WQA Bulletin - NAP 401.1A Attachment 2 Implementation Guidance, Rev. 2

WQA Bulletin_NAP-401.1A Implementation Guidance_rev2_SEPT2021.pdf275.27KB
Document text

Text extracted from the attached file. Refer to the original document for the authoritative version.

Section 1

WEAPON QUALITY ASSURANCE (WQA) BULLETIN NNSA WEAPON QUALITY DIVISION (NA-121.3) September 2021 NAP 401.1A, Attachment 2 Implementation Guidance, Rev. 2 Section M&O Implementation Federal Methods of Validating Implementation 2.3 Control of Documents These elements are expected to be documented as part of the contractor WQMS description. The foundation for each of these elements may already be in place at a site as required by other DOE or NNSA Directives but the additional detail specified in NAP- 401.1A for each of these elements is expected to be added to each of those elements to be considered part of the contractor WQMS. QAS 1 2.4 Control of Records 3.1 Management Commitment 3.2 Management Review 4.1 Training and Qualification 5.1 Assessments 5.2 Monitoring and Measurement of Processes 5.3 Analysis of Data 5.4 Continuous Improvement 5.5 Preventive Action 5.6 Metrology Program 6.1 Early and Continuous Application of Quality Principles Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.1.1 Project Management Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.1.2 Risk Management Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.1.3 Configuration Management Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.1.4 Data Management Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.1.5 Mission Assignment No M&O implementation None 6.2 Quality Planning Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.3 Establishing & Validating Requirements Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.4.1 Design Process DA is expected to include this as an element of their contractor WQMS description. (The DFX philosophy is not expected to be implemented until it is created in DPBPS content.) QAS 1 6.4.2 Design Inputs Defense Programs, DAs, and PAs implement this section by following DPBPS content (The DFX philosophy is not expected to be implemented until it has been created in DPBPS content.) Other Legend: DA and PA WQMS DA WQMS PA WQMS Section M&O Implementation Federal Methods of Validating Implementation 6.4.3 Design Outputs Defense Programs, DAs, and PAs implement this section by following DPBPS content (The DFX philosophy is not expected to be implemented until it has been created in DPBPS content.) Other 6.4.4 Design Verification Defense Programs, DAs, and PAs implement this section by following DPBPS content (The DFX philosophy is not expected to be implemented until it has been created in DPBPS content.) Other 6.4.5 Design Qualification Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.4.6 Design Verification and Qualification Testing Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.4.7 Design Verification and Qualification Documentation Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.4.8 Control of Design Changes Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.5 Procurement PA is expected to include this as an element of their contractor WQMS description, which will document the PAs existing procurement process. When R013 Appendix A is released, which will refine the parent requirements in Section 6.5, the PA will be expected to follow those requirements to meet the intent of this section.

Section 2

QAS 1 6.6.1 Control of Production PA is expected to include this as an element of their contractor WQMS description. QAS 1 6.6.2 Production Planning Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.6.3 Production Process Verification Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.6.4 Qualification of Production Processes Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.6.5 Control of Production Process Changes Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.6.6 Control of Acceptance Equipment Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.6.7 Identification and Traceability Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.6.8 Control of Product Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.6.9 Monitoring and Measurement of Product Defense Programs, DAs, and PAs implement this section by following DPBPS content Other 6.6.10 Control of Nonconforming Product PA is expected to include this as an element of their contractor WQMS description. QAS 1 6.6.11 Corrective Action Defense Programs, DAs, and PAs implement this section by following DPBPS content Other Legend: DA and PA WQMS DA WQMS PA WQMS NAP 401.1A, Attachment 2 Implementation Guidance, Rev. 2

Something wrong with this record? Tell us