NAP 540.3, Corporate Performance Evaluation Process for Management and Operating Contractors
To establish and implement a uniform, corporate process for evaluation of NNSA Management and Operating (M&O) contractors' performance that results in a documented, consistent, and fair evaluation that is aligned with the Federal Acquisition Regulation (FAR), Department of Energy Acquisition Regulation (DEAR), and related DOE directives and NNSA policies.
Previously NAP 4C . NNSA Directives Program has revised their numbering system to a three-digit system. See Crosswalk for more information.
Version history and related documents
Superseded by
A newer version replaces this document.
Related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
NNSA POLICY LETTER
Approved: 12-22-16
CORPORATE PERFORMANCE EVALUATION
PROCESS FOR MANAGEMENT AND
OPERATING CONTRACTORS
NATIONAL NUCLEAR SECURITY ADMINISTRATION
The Office of Acquisition and Project Management (APM)
CONTROLLED DOCUMENT OFFICE OF PRIMARY INTEREST (OPI):
AVAILABLE ON-LINE AT: Office of Acquisition Management (OAM)
https://nnsa.energy.gov/aboutus/ouroperations/managementandbudget/policysystem/nnsapolicies
printed copies are uncontrolled
NAP 540.3
https://nnsa.energy.gov/aboutus/ouroperations/managementandbudget/policysystem/nnsapolicies
THIS PAGE INTENTIONALLY LEFT BLANK
1 NAP 540.3
12-22-16
CORPORATE PERFORMANCE EVALUATION PROCESS FOR MANAGEMENT
AND OPERATING CONTRACTORS
1. PURPOSE. To establish and implement a uniform, corporate process for evaluation of
NNSA Management and Operating (M&O) contractors’ performance that results in a
documented, consistent, and fair evaluation that is aligned with the Federal Acquisition
Regulation (FAR), Department of Energy Acquisition Regulation (DEAR), and related
DOE directives and NNSA policies.
2. CANCELLATION. NAP 4B, Corporate Performance Evaluation Process (CPEP) for
M&O Contractors, dated 06-30-08.
3. APPLICABILITY.
a. Federal. Applies to all NNSA Federal organizations.
b. Contractor. Does not apply to contractors.
c. Equivalencies.
(1) For non-NNSA M&O contractors performing work for NNSA, NNSA will
follow the Cognizant Program Secretarial Officer’s equivalent process,
unless NNSA and the non-NNSA office have an agreement regarding
contract administration (e.g., NNSA and Environmental Management
(EM) for the Savannah River Field Office).
(2) In accordance with the responsibilities and authorities assigned by
Executive Order 12344, codified at 50 United States Code sections 2406
and 2511, and to ensure consistency through the joint Navy/DOE Naval
Nuclear Propulsion Program, the Deputy Administrator for Naval Reactors
(Director) will implement and oversee requirements and practices
pertaining to this Directive for activities under the Director's cognizance,
as deemed appropriate.
d. Exemptions.
(1) Capital Asset Acquisitions: When Capital Asset Acquisitions over the
General Plant Project (GPP) threshold are procured through an M&O
contract, they may, as applicable under specific contract terms and
conditions, have a separate fee structure and performance evaluation
process beginning at Critical Decision (CD)-2 through project completion
and will be exempt from the CPEP.
(2) Alternate Fee Structures: M&O contracts with alternate fee structures that
include the Section H clause “Leadership Performance Evaluation” will
follow a separate leadership performance evaluation process beginning at
2 NAP 540.3
12-22-16
contract award, or the date this clause is modified into an existing contract,
whichever comes first.
4. SUMMARY OF CHANGES.
This revision makes changes to codify the Strategic Performance Evaluation and
Measurement Plans and associated process, as well as incorporate process improvements
identified through lessons learned. It primarily makes revisions to the roles and
responsibilities. The four phases below are unchanged.
5. REQUIREMENTS.
The Corporate Performance Evaluation Process is an integrated process applied
consistently by all NNSA organizations. The CPEP and the related Performance
Evaluation and Measurement Plans (PEMPs) for each M&O contract must, unless an
approved deviation is granted by the Senior Procurement Executive (SPE), follow the
format and boundaries as follows:
Section 2
a. Field Offices must use consistent PEMP formats and definitions.
(1) Formats – These will be provided through the Fee Determining Official
(FDO) annual guidance.
(2) Definitions:
(a) Goal – Level one elements cover broad performance areas and are
related to mission accomplishment, operational excellence, or
management of a laboratory/plant. Each level one element is
usually described by a general overarching statement of the desired
performance. Ratings for these elements are determined by
aggregating all performance evaluation for level two elements
under each level one element. These elements are not site specific.
(b) Objective – Level two elements are the performance areas against
which a contractor is evaluated by NNSA. These elements outline
desired results and more specific performance outcomes than level
one elements. These elements are not site specific.
(c) Key outcome – Level three elements serve to highlight very
specific performance outcomes that require attention from senior
laboratory/plant leadership. These outcomes may relate to major
program or project milestones or to desired improvements in
performance of a level one or two element. These elements must
be clearly linked to a level one or two element, are site specific,
and updated annually.
NAP 540.3
12-22-16
3
(d) Fee allocation – The amount of incentive (at risk) fee available to
be earned by the contractor for results associated with a specific
goal.
(e) Interim Feedback Report (IFR) – A periodic report provided to the
contractor during the evaluation period highlighting
accomplishments, issues, and areas where performance met
requirements/expectations.
(f) Functional Manager - This is a manager overseeing mission
support functions.
b. Boundaries:
(1) Goals must relate to critical strategic objectives of the NNSA as defined
by plans including, but not limited to, the NNSA Strategic Vision;
Stockpile Stewardship Management Plan; Prevent, Counter, and Respond
Strategic Plan, etc.
(2) Goals must be written at a strategic level and must focus on outcomes, not
processes. Award fee allocated to a specific goal must be reflective of the
actual value or importance of the work, as well as both the
financial/operational challenges at the site and performance challenges
exhibited in previous years.
(3) PEMPs apply a performance-based approach. The performance-based
approach evaluates the contractor's performance through a set of goals.
Each goal, and its associated objectives and key outcomes will be
measured against authorized work, demonstrated performance, and impact
to the NNSA mission.
(4) The CPEP and the related documents must be consistent with FAR and
DEAR requirements, all contract terms and conditions, and related
policies.
(5) It is essential that a baseline of performance expectations be established at
the beginning of the evaluation period to equitably measure performance,
and that changes to that baseline are carefully managed. Any change to
the PEMP requires concurrence by the impacted program office and the
NNSA SPE prior to the Field Office Manager (FOM) and Contracting
Officer signatures. Performance monitoring and reporting takes place
periodically throughout the year. During the evaluation period, interim
performance feedback is provided to the M&O contractor, highlighting
accomplishments and issues to keep the contractor informed during the
evaluation period. This feedback may also highlight areas where
performance met requirements/expectations, as appropriate.
Section 3
4 NAP 540.3
12-22-16
(6) At the end of the evaluation period, when the award fee determination is
made, objectives and key outcomes will be assessed in the aggregate to
establish an adjectival performance rating for each goal. All goals will be
assessed in the aggregate to determine an overall adjectival performance
rating for the overall contract. Notwithstanding the overall strategic
framework, any significant failure may limit the overall rating and award
fee earned.
(7) The adjectival performance ratings will be determined using the
definitions in FAR Subpart 16.401(e)(3) as supplemented by this NAP in
Appendix 1. The FDO has full discretion to adjust the FOM’s
recommended rating and award fee amount.
(8) The CPEP has four phases as follows:
(a) The Planning Phase: Must be completed prior to the beginning of
the evaluation period and involves the following:
1 Review and incorporation of lessons learned from the prior
year;
2 Identification of objectives and key outcomes, consistent
with the Planning, Programming, Budgeting, and
Execution/Evaluation (PPBE) process and associated Work
Authorizations/Implementation Plans;
3 Development, review, and FDO approval of PEMPs for
each NNSA M&O contract;
4 Determination of the allocation of available fee among
goals within the PEMP in accordance with the contract;
5 Issuance of annual implementation guidance that will
describe the expectations for the evaluation period, such as
schedules, templates, and other items, prepared by the
Office of Acquisition and Project Management (APM) and
approved by FDO; and
6 Issuance of the PEMP to the M&O contractor.
(b) The Monitoring Phase: Takes place during the evaluation period
and includes periodic feedback to the contractor provided through
IFRs. This includes:
1 Monitoring of M&O contractor performance by all offices;
NAP 540.3
12-22-16
5
2 Leveraging of contractor assurance systems, other tools,
and other performance data and information by all offices
to monitor performance, as appropriate;
3 Interim feedback to the M&O contractor from the Field
Office, with input from program/functional offices and
non-NNSA offices, as applicable; and
4 Coordination between offices to ensure NNSA speaks with
one voice. All offices will strive to reach consensus on
contractor performance, demonstrated by concurrence on
documents.
(c) The Assessment Phase: Begins at the end of the evaluation period
in accordance with the terms and conditions of the contract and is
when the FDO determination is made and the PER is completed.
This includes:
1 Assessing contractor performance by all offices at the end
of the evaluation period and providing recommended
ratings or a recommended fee amount to the SPE and
ultimately the FDO. Timely and effective evaluation input
is critical to a successful Assessment Phase;
2 Coordination between offices to ensure NNSA speaks with
one voice. All offices will strive to reach consensus on
contractor performance, demonstrated by concurrence on
documents;
3 Adjudication by the SPE if concurrence is not reached; and
4 FDO determination of the final performance rating and
earned fee.
(d) The Post-Assessment Phase: Begins after the FDO approves the
performance rating, earned fee, and additional contract term
(where applicable) for the M&O contractors. Deliverables include:
1 Fee determination letter to the contractor;
2 Performance Evaluation Report to the contractor;
Section 4
3 Contract Modification containing Earned Fee amounts and
contract term extensions if applicable to the M&O
contractor; and
6 NAP 540.3
12-22-16
4 Redacted Performance Evaluation Report to APM and the
NNSA FOIA office.
6. RESPONSIBILITIES.
a. Fee Determining Official (FDO).
(1) Approves annual implementation guidance.
(2) Approves PEMPs for signature. Determines the final performance rating
and earned fee/additional contract term (where applicable) for each M&O
contract.
(3) Disposition of unearned fee.
(4) Approves release of the PER to the M&O contractor.
b. Senior Procurement Executive (SPE) and Head of Contracting Activity (NA-
APM-10).
(1) Responsible for CPEP policy and implementation of the CPEP process.
(2) Prior to beginning of an evaluation period, prepares annual CPEP
guidance for FDO approval.
(3) Reviews and concurs on final implementation guidance prior to FDO
approval.
(4) Reviews and concurs on PEMPs and changes with the CO prior to
submission to FDO for approval.
(5) Reviews and concurs on draft PERs and FDO briefings prior to
submission to FDO.
(6) Obtains and communicates approval of PERs and earned fee to the FOMs.
(7) Reviews and concurs on draft FDO fee determination letter prior to
submission to FDO.
(8) Attends FDO strategy sessions, award fee determination meeting, and all
other CPEP-related meetings, as appropriate.
(9) Reviews/concurs on contractor performance evaluation information with
CO prior to public release.
(10) Serves as focal point for Management and Budget (MB) and Field Office
coordination for the disposition of unearned award fee.
NAP 540.3
12-22-16
7
(11) Submits packages to FDO through NNSA Executive Secretariat process.
c. Field Office Manager.
(1) Oversees the performance evaluation of the M&O contractor.
(2) Coordinates closely with program and functional managers throughout
CPEP implementation.
(3) Incorporates input from program/functional and other offices as applicable
into draft PEMPs, IFRs, and PERs striving to reach consensus.
(4) Presents draft PEMP, and subsequent changes, to APM for program and
functional manager formal concurrence prior to submission to FDO for
approval.
(5) Prepares draft cumulative IFR and briefings, incorporating program and
functional office inputs for those offices’ areas of ownership, and obtains
program/functional office concurrences prior to finalization of documents
and submission to APM.
(6) Submits PER and FDO briefing to APM for program and functional
offices’ formal concurrence prior to submission to FDO.
(7) Briefs award fee recommendation to FDO.
(8) In the event the FDO determination results in substantial changes to the
approved PER, submits changes to APM for program and functional
manager concurrence.
(9) Coordinates with program/functional offices when issuing IFR and PER to
the M&O contractor.
d. Federal Program Manager (PM)/Federal Project Director (FPD)/Functional
Manager (FM).
(1) Identifies which program requirements/technical activities are suitable for
performance-based contracting methods (i.e., goals/performance
evaluation criteria).
(2) Reviews Subject Matter Expert (SME) mapping to ensure goals are
mapped to baselined scope, cost, and schedule information, and NNSA
goals, and priorities as described in Work Authorizations/Implementation
Plans and other applicable documents, to ensure effective measurement of
contractor performance.
8 NAP 540.3
12-22-16
Section 5
(3) Participates in development of PEMP goals for the program manager’s
area of ownership/responsibility in coordination with field office.
(4) Recommends COR(s) to the Contracting Officer (CO) for area of
responsibility.
(5) Provides performance inputs to the field office contracting officer for
incorporation into the draft PEMP, Performance Ratings, IFRs, and PERs
for areas of ownership/responsibility and concurs on final PEMP,
Performance Ratings and PERs.
(6) Participates with Field Office in feedback to M&O contractor when IFR
and PER are issued, as applicable.
e. Contracting Officer’s Representative (COR).
(1) Serves as the eyes and ears for evaluating contractor performance for both
the CO and PM/FPD/FM for assigned program efforts.
(2) Serves as the communication link between PM/FPD/FM, the CO, and the
contractor in accordance with the COR delegation letter from the CO.
(3) Responsible for validation of work performed, and inspection/acceptance
of contract performance to ensure it meets the contract requirements.
(4) Provides contractor performance evaluation input to the PM/FPD/FM and
CO relative to the PEMP and in support of the PER.
(5) Assists the PM/FPD/FM and CO in PEMP development and coordination
of any changes in the PEMP.
(6) Assists the PM/FPD/FM and CO in IFR and PER development.
f. Contracting Officer (CO).
(1) The person with the authority to enter into, administer, or terminate
contracts and make related determinations and findings, and obligate the
government.
(2) Serves as primary field office focal point for preparation of CPEP
documents.
(3) Issues contract requirements and ensures program requirement
descriptions are compliant with performance-based contracting methods.
(4) Supports implementation of the CPEP process.
NAP 540.3
12-22-16
9
(5) Leads the coordination of all actions on the PEMP, PER, and periodic
reports and briefings as necessary.
(6) Issues contract modifications for all fee-related contractual matters in
accordance with the terms and conditions of the contract.
(7) Signs and issues the PEMP and PER (and changes thereto) and ensures
consistency with the terms and conditions of the contract and applicable
regulations and statutes.
(8) Issues PEMP/IFR/PER to M&O contractor.
(9) Serves as focal point for receipt of contractor’s self-assessment report.
g. Subject Matter Experts involved in the CPEP.
(1) Support the organization in implementation of the CPEP responsibilities.
NNSA offices have various positions within their specific office structure
that act as SMEs, such as lead performance officer, integrator, etc.,
depending on the office’s organizational structure.
(2) Participate in the PEMP development process.
(3) Recommend PEMP objectives and key outcomes to the Federal PM/FM
based on NNSA Strategic Goals and Priorities and adjust as needed in
coordination with the Field Office.
(4) Coordinate and obtain concurrence with other SMEs in oversight of
contractor performance.
(5) Monitor contractor performance and provide performance input to the
COR or PM/FPD/FM as applicable.
(6) Discuss resolution of performance issues/ratings and provide periodic
status reports to PM/FPD/FM and Field Office Managers.
(7) Map goals to baselined scope, cost, and schedule information, and NNSA
goals and priorities as described in Work Authorizations/Implementation
Plans and other applicable documents, to ensure effective measurement of
contractor performance.
7. REFERENCES.
Section 6
a. FAR 16.4, Incentive Contracts
b. DEAR 970.1100-1, Performance-Based Contracting
10 NAP 540.3
12-22-16
8. CONTACT. Office of Acquisition Management (NA-APM-10), Kim Gallegos, 505-845-
4745.
BY ORDER OF THE ADMINISTRATOR:
1. Appendix: Supplemental Definitions for FAR 16.40l (e) (3)
NAP 540.3
12-22-16
Appendix 1
AP1-1
APPENDIX 1: Supplemental Definitions for FAR 16.401(e) (3)
Supplemental Award Fee Rating Definitions
For NNSA Performance Evaluation and Measurement Plan (PEMP)
Excellent 91%-
100%
Contractor has exceeded almost all of the objectives and key
outcomes under the goals in the PEMP and has met overall cost,
schedule, and technical performance requirements of the contract in
the aggregate for the evaluation period. This performance level is
evidenced by at least one significant accomplishment, or a
combination of accomplishments that significantly outweigh very
minor issues, if any. No significant issues in performance exist.
Very Good 76%-
90%
Contractor has exceeded many of the objectives and key outcomes
under the goals in the PEMP and has met overall cost, schedule, and
technical performance requirements of the contract in the aggregate
for the evaluation period. This performance level is evidenced by
accomplishments that greatly outweigh issues. No significant issues
in performance exist.
Good 51%-
75%
Contractor has exceeded some of the objectives and key outcomes
under the goals in the PEMP and has met overall cost, schedule, and
technical performance requirements of the contract in the aggregate
for the evaluation period. This performance level is evidenced by
accomplishments that slightly outweigh issues. No significant issues
in performance exist.
Satisfactory
No
greater
than
50%
Contractor has met overall cost, schedule, and technical performance
requirements of the contract in the aggregate as defined and
measured against the objectives and key outcomes under the goals in
the PEMP for the evaluation period. This performance level is
evidenced by issues that slightly outweigh accomplishments.
Unsatisfactory 0%
Contractor has failed to meet overall cost, schedule, and technical
performance requirements of the contract in the aggregate as defined
and measured against the objectives and key outcomes under the
goals in the PEMP for the award-fee evaluation period. This
performance level is evidenced by issues that significantly outweigh
accomplishments, if any.
Definitions
Accomplishment is an achievement or success in the performance of contract requirements that
exceeds standards or expectations. Examples might be performing full contract requirements
under budget while meeting or beating schedule baselines or performing additional scope within
2 NAP 540.3
12-22-16
the initial cost targets with no negative effect on requirements or other programs, indicating
continued performance improvement.
Issue is a point in question or a matter that raises concerns regarding successful performance of
contract requirements within scope, cost (budget), and schedule baselines or concern of negative
effect on requirements or other programs, indicating a decline in performance that needs
attention and improvement.