A failure to meet program, mission, contract, safety, security, or
quality requirements. Examples of a significant issue include, without limitation:
death or serious permanent personal injury; off-site environmental release of a
hazardous material from a DOE facility; material loss or damage to DOE property; an
unplanned nuclear criticality event; loss, compromise, or unauthorized disclosure of
information to include Top Secret Restricted Data, Top Secret, Sensitive
Compartmented Information (SCI), Special Access Program (SAP) information, or
high-risk nuclear weapons-related data; failure to meet an NNSA-negotiated delivery
schedule for the Department of Defense or other national security customers.
1. PURPOSE.
2. CANCELLATION.
3. AUTHORITY.
4. APPLICABILITY.
5. SUMMARY OF CHANGES.
6. REQUIREMENTS.
7. RESPONSIBILITIES.
a. Fee Determining Official (FDO).
b. Senior Procurement Executive (SPE).
c. Field Office Manager.
d, DOE/NNSA Stakeholder Evaluation Organization.
e. Management and Budget (NA-MB).
f. CPEP Program Manager.
g. CPEP Coordinator.
h. Contracting Officer (CO).
i. Contracting Officer's Representative (COR).
8. REFERENCES.
9. CONTACT.
APPENDIX A: FEE RATING DEFINTIONS
APPENDIX B: DEFINITIONS