Section 1
NNSA POLICY LETTER
Approved: 12-22-16
TECHNOLOGY READINESS
ASSESSMENTS
NATIONAL NUCLEAR SECURITY ADMINISTRATION
Office of Cost Estimating and Program Evaluation
CONTROLLED DOCUMENT OFFICE OF PRIMARY INTEREST (OPI):
AVAILABLE ONLINE AT: Office of Cost Estimating and Program Evaluation
htt ps://nnsa por·tal.ener gy.gov/intra net/na-mb/na -mb-20/pages/nnsa-policv.aspx
printed copies arc uncontrolled
NAP-29 413.4
THIS PAGE INTENTIONALLY LEFT BLANK
NAP -413.429 1
12-22-16
TECHNOLOGY READINESS ASSESSMENTS
1. PURPOSE. This NNSA Policy Letter (NAP) describes the processes and procedures for
conducting Technology Readiness Assessments (TRAs) for any given acquisition
process.
2. CANCELLATION. None.
3. APPLICABILITY.
a. Federal. This applies to all National Nuclear Security Administration (NNSA)
Elements.
b. Contractors. Does not apply to contractors.
c. Exemption. Not applicable.
d. Equivalency. In accordance with the responsibilities and authorities assigned by
Executive Order 12344, codified at 50 United States Code sections 2406 and
2511, and to ensure consistency through the joint Navy/Department of Energy
(DOE) Naval Nuclear Propulsion Program, the Deputy Administrator for Naval
Reactors (Director) will implement and oversee requirements and practices
pertaining to this NAP for activities under the Director's cognizance, as deemed
appropriate.
4. SUMMARY OF CHANGES. Not applicable.
5. BACKGROUND. A TRA is a systematic, metrics-based process that assesses the
maturity of, and the risks associated with, critical technologies used in meeting product
realization goals for a specific product. TRAs inform program and project acquisition
decisions and technology maturation planning using objective knowledge gathered from
subject matter experts (SMEs) and compiled into a standardized scoring scale. TRAs use
Technology Readiness Levels (TRLs) to measure the state of the technology
development from early research on basic principles through large-scale testing and
evaluation prior to commercial deployment. TRA activities start with defining the
purpose and scope of the assessment, continue through the selection of critical
technologies and evaluation process, and end with the final report and subsequent
technology maturation planning.
In conjunction with this TRA exercise, and its associated products or artifacts, an
independent assessment of the TRA is executed to ensure that the TRA has been
conducted in an unbiased manner and its results are acceptable to acquisition executives.
This independent assessment is based on metrics and best practices from industry and its
conclusions are captured in an evaluation memo.
Throughout this NAP, unless otherwise specified, references to TRA requirements are the
responsibility of the TRA team.
Formatted: Font: 12 pt
Formatted: Font: 12 pt
2 NAP -
413.429
12-22-16
6. REQUIREMENTS.
a. NNSA Elements must develop policy on what projects, programs, or acquisition
processes require a TRA, unless otherwise directed by broader DOE or NNSA
directives. These procedures will provide guidance on the execution of TRAs in
any given acquisition process in support of milestone decisions or at the direction
of the Administrator.
b. Programs must conduct TRAs using this NAP at critical decision points for
projects meeting the following criteria:
(1) Prior to Phase 6.2 authorization: Major Atomic Energy Defense
Acquisition (MAEDA) programs managed under the Phase 6.X process
Section 2
where the total program cost is greater than $500 million or the total
lifetime life-cycle cost is greater than $1 billion.
(2) Prior to Critical Decision-I and Critical Decision-2: Major System
Acquisitions covered by DOE Order (0) 413.3B, Program and Project
Management for the Acquisition of Capital Assets (or successor order)
with an estimated total project cost (TPC) greater than or equal to $750
million.
(3) At other decision points for milestone approval as mandated by the NNSA
Supplemental Directive (SD) 452.3-2, Phase 6.X Process and DOE 0
413.3B (or successor policies).
(4) As directed by the Administrator or the Project Management Executive,
. for first-of-a-kind engineering endeavors.
c. The TRA must be planned and resourced for a comprehensive analysis, completed
prior to the appropriate milestone as defined by the applicable acquisition policy
(for example, designated acquisition milestone, gate review, critical decision
event, etc.).
d. TRAs must document assessment objectives to include the applicable milestone
decision event or the acquisition executive direction the TRA will support.
e. TRAs must have a Team Lead accountable for the TRA process and results.
Additionally SMEs representing critical technologies under evaluation must be
identified. In the absence of a federal Team Lead, the TRA must have a named
federal employee accountable for the TRA results.
f. Commensurate with the size and scope of the effort, the following TRA
information is required. A single artifact or group of artifacts may be provided to
satisfy these requirements:
(1) TRA Schedule/Plan. A TRA schedule and action plan must be developed
for the complete assessment process.
Formatted: Indent: Left: 0", Tab stops: 5.81", Left +
Not at 6.04"
NAP -
413.429 12-
22-16
3
(2) Assessment Tool (TRA Calculator). TRA calculator(s) must be developed
and applicable to the context and Critical Technology Elements (CTEs)
under analysis. The TRA calculator must follow the format of the DOE
TRL scale contained in the approved DOE TRL guide (DOE Guide (G)
413.3-4A, Technology Readiness Assessment Guide or successor), and
include other readiness level factors as deemed necessary to fully
characterize the maturity risk of the CTE(s) for the supported decision,
event, or executive tasking. Some of these factors may include:
(a) Technology Readiness Level (TRL),
(b) Manufacturability Readiness Levels (MRLs),
(c) Programmatic Readiness Levels (PRLs),
(d) System Integration Readiness Levels (SRLs),
(e) Integration Readiness Levels (IRLs), and
(f) Nuclear Readiness Levels (NRLs).
(3) TRA Final Report. The TRA must produce a TRA final report containing
the results of the analysis, a list of the TRA team members and their roles,
the assessed scoring per CTE to include supporting rationale or scoring
justification, and the applicable TRL calculator. The report must fully
characterize technology maturity risks of the applicable CTE(s).
(4) Technology Maturation Plan (TMP). The TRA must produce a TMP for
all technologies assessed within regulatory thresholds per cognizant
acquisition policy. The TMP must include the approach, activities,
resources, and timelines associated with maturing technologies to the
target level.
(5) Evaluation Memo. This memorandum must document an assessment of
the completeness and analytical quality of the TRA process to ensure
programs and projects are meeting levels of confidence associated with
Section 3
appropriate overall system performance. The assessment must review the
TRA against best practices and applicable DOE guidance (See Appendix
1: TRA Metrics); however, it will not validate the technical findings or
results of the TRA scoring.
7. RESPONSIBILITIES.
a. Deputy/Associate Administrators.
(1) Assign the TRA Team Lead;
(2) Ensure resources are available for the execution of the TRA; and
Formatted: Font: 12 pt
Formatted: Right: -0.23"
4 NAP -
413.429
12-22-16
(3) Review and approve the TRA plan, schedule, TRA report, and subsequent
TMP as required. Commensurate with scope and size of the effort, the
Deputy/Associate Administrator may delegate this responsibility.
b. Director, Office of Cost Estimating and Program Evaluation. Reviews the TRA
plan, the assessment tool, the TRA final report, and the TMP, and documents the
result in the evaluation memo provided to the program or project office and
Administrator.
C. TRA Team Lead.
(1) Serves as the TRA team primary point of contact;
(2) Reviews TRA team members' qualifications to ensure that the team has
the appropriate expertise and abilities to execute the TRA; and
(3) Develops the TRA plan, TRA schedule, TRA calculator, and TRA final
report and associated TMP.
d. TRA Team Members.
(1) Serve as SMEs in technical areas relevant to the technology under review.
(2) Perform independently of the offices reviewing the work.
(3) Assess technologies, determine Readiness Levels (and other relevant
metrics), and document their determination.
(4) Encourage participation of SMEs from the field offices to ensure relevant
expertise is included in the assessment.
8. REFERENCES.
a. DOE Secretarial Memorandum, Project Management Policies and Principles,
6-8-15.
b. DOE O 413.3B Admin Change 1, Program and Project Management for the
Acquisition of Capital Assets, 10-22-15.
c. DOE G 413.3-4A Admin Change 1, Technology Readiness Assessment Guide,
10-22-15.
d. NNSA Defense Programs Technology Readiness Assessment (TRA)
Implementation Guide, Revision 1, June 2015.
Formatted: Font: Times New Roman, 12 pt
Formatted: Tab stops: 5.88", Left + Not at 6.05"
NAP -413.429 5
12-22-16
9. DEFINITIONS.
a. Artifact. Any publication or document that defines the methods, processes, tools,
data, or product deliverables because of, or in support of, a systems engineering
life cycle, captured in electronic or hard copy format. Examples of this might be
design documents, data models, workflow diagrams, test matrices and plans, setup
scripts, etc.
b. Critical Technology Element (CTE). A technology element is critical if the
system being acquired depends on the technology element to meet operational
requirements (with acceptable development, cost and schedule, and with
acceptable production and operations costs) and if the technology element or its
application is either new or unique.
c. Integration Readiness Levels (IRLs). The TRL scale does not account for the
integration of a technology into a complete system. In a system consisting of
multiple component technologies, these might be at different TRLs at the
beginning of the acquisition, and may mature at different rates. Systems under
development frequently fail at integration points due to these disparate component
technology levels of maturity. To minimize this failure, IRLs are developed to
characterize the interface maturity between developing component technologies in
a system.
Section 4
d. Major Atomic Energy Defense Acquisition (MAEDA) Program. An atomic
energy defense acquisition program of which the total project cost is more than
$500 million or the total lifetime cost is more than $1 billion. The term major
atomic energy defense acquisition program does not include a project covered by
DOE O 413.3B (or a successor order) for the acquisition of capital assets for
atomic energy defense activities.
e. Manufacturability Readiness Levels (MRLs). MRLs are a measurement scale
designed to provide a common metric and vocabulary for assessing manufacturing
maturity and risk of a particular technology, manufacturing process, weapon
system, subsystem, or element of a legacy program at key milestones throughout
the acquisition life cycle. There are 10 basic MRLs designed to be roughly
congruent with comparable levels of TRLs for ease of use and understanding.
f. Nuclear Readiness Level (NRLs). In order to address the specific issues related to
nuclear components and materials, the United Kingdom's (UK) National Nuclear
Laboratory (NNL) developed a nuclear technology maturity scale (from 1-10),
similar to the original NASA TRL scale (from 1-9).
g. Programmatic Readiness Levels (PRLs). This index addresses program
management concerns, such as documentation of programmatic milestones seen
as vital to successful technology product development. This scale is also a nine
level scale to match the TRL scale.
Formatted: Font: 12 pt
Formatted: Font: 12 pt
6 NAP-
413.429
12-22-16
h. Project Management Executive. The individual designated to integrate and unify
the management system for a program portfolio of projects and implement
prescribed policies and practices. Formerly known as the Acquisition Executive.
1. Subject Matter Expert (SME). Individual with sufficient technical knowledge of
the critical technologies under review, commensurate with the depth and rigor of
the TRA. These individuals may be either federal or contractor personnel.
J. System Readiness Levels (SRLs). Measures the level of maturity applied at the
system-level. SRLs combine TRLs with IRLs. SRLs are useful when going from
the individual technology to a system context that may involve multiple
technologies, as is the case with most technologies in the operational
environment.
k. Technology. A manner of accomplishing a task especially when using technical
processes, methods, or knowledge. This may include hardware, software,
materials, etc.
1. Technology Development. Activities in connection with corporate or
governmental innovation.
m. Technology Maturation Plan (TMP). A TMP details the steps necessary for
developing less mature technologies to the point where they are ready for project
insertion.
n. Technology Readiness Assessment (TRA). A systematic, metric-based
assessment of how far technology development has progressed. It is not a
pass/fail exercise, and does not intend to provide a value judgment of the
technology developers or the technology development program.
o. Technology Readiness Level (TRL). A metric used for describing technology
maturity. It is a measure used by many U.S. government agencies to assess
maturity of evolving technologies prior to incorporating that technology into a
system or subsystem.
10. CONTACT. Director, Office of Cost Estimating and Program Evaluation, 202-586-6910
BY ORDER OF THE ADMINISTRATOR:
Appendix1: TRA Metrics
Appendix 2: NAP Process Workflow
Section 5
Formatted: Tab stops: 5.81", Left + Not at 5.96"
Formatted: Font: 12 pt
Formatted: Font: 12 pt
NAP -
413.429
12-22-16
Appendix 1
APl-1
APPENDIX 1: TRA METRICS
1. Best Practices for TRA Process - General Principles
a. A TRA Lead designee.
b. The TRA schedule allows adequate lead-time to socialize the TRA prior to the
supported decision and develop Technology Maturation plans if required.
c. Subject Matter Experts (SMEs) represent critical technologies under analysis.
2. Best Practices for TRA Process - Determining Critical Technologies
The TRA shows evidence of disciplined systems engineering and systems analysis
methods for determining critical technologies (e.g., requirements analysis, functional
decomposition, design synthesis, work breakdown structures, mission/performance
analysis, and enterprise architecture analysis).
3. Best Practices for TRA Process -Assessing Technology Maturity
a. The type of readiness assessment and Readiness Level (RL) calculator scale (e.g.,
TRL, MRL, SRL, IRL, PRL, or Hybrid) is clearly identified for each Critical
Technology Element (CTE) (if different types ofRLs), traceable to the applicable
acquisition framework, and remains stable throughout the analysis.
b. The TRA clearly shows the TRL score for each CTE with substantiating analysis
and data.
c. The TRA analysis framework, methodology, and scoring is supported with details
commensurate with the assessed levels according to the Calculator.
d. TRA assessment shortfalls in the characterization of technology risk are
identified.
4. Best Practices for TRA Process-TRA Reporting, Governance
a. The TRA report is completed and accepted by the Deputy/Associate
Administrator or delegate prior to the acquisition decision being supported.
b. The TRA report contains sufficient supporting information to show how the
analysis was conducted and that the results are clear and sufficiently
substantiated.
c. Technology shortfalls and risks identified by CTE.
5. Best Practices for TRA Process- Technology Maturation Planning
The Technology Maturation Plan (TMP) contains the following:
Formatted: Right: -0.15"
Appendix
1 APl-2
a.
b.
c.
NAP -
413.429 12-
22-16
History of past TRL assessments and current TRL levels (shortfalls noted).
Plan to mature CTEs that do not meet required levels.
A comprehensive characterization of the CTE maturation risk.
Formatted: Font: 12 pt
Formatted: Indent: Left: 4.75"
Formatted: Font: 12 pt
Formatted: Font: 12 pt
NAP -413.4129
Appendix 2
12-22-16 AP2-1
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Left, Right: 0.22", Space Before: 4.65 pt,
Line spacing: single
Formatted: Indent: Left: 0"