SD 226.1B, NNSA Site Governance
This supplemental directive (SD) establishes the National Nuclear Security Administration (NNSA) Site Governance Model as the system that the Federal government and NNSA’s contractor partners work within to help assure effective mission performance and operational excellence. The SD supplements the requirements of Department of Energy (DOE) Policy (P) 226.1B, Department of Energy Oversight Policy and DOE Order (O) 226.1B, Implementation of DOE Oversight Policy.
Cancels NA-1 SD 226.1A, NNSA Line Oversight and Contractor Assurance System Supplemental Directive, dated 10-17-08 and NAP-21, Transformational Oversight and Governance, dated 2-28-11.
Associated DOE Directive:
Related To:
Version history and related documents
Related documents
- SD 450.2 Admin Chg 1Functions, Responsibilities and Authorities (FRA) Document for Safety Management
- SD 251.1 Admin Chg 1Policy Letters: NNSA Policies, Supplemental Directives, and Business Operating Procedures
- SD 226.1-1AHeadquarters Biennial Review of Nuclear Safety Performance
- BOP 10.003Site Integrated Assessment Plan (SIAP) Development, Updating and Reporting
- BOP-001.331Budget Execution Headquarters Approved Funding Program (HQ AFP) and Work Authorization (WA) Business Operation Policy
- NAP-21Transformational Governance and Oversight
- NAP-21Transformational Governance and Oversight
- NAP 413.2Program Management Policy
- NAP 413.2 (Recertified)Program Management Policy
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
CONTROLLED DOCUMENT OFFICE OF PRIMARY INTEREST (OPI):
AVAILABLE ONLINE AT: Office of Safety, Infrastructure and Operations
https://nnsa.energy.gov/aboutus/ouroperations/managementandbudget/supplementaldirectives
printed copies are uncontrolled
SUPPLEMENTAL DIRECTIVE
Approved: 8-12-16
NNSA Site Governance
NATIONAL NUCLEAR SECURITY ADMINISTRATION
Office of Safety, Infrastructure and Operations
NNSA SD 226.1B
https://nnsa.energy.gov/aboutus/ouroperations/managementandbudget/supplementaldirectives
THIS PAGE INTENTIONALLY LEFT BLANK
NNSA SD 226.1B 1
8-12-16
NNSA SITE GOVERNANCE
1. PURPOSE. This supplemental directive (SD) establishes the National Nuclear Security
Administration (NNSA) Site Governance Model as the system that the Federal
government and NNSA’s contractor partners work within to help assure effective mission
performance and operational excellence. The SD supplements the requirements of
Department of Energy (DOE) Policy (P) 226.1B, Department of Energy Oversight Policy
and DOE Order (O) 226.1B, Implementation of DOE Oversight Policy.
2. CANCELLATION.
a. NA-1 SD 226.1A, NNSA Line Oversight and Contractor Assurance System
Supplemental Directive, dated 10-17-08.
b. NNSA Policy (NAP)-21, Transformational Oversight and Governance, dated
2-28-11.
Cancellation of a directive does not, by itself, modify or otherwise affect any contractual
or regulatory obligation to comply with the directive. Contractor Requirements
Documents (CRDs) previously incorporated into a contract remain in effect throughout
the term of the contract unless and until the contract or regulatory commitment is
modified to either eliminate requirements that are no longer applicable or substitute a
new set of requirements.
3. APPLICABILITY.
a. Federal. This SD applies to all Federal NNSA personnel who are involved on
behalf of NNSA in managing, overseeing, or interfacing with NNSA Management
and Operating (M&O), prime security, and prime environmental management
contractors, and their sub-contractors.
b. Contractors. The CRD provided as Attachment 1 of this SD sets forth
requirements of this directive that apply to NNSA M&O, prime security, and
prime environmental management contractors, referred to as “contractors”
throughout this SD.
The CRD must be included in M&O, prime security, and prime environmental
management contracts with NNSA.
Contractor corporate parent(s). This SD applies to the extent specified in the
contract.
c. Federal and contractor employees at NNSA-owned facilities.
d. Equivalency. In accordance with the responsibilities and authorities assigned by
Executive Order 12344, codified at 50 United States Code sections 2406 and 2511
and to ensure consistency through the joint Navy/DOE Naval Nuclear Propulsion
2 NNSA SD 226.1B
8-12-16
Program, the Deputy Administrator for Naval Reactors (Director) will implement
and oversee requirements and practices pertaining to this Directive for activities
under the Director's cognizance, as deemed appropriate.
4. SUMMARY OF CHANGES. This SD builds upon and incorporates NA-1 SD 226.1A
requirements, where applicable, for Federal oversight, assessment planning, operational
awareness activities, and contractor assurance. This SD emphasizes the role of the
contractor corporate parent(s), consistent with 3.b. above, and clarifies roles and
responsibilities of Federal and contractor partners in developing integrated and
transparent performance criteria that will result in improved mission outcomes. This SD
includes administrative changes to conform to the document format and content
requirements in NNSA SD 251.1, Policy Letters: NNSA Policies, Supplemental
Directives, and Business Operating Procedures.
Section 2
5. BACKGROUND. DOE P 226.1B established DOE’s expectations for the
implementation of a comprehensive and robust oversight process. DOE expects that the
contractor’s governance processes will provide reasonable assurance that the system of
management controls, when properly implemented, provides an effective and efficient
means of meeting applicable regulatory and mission requirements. NNSA leveraged key
successes from DOE organizations with responsibility for overseeing M&O contractors
to improve the Site Governance Model. These improvements, as laid out in SD 226.1B,
are intended to provide guidance and process requirements that will foster an effective
strategic relationship that involves timely, transparent, and open communications.
This SD relates specifically to the NNSA Site Governance Model, which consists of three
separate but linked systems: Federal oversight, contractor assurance, and contractor
corporate parent(s) oversight/assurance, that provide insight to mission performance.
6. REQUIREMENTS.
a. NNSA Site Governance Model
(1) NNSA must operate within a Site Governance Model that is comprised of
three overlapping evaluative systems focused on continuous improvement
of all activities and functional areas that can affect mission reliability: (1)
the Federal NNSA team including program, functional, and field offices;
(2) the contractor partner operating the sites or facilities; and (3) the
contractor partner corporate parent(s), as specified by contract. Effective
governance requires that all three entities work together to ensure reliable
mission performance. (Attachment 2 of this SD provides details.)
(2) The depth of federal oversight must be determined based on the
demonstrated strength of the contractor’s management systems and the
risks associated with less than satisfactory performance. High risk
activities and areas with significant performance weaknesses must be
evaluated to determine the necessary activity-specific oversight, as defined
by the Federal Oversight Description Document.
NNSA SD 226.1B 3
8-12-16
(3) The Site Governance System must be transparent and encourage
efficiencies. Data generated from oversight and assurance activities must
be shared to allow each partner to identify positive and adverse indicators
and opportunities for improvement.
b. Contractor Site Level Assurance System
(1) The contractor’s internal assurance system must help the contractor
identify, prioritize, and address issues which will affect mission
performance. These include safety, security, quality, or any other
operational/business issues that put or may put mission delivery at risk.
(2) The contractor’s assessment schedule for planned assessments must ensure
transparency and clarity on risks, prioritization, and resource allocation.
The rationale for planned assessments must be documented.
c. Federal Oversight System
(1) The site Federal Oversight System Description which describes processes
for evaluating contractor assurance, contractor performance and Federal
assessment activities must be developed in collaboration with the NNSA
field, functional, and program offices.
(2) Federal offices (program, functional, and field) must follow Business
Operating Procedure (BOP)-10.003, Site Integrated Assessment Plan
(SIAP) Development, Updating, and Reporting to identify oversight
activities.
d. Governance Peer Reviews
(1) NNSA field oversight and contractor assurance systems must undergo
peer review to evaluate implementation, to include the governance
attributes provided as Attachment 2 of this SD.
Section 3
(2) Peer review teams must include the site contractor and Federal employees
representing field offices, program, and functional offices, as available.
(3) Each peer review team must submit and brief its reports on oversight or
assurance to the Field Office Manager (FOM), the applicable program and
the functional office(s), the Principal Deputy Administrator, Field
Manager/Laboratory Director/Plant Manager, and the corporate parent
board chairperson or equivalent (if consistent with the contract).
7. RESPONSIBILITIES.
a. Office of Policy (NA-1.1)
(1) Review this SD periodically and make recommendations for any
4 NNSA SD 226.1B
8-12-16
necessary updates.
(2) Evaluate the NNSA Site Governance Model for improvement.
(3) Review and retain site Federal Oversight System Descriptions.
b. Office of Safety, Infrastructure & Operations (NA-50)
(1) Serve as the office of primary interest for this SD.
(2) Recommend revisions and review recommended revisions to this SD from
the contractor partners and NNSA offices. Resolve comments and
transmit recommendations in accordance with NNSA SD 251.1.
(3) Identify and incorporate governance best practices into this SD, as
applicable, and share lessons learned from one site to another.
(4) Develop training for NNSA organizations to assist their implementation of
the governance model.
(5) Review annually and update training, as necessary, to ensure continuous
improvement.
(6) Maintain awareness and oversight of field office operations and activities
per NA-1 SD 226.1-1A, Headquarters Biennial Review of Nuclear Safety
Performance, and unnumbered NA-50 document, Approach to Safety
Management Program Reviews.
c. NNSA Program Managers (PMs)
(1) Allocate and oversee appropriated funds to execute work at NNSA sites,
plants, and laboratories (as program office staff).
(2) Set program expectations, program goals and priorities, and integrate
overall program plans and priorities.
(3) Establish general and site-specific program requirements to include scope,
cost, and schedule; develop Program Implementation Plans and guidance
for inclusion in appropriate Work Authorizations (WA); and evaluate
contractor performance against program requirements.
(4) Provide technical direction, when necessary, to the contractor through an
authorized Contracting Officer Representative (COR) or the Contracting
Officer (CO) (with parallel communication to the field office(s)).
(5) Identify program needs. Determine site funding allocations, milestones,
and expectations for site performance.
NNSA SD 226.1B 5
8-12-16
(6) Track and evaluate program mission work performance by monitoring
progress on program goals and objectives.
(7) Work with field offices and Functional Managers (FMs) to negotiate
programmatic cross-site and site-specific performance goals and
objectives and to assess progress on these goals and objectives. Resolve
any mission impact due to Environment, Safety & Health (ES&H),
quality, or safeguards & security issues, and other functional or program
conflicts, considering input provided by the field office and the FMs.
(8) Seek out and consider input from the field offices and the FMs.
(9) Determine, on behalf of NNSA, whether actions taken or planned meet
requirements for their program.
d. NNSA Functional Managers (FMs)
(1) Oversee requirements in their functional areas and support site
implementation of cross-cutting functional areas (nuclear safety,
safeguards and security, cyber security, ES&H, quality, emergency
management, day-to-day operations/maintenance, business and contract
management) to accomplish NNSA’s mission.
Section 4
(2) Coordinate with field offices and PMs to ensure strong functional area
performance at the sites.
(3) Ensure functional considerations (safety/security/quality) are fully
integrated in the field oversight process.
(4) Interpret, on behalf of NNSA, whether actions taken or planned meet
requirements in their functional area.
(5) Maintain awareness and oversight of field office operations and activities
through the survey/self/assessment requirements identified in DOE O
470.4B Admin Chg 1, Safeguards and Security Program. (Defense
Nuclear Security, NA-70)
e. Field Office Managers (FOMs)
(1) Ensure the effectiveness of the NNSA Site Governance Model at their
assigned site.
(2) Serve as the primary point of contact between NNSA and contractor
leadership by maintaining consistent and open communication, fulfilling
long-term site stewardship responsibilities, and performing critical
functions while promoting continuity during contract transition.
(3) Lead the evaluation of the contractor’s overall performance, including the
6 NNSA SD 226.1B
8-12-16
evaluation of and the use of contractor assurance system (CAS).
(4) Approve the site Federal Oversight System Description and forward
documentation to NA-1.1.
(5) Perform system level oversight and drive performance through evaluation
and engagement in nuclear safety and security while promoting efficient
and effective mission performance across all programmatic areas.
(6) Oversee operations conducted at the site and collaborate with PMs and
FMs on issues where programmatic efforts may conflict with
safety/security/quality concerns and mission needs.
(7) Actively support the program offices and strive to enhance and reinforce
information sharing between PMs and the contractor.
(8) Balance programmatic execution against risks or concerns associated with
operations and cross-cutting mission functions. Integrate operational
decision-making at the site.
(9) Accept, on behalf of NNSA, the risks associated with operations under
their delegated authority. Exercise the resources needed to address any
undesirable consequences, subject to concurrence of other affected line
managers.
(10) Ensure the COR effectively represents the PMs, FMs, and FOM
requirements for the contractor.
(11) Ensure that the CO incorporates the CRD into the contract. The Kansas
City Field Office (KCFO) Manager reviews the requirements of this SD in
accordance with the KCFO Operating Requirements Review Board
process for applicability to the Kansas City National Security Campus
contract.
(12) Evaluate and approve the CAS description document that addresses and
meets this SD. The CAS description must also meet the governance
attributes provided as Attachment 2 of this SD.
f. NNSA FOMs, PMs and FMs
(1) Share in the responsibility and accountability for mission accomplishment
and site stewardship.
(2) Engage directly and routinely with the federal team (program, functional,
and field offices). Collaborate with each other to provide continuous
oversight of mission performance while maintaining a DOE/NNSA
enterprise-wide focus. Deliver consistent performance feedback to the
contractor partners.
NNSA SD 226.1B 7
8-12-16
(3) Work with PMs to resolve issues when the intended program scope may
not be achievable or optimal. Must receive PM agreement prior to
changing scope.
(4) Assess their staffing needs to determine whether there are sufficient,
qualified personnel to conduct oversight activities consistent with
comprehensive policies and guidance. Oversight may include review of
and insights from CAS performance data.
Section 5
(5) Produce written assessment plans consistent with Section 4.b.(2) of
DOE O 226.1B.
(6) Obtain and integrate each NNSA site contractor’s assessment and peer
review schedules that form the basis for planned integrated assessments
and operational awareness activities.
(7) Maintain cognizance of the contractor’s processes to identify, prioritize,
and address issues that affect mission performance.
(8) Review DOE directives, jointly with the contractor partner, emphasizing
directives that are under revision or are causing significant programmatic
impacts. Recommend revisions to directly reference best practices and
industrial or consensus standards in Departmental directives, in lieu of
DOE-specific language. Request exclusion from the applicability
statement when the directive is revised, as necessary.
g. Field Office Contracting Officers
(1) Exercise the authority to obligate the government to enter into, administer,
and/or terminate contracts and make related determinations and findings.
(2) Appoint CORs and Delegates.
(3) Administer the contract, to include ensuring compliance with laws,
regulations, and the contract terms and conditions; issuing necessary
contract modifications; determining allowable costs; and protecting the
Government’s interests.
(4) Incorporate SD 226.1B into the “List of Applicable Directives” identified
in the Laws, Regulations, and DOE Directives clause of the contracts.
(5) Issue or amend the WA as directed by the FOM. Perform responsibilities
and authorities consistent with WA process in accordance with applicable
directives while ensuring all WAs are reviewed by the PM and FM
funding the work.
8 NNSA SD 226.1B
8-12-16
8. REFERENCES.
a. DOE P 226.1B, Department of Energy Oversight Policy, 4-25-11.
b. DOE O 226.1B, Implementation of Department of Energy Oversight Policy,
4-25-11.
c. DOE O 227.1A, Independent Oversight Program, 12-21-15
d. DOE O 251.1C, Departmental Directives Program, 1-15-09
e. DOE O 412.1A Admin Change 1, Work Authorization System, 5-21-14
f. DOE O 413.3B Change 2, Program and Project Management for the Acquisition
of Capital Assets, 5-12-16
g. DOE O 414.1D Admin Change 1, Quality Assurance, 5-8-13
h. DOE O 470.4B Admin Change 1, Safeguards and Security Program, 2-15-13
i. NA-1 SD 226.1-1A, Headquarters Biennial Review of Nuclear Safety
Performance, 12-16-11.
j. NNSA SD 251.1 Admin Change 1, Policy Letters: NNSA Policies, Supplemental
Directives, and Business Operating Procedures, 10-7-13
k. NNSA SD 450.2 Admin Change 1, Functions, Responsibilities and Authorities
Document for Safety Management, 1-27-15.
l. BOP-001.331, Budget Execution Headquarters Approved Funding Program (HQ
AFP) and Work Authorization (WA) Business Operation Policy, 01-02-02.
m. BOP-10.003, Site Integrated Assessment Plan (SIAP) Development, Updating,
and Reporting, 1-18-12.
n. Unnumbered NA-50 document, Approach to Safety Management Reviews, 05-22-
2015
9. DEFINITIONS.
a. Contracting Officer (CO): The person appointed by the NNSA Administrator to
administer contracts.
b. Contracting Officer Representative (COR): A Federal employee formally
appointed by the CO in writing, with delegated authorities to act as an authorized
representative of a CO for specified functions that do not include actions that
could change the scope, price, terms or conditions of a contract (e.g., technical
performance direction).
Section 6
https://www.directives.doe.gov/directives-documents/200-series/0226.1-APolicy-b
https://www.directives.doe.gov/directives-documents/200-series/0226.1-BOrder-b
https://www.directives.doe.gov/directives-documents/200-series/0227.1-BOrder-A
https://www.directives.doe.gov/directives-documents/200-series/0251.001-BOrder-c
https://www.directives.doe.gov/directives-documents/400-series/0412.1-BOrder-a-admchg1
https://www.directives.doe.gov/directives-documents/400-series/0413.3-BOrder-b-chg2-pgchg
https://www.directives.doe.gov/directives-documents/400-series/0413.3-BOrder-b-chg2-pgchg
https://www.directives.doe.gov/directives-documents/400-series/0414.1-BOrder-d-admchg1
https://www.directives.doe.gov/directives-documents/400-series/0470.4-BOrder-b-admchg1
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/SD%20226.1-1A.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/SD%20226.1-1A.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/SD%20251.1%20AC1.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/SD%20251.1%20AC1.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/SD%20450.2%20AC1.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/SD%20450.2%20AC1.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/BOP%20001.331%20Budget%20Execution%20HQ%20AFP%20and%20WA.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/BOP%20001.331%20Budget%20Execution%20HQ%20AFP%20and%20WA.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/BOP%2010.003.pdf
https://nnsaportal.energy.gov/intranet/na-mb/Active%20Policies/BOP%2010.003.pdf
NNSA SD 226.1B 9
8-12-16
c. Contractor Corporate Parent/Contractor Parent: An organization whose
subsidiary or affiliated subordinated company has entered into a contract with
NNSA. The role of contractor parent(s) with respect to this SD is specified in the
applicable contract.
d. Field Office Manager (FOM): Person appointed by the NNSA Administrator to
lead a field office.
e. Functional Manager (FM): Federal functional managers are mission enablers who
provide technical assistance or subject matter expertise and resources to enable
mission delivery in support of program and field offices to implement delegated
responsibilities.
f. Governance: The system of management and controls executed in the
stewardship of the organization. In NNSA, governance is implemented through a
collaborative partnership between Federal and contractor organizations to
accomplish a common mission while still preserving the Federal independence
needed to effectively function in NNSA’s self-regulatory role.
g. NNSA Site Governance (or Model or System): The single comprehensive
governance system for a site that relies on the unique interrelationship inherent in
the NNSA contracting model, corporate parent involvement, and Federal
oversight. The relationship among the M&O contractor (or prime security
contractor or prime environmental management contractor), the corporate
parent(s), while specified in contract, and the NNSA Federal team, is built on trust
and transparency to ensure a balanced approach to effective mission
accomplishment.
h. Peer Review: A process internal to NNSA, whereby teams of contractor (and
parent representatives-consistent with the respective contracts) and Federal
employees (from program, functional, and field offices) gather to assess and
provide recommendations on a site governance system. The governance peer
review process is meant to be collaborative; the team does not approve the Site
Governance system. Reviewers may include representatives from other sites
including those that had previously implemented contractor assurance.
Section 7
i. Performance-Based: An approach where greater emphasis is placed on the
performance and risk impact of issues discovered rather than on simply the
existence of specific non-compliance issues. Performance-based, system level
oversight is used to assess contractor performance by evaluating the contractor’s
processes and management systems and the data normally generated by these
systems. In a performance-based approach, the assessor addresses the localized,
as well as the broader, impact of the issues against the overall adequacy,
efficiency, and cost-effectiveness of what is being assessed.
j. Program Office: A headquarters organization that is responsible for overseeing
appropriated funding and executing program management functions. Programs
10 NNSASD 226.IB
are national in scope and span multiple NNSA sites. The three core mission
"pillars" within the NNSA are: (I) maintaining a safe, secure, and effective
nuclear stockpile; (2) preventing, countering, and responding to the threats of
nuclear proliferation and nuclear tenorism; and (3) providing propulsion for the
United States nuclear navy. These constitute the main NNSA mission
programmatic areas. NNSA Program Offices include Defense Programs (NA-
10), Defense Nuclear Nonproliferation (NA-20), Naval Reactors (NA-30),
Emergency Operations (NA-40), Safety, Infrastructure and Operations (NA-50),
Defense Nuclear Security (NA-70), Counterte1rnrism and Counterproliferation
(NA-80), and Information Management (NA-IM).
k. Program Manager (PM): An element of DOE line management who is
responsible for NNSA program execution. For the purpose of this SD, a Federal
Project Director is considered a Program Manager and the authorities for capital
construction are designated by the Administrator in each individual project
execution plan.
l. Reliable Mission Performance: Performance by the contractor where (1) NNSA
mission objectives are met; (2) workers, the public, and the environment are
protected, assets are secure; and (3) operational and business systems are
effectively managed within contract requirements.
m. Risk-Inf01med: A decision making approach whereby conclusions drawn from an
assessment of past performance, hazards involved, and the likelihood and
consequences of accidents are considered together with other factors to make
decisions that better focus contractor and Federal oversight attention on design
and operational issues commensurate with their importance to public health and
safety.
n. System Level Oversight: In NNSA, system level oversight refers to a
comprehensive, global oversight of all programmatic and functional activities that
assess perfo1mance through evaluating the contractors' processes and
management systems and the data n01mally generated by these systems.
10. CONTACT. Associate Administrator for Safety, Infrastructure and Operations, NA-50,
202-586-8246.
BY ORDER OF THE ADMINISTRATOR:
Administrator
NNSA SD 226.1B 11
8-12-16
Attachments:
1. Contractor Requirements Document (CRD)
2. Attributes of NNSA Site Governance
THIS PAGE INTENTIONALLY LEFT BLANK
NNSA SD 226.1B Attachment 1
8-12-16 AT1-1
ATTACHMENT 1: CONTRACTOR REQUIREMENT DOCUMENT (CRD)
NNSA SD 226.1B, NNSA SITE GOVERNANCE
The Management and Operating (M&O), prime security, or prime environmental management
contractor is responsible for complying with the requirements of this CRD. The contractor is
responsible for flowing down the requirements of this CRD to sub-contractors at any tier to the
extent necessary to ensure the contractor’s compliance with the requirements.
Section 8
The contractor oversees the operations conducted at the site and has insights of how
programmatic efforts may conflict with safety/security/quality concerns and mission needs.
Contractors balance National Nuclear Security Administration (NNSA) programmatic execution
against risks or concerns associated with operations and cross-cutting mission functions. In
collaboration with their field office and other Federal oversight authorities, contractors ensure
that risks are communicated and accept, on behalf of NNSA, the risks associated with the
operations they are authorized to perform.
This Attachment applies to the corporate parent(s) to the extent specified in the contract.
1. Each contractor shall adopt Attachment 1 (CRD) of Department of Energy (DOE) Order
(O) 226.1B or demonstrate equivalency. NNSA site contractors shall operate within a
Site Governance Model with three overlapping systems as described in Attachment 2 of
NNSA Supplemental Directive (SD) 226.1B.
2. The contractor’s senior officer (Director, President, Laboratory Manager, or designee)
shall approve the contractor site level assurance system description document. The
contractor shall provide the contractor assurance system (CAS) description document to
the field office Contracting Officer for NNSA review and approval. The contractor shall
submit any updates to the CAS description to the contractor senior officer for approval
and the field office Contracting Officer for NNSA review and concurrence whenever
significant changes occur.
3. Each contractor in conjunction with its NNSA field office shall jointly review DOE
directives in the contract, or proposed to be in the contract, and provide recommendations
on efficiencies to the appropriate NNSA headquarters (HQ) office.
4. The contractor shall undergo a peer review of the Site Governance System meeting the
expectations of Attachment 2 of NNSA SD 226.1B, where applicable. Peer review teams
include contractor employees and their parent representatives (if applicable and permitted
by contract).
5. Each NNSA contractor shall plan, develop, maintain, and update an assessment schedule
that is coordinated with the field office. The contractor shall document the basis for the
planned assessments to ensure there is transparency and clarity on risks, prioritization,
and resource allocation.
6. Each NNSA site contractor shall identify, prioritize, and address issues that will or may
affect mission performance. These include safety, security, quality, or any other
operational/business issues that put or may put mission delivery at risk.
THIS PAGE INTENTIONALLY LEFT BLANK
NNSA SD 226.1B Attachment 2
8-12-16 AT2-1
ATTACHMENT 2: ATTRIBUTES OF NNSA SITE GOVERNANCE
NOTE: All attachments, except Attachment 1 (which applies to contractors only), apply to both
Federal and contractor employees.
National Nuclear Security Administration (NNSA) Site Governance System requires all the
partners (the Federal team, contractor, and corporate parent(s)) working collaboratively to ensure
reliable mission performance1.
Figure 1: NNSA Site Governance Model
NNSA Site Governance System.
The following attributes are hallmarks of an effective Site Governance System. These attributes
establish the framework for each site to begin evaluating their current assurance systems to
determine whether improvement is necessary and where improvement initiatives should be
focused in order to meet the expectations of the NNSA Administrator.
Section 9
Attributes of an effective Site Governance System include:
• Experienced, competent Federal and Management and Operating (M&O) partner line
managers.
• A trusting, transparent strategic partnership between NNSA, program/functional offices,
and the field office, and site contractor management teams which benefits from the
constructive dynamic tension2 inherent in the contractual relationship.
1 Reliable Mission Performance: Performance by the contractor where (1) NNSA mission objectives are met; (2)
workers, the public, and the environment are protected, assets are secure; and (3) operational and business systems
are effectively managed within contract requirements.
Attachment 2 NNSA SD 226.1B
AT2-2 8-12-16
• A trusting, transparent strategic partnership between the NNSA leadership and the site
contractor parent(s), to the extent permitted by contract.
• Federal and corporate parent oversight that is primarily system level and performance
based.
• The site-level governance system which is updated as necessary to remain user-friendly,
transparent, and is used to make risk-informed decisions to manage the site.
• Risk-informed operational decisions that are made as close to the work being performed
as feasible.
• Factual, timely, and appropriately detailed information that flows to and from the
headquarters (HQ) program offices, functional managers, Office of the Administrator,
and the field office managers (FOMs), Contracting Officers (CO), and Contracting
Officer’s Representatives (COR) to ensure a focus on speaking with “One Voice.”
• Clearly-defined roles and responsibilities between the NNSA FOM, program office, and
functional office with well-defined, contractually enforceable Federal direction given
only by the CO or the appointed CORs.
• Value-added and timely Government feedback to the contractor partners and intended to
continuously improve safe/secure and efficient mission performance.
• Contracts where all partners are focused on continuous improvement and long-term
safe/secure and efficient site mission performances.
• Contractor and Federal issues management systems that are aligned or well integrated to
facilitate data mining.
Contractor Assurance System (CAS).
The CAS description document specifies how the CAS is integrated with Federal and corporate
assurance systems, as well as key deliverables/commitments that will help validate compliance
and mission performance. The system should manage and monitor all site activities that support
the NNSA mission that could impact system reliability. The site level assurance system can be
the contractor’s corporate management system or a combination of components making up a
“system.” The site level assurance system should be built upon a foundation of enduring core
principles that are appropriate for the mission performed at the site. These principles should
include both a focus on day-to-day performance, as well as long-term mission, personnel, and
2 The constructive dynamic tension involves economic aspects of the contract in which the government incentivizes
the contractor to perform the highest priority mission objectives with safety, security, economy, and efficiency;
through a learning organization that achieves continuous improvement. The government exploits that constructive
dynamic tension to the financial benefit of the taxpayers, to the mission benefit of our citizens and allies, and to the
operational benefit of our contractors.
NNSA SD 226.1B Attachment 2
8-12-16 AT2-3
Section 10
infrastructure support needs such as future leader succession planning, key personnel retention,
critical infrastructure monitoring, and quality-of-life improvements that better ensure the
sustainability of enterprise resources critical to the success of our mission. The system should
help the site to be a learning organization.
Attributes of an effective contractor’s site level assurance system include:
• A comprehensive description of the governance system with processes, risks (and related
mitigation), key activities, and accountabilities clearly identified.
• Timely notification and codification of significant governance system changes.
• Rigorous, risk-informed, credible self-assessments, and continuous feedback resulting in
improvement activities, including utilization of nationally recognized experts and other
independent reviews, to assess and improve the contractor’s work process through
independent risk and vulnerability studies.
• Comprehensive analysis and evaluation of relevant performance data to identify negative
performance trends, extent of condition, and systemic problems that should be corrected
before they become significant issues.
• A site level issues management system to identify and track issues to closure. The issues
management process supports categorization, tracking, trending, and analysis of
performance data. Corrective actions are clear, appropriate, and effective.
• Integration of the governance system with other management systems including
Integrated Safety Management, Quality Assurance, and Integrated Safeguards and
Security Management.
• Metrics and targets to assess performance, including benchmarking of key functional
areas with other DOE/NNSA contractors, industry, and research institutions.
• Integration of external input received from the field office, NNSA, and DOE
programmatic elements, corporate parents, the DOE Inspector General, the Government
Accountability Office, other Federal and State regulators, and Chief Financial Officer Act
financial auditors.
• Timely, transparent, and appropriate communication of governance related information to
the FOM.
• Clearly defined integrated baseline performance expectations.
• Coordination with the NNSA field office to jointly review DOE directives and
recommend revisions to the Office of the Administrator (via NA-50).
• Identifying and notifying the field office of best practices that may improve the Site
Governance System.
Attachment 2 NNSA SD 226.1B
AT2-4 8-12-16
• Where appropriate, sharing of lessons learned from accidents and near-miss events and
incorporation into projects, programs, or day-to-day operations.
Corporate Assurance.
The contractor parents bring depth and breadth of experience that could benefit the site. To the
extent required by the contract, each corporate parent company(s) is expected to monitor and
support the contractor partner in ensuring it can continue to meet the expectations of the
government. The parent(s) should establish a system that effectively monitors and measures
assurance. In light of the corporate performance guarantees contained in the contracts, it is
beneficial for the corporate organization to quickly address management or leadership issues
within the contractor organization. The corporate parent lead (Board of Director Chairman or
equivalent) should have periodic and on-going communication with the NNSA Administrator
(NA-1) and the Principal Deputy Administrator regarding site status and issues. The contractor
corporate board should also meet periodically with the FOM on how the contractor leadership
team is working with the Federal team (both at the site and at NNSA HQ).
Section 11
Attributes of an effective corporate assurance system include:
• Monitoring and evaluation of site metrics and performance goals relative to the contract
and benchmarking.
• Support for staffing shortages, staff development, and retention programs to cultivate the
workforce of the future.
• Periodic evaluation and corporate functional input of the site contractor organizational
structure and leadership team effectiveness (e.g., engagement, cohesion, working
relationship with field office, and NNSA HQ).
• Periodic and on-going dialog with NA-1, the Principal Deputy Administrator, FOM, and
other senior HQ management and key stakeholders.
Federal Oversight.
The NNSA Federal oversight team consists of three entities: Programmatic elements, Functional
elements, and field offices. HQ functional leads, in conjunction with the FOM, perform
oversight in key functional areas as shown in Table 1. Depending upon the particular site and its
hazards, key functional areas (asterisked) may pose higher risk to the mission, gain increased
public attention when upsets occur, or pose greater risks to the public and/or the environment.
For those functional areas that are designated with an asterisk, joint responsibility is shared
between the HQ Functional organizations and the field office for performance. For those
functional areas (e.g., day-to-day operations, Environment, Safety & Health (ES&H) and
Quality, business and contract management) responsibility resides primarily with the field office,
leveraging functional and programmatic resources as appropriate to ensure contractual
compliance and effective performance.
NNSA SD 226.1B Attachment 2
8-12-16 AT2-5
Table 1 - NNSA Field Office Oversight Functional Areas
Field Oversight Functional Areas
High Hazard Operations, including Nuclear Safety**
Safeguards and Security**
Cyber Security**
Emergency Management**
ES&H (other than high hazard operations) and Quality
Day-to-day Operations/Maintenance
Business and Contract Management
Note: Functional areas marked with “**” are given higher priority and greater emphasis due to
their higher potential for mission impact.
Attributes of an effective Federal oversight system include:
• Experienced and qualified FOM and senior leadership with good rapport and trust with
the contractor senior leadership, as well as with HQ elements that meet regularly with
their counterparts and periodically as a group to discuss site mission performance.
• Field Office support promotes programmatic communications between the contractor and
program managers.
• Qualified technical staff, especially in key or unique functional areas (e.g., CORs, facility
representatives, subject matter experts).
• Level and type of oversight activities are graded based on potential to impact site mission
performance.
• Flexible, integrated assessments that leverage the contractor site level governance system
activities wherever possible.
• Positive recognition and reinforcement when contractor partner self-identifies site
problem areas.
• Periodic (e.g., weekly) integrated field office meetings to discuss closure of existing
issues and emerging trends and potential new issues. HQ programmatic and functional
offices examine performance trends across the sites.
• A site level issues management system to identify and track issues to closure.
• Frequent informal interaction between field office and the contractor partner senior
management, where performance feedback on site mission reliability is discussed.
Section 12
Attachment 2 NNSA SD 226.1B
AT2-6 8-12-16
• Periodic, formal feedback that is provided to the contractor partner at the system level
(e.g., for noted site program weaknesses that are not being sufficiently addressed by
contractor’s assurance system(s)).
• Field office oversight activities primarily focused on system level performance.
• NNSA Federal graded approach for compliance-based assessments required by DOE
Orders performed by HQ functional support as requested by the FOM. FOM has the lead
responsibility for contractor partner interactions, including audit schedules, findings, and
required corrective actions.
• Clearly defined integrated baseline performance expectations.
• Direct and routine engagement by HQ programmatic and functional leadership with the
FOM, CO, and CORs to discuss performance highlights and concerns in order to foster
the “One Voice” expectation for performance feedback to the contractor partners.
• Where appropriate, shared lessons learned from accidents and near-miss events with the
sites and HQ offices.
1. PURPOSE. This supplemental directive (SD) establishes the National Nuclear Security Administration (NNSA) Site Governance Model as the system that the Federal government and NNSA’s contractor partners work within to help assure effective mission p...
2. CANCELLATION.
3. APPLICABILITY.
4. SUMMARY OF CHANGES. This SD builds upon and incorporates NA-1 SD 226.1A requirements, where applicable, for Federal oversight, assessment planning, operational awareness activities, and contractor assurance. This SD emphasizes the role of the con...
5. BACKGROUND. DOE P 226.1B established DOE’s expectations for the implementation of a comprehensive and robust oversight process. DOE expects that the contractor’s governance processes will provide reasonable assurance that the system of management...
6. Requirements.
7. RESPONSIBILITIES.
8. References.
9. Definitions.
a. Contracting Officer (CO): The person appointed by the NNSA Administrator to administer contracts.
b. Contracting Officer Representative (COR): A Federal employee formally appointed by the CO in writing, with delegated authorities to act as an authorized representative of a CO for specified functions that do not include actions that could change t...
c. Contractor Corporate Parent/Contractor Parent: An organization whose subsidiary or affiliated subordinated company has entered into a contract with NNSA. The role of contractor parent(s) with respect to this SD is specified in the applicable cont...
d. Field Office Manager (FOM): Person appointed by the NNSA Administrator to lead a field office.
e. Functional Manager (FM): Federal functional managers are mission enablers who provide technical assistance or subject matter expertise and resources to enable mission delivery in support of program and field offices to implement delegated responsi...
f. Governance: The system of management and controls executed in the stewardship of the organization. In NNSA, governance is implemented through a collaborative partnership between Federal and contractor organizations to accomplish a common mission ...
g. NNSA Site Governance (or Model or System): The single comprehensive governance system for a site that relies on the unique interrelationship inherent in the NNSA contracting model, corporate parent involvement, and Federal oversight. The relation...
Section 13
h. Peer Review: A process internal to NNSA, whereby teams of contractor (and parent representatives-consistent with the respective contracts) and Federal employees (from program, functional, and field offices) gather to assess and provide recommendat...
i. Performance-Based: An approach where greater emphasis is placed on the performance and risk impact of issues discovered rather than on simply the existence of specific non-compliance issues. Performance-based, system level oversight is used to as...
j. Program Office: A headquarters organization that is responsible for overseeing appropriated funding and executing program management functions. Programs are national in scope and span multiple NNSA sites. The three core mission “pillars” within ...
k. Program Manager (PM): An element of DOE line management who is responsible for NNSA program execution. For the purpose of this SD, a Federal Project Director is considered a Program Manager and the authorities for capital construction are designa...
l. Reliable Mission Performance: Performance by the contractor where (1) NNSA mission objectives are met; (2) workers, the public, and the environment are protected, assets are secure; and (3) operational and business systems are effectively managed ...
m. Risk-Informed: A decision making approach whereby conclusions drawn from an assessment of past performance, hazards involved, and the likelihood and consequences of accidents are considered together with other factors to make decisions that better...
n. System Level Oversight: In NNSA, system level oversight refers to a comprehensive, global oversight of all programmatic and functional activities that assess performance through evaluating the contractors’ processes and management systems and the ...
10. CONTACT. Associate Administrator for Safety, Infrastructure and Operations, NA-50, 202-586-8246.